EQUIPMENT INSTALLATION APPENDIX F: R56 COMPLIANCE CHECKLIST ❐ Primary SPDs for data network circuits are installed as required. ❐ Secondary SPDs for data network circuits are installed as required. ❐ All RF transmission lines, including unused spares, have coaxial RF type SPDs properly installed. ❐ If a tower top amplifier is installed, the sample port and its control cables have SPDs installed as required. ❐ Tower lighting system AC power and data/alarm circuits have SPDs properly installed as required. F.6 EQUIPMENT INSTALLATION ❐ Equipment spacing and aisle widths are adequate and conform to guidelines. ❐ Equipment is level and plumb. ❐ Equipment is square with respect to surrounding equipment and walls. ❐ Where applicable, seismic installation practices are observed. ❐ Cabinets and racks are secured as required. ❐ Cable groups of different function maintain minimum separation or 5 cm (2 in) as required. ❐ RF cables meet or exceed minimum bending radius requirements. ❐ Plenum-rated cables are installed where required. ❐ Cables are of adequate length with no excess. ❐ Cables are properly secured at the required intervals. ❐ AC power conductors installed in cable trays meet minimum installation requirements. ❐ Cables are properly identified at both ends using a standard labeling system. ❐ Distribution frame wiring confirms to the proper punch-down or wire wrap techniques. ❐ CAT-5 or CAT-6 data cables maintain the proper separation distance from AC power cables. ❐ CAT-5 or CAT-6 data cables do not have sharp ends. ❐ CAT-5 or CAT-6 cables meet all other installation requirements. ❐ Cables located below raised flooring systems are properly installed. ❐ Cables located above suspended ceilings are properly installed. ❐ Electrostatic discharge handling practices are observed as required. F-6 68P81089E50-B 9/1/05

I NDEX Index Index AC power cabling to equipment .............................................. 9-16 SPD component requirements ................................. 7-5 SPD installation requirements ............................... 7-33 SPD requirements for facilities .......................7-5, 7-27 acceptable rectifier types ............................................... 6-19 acceptance testing ......................................................... 2-16 access point and wireless router grounding .................. 4-84 air conditioning ............................................................. 3-13 air terminals ................................................................... 2-21 alarms fire detection .......................................................... 3-26 temperature ............................................................ 3-16 backfilling requirements ............................................... 2-13 batteries charging ................................................................. 6-33 installation .............................................................. 6-34 maintenance disconnect ......................................... 6-35 multiple .................................................................. 6-32 required signage ..................................................... 6-30 temperature requirements ...................................... 6-33 battery backup duration ................................................. 6-31 battery backup, high rate applications ........................... 6-31 battery backup, long duration ........................................ 6-31 battery containment area ............................................... 6-30 battery safety ................................................................. 6-28 battery safety equipment ............................................... 3-30 battery systems .............................................................. 6-27 bending radius for grounding conductors ..................... 4-29 bonding cable tray sections ........................................... 5-45 bonding grid .................................................................. 5-68 bonding jumper ............................................................. 5-30 bonding methods exothermic welding ................................................ 4-41 irreversible high-compression fittings ................... 4-43 A B alternate power sources ................................................ 6-25 Americans With Disabilities Act .................................... 2-9 anchoring equipment to raised floors ............................. 9-9 ancillary support apparatus bonding to MGB .................................................... 5-46 antenna masts grounding ............................................................... 4-74 antennas EME considerations ................................................A-1 interference protection recommendations ............... 8-1 loading requirements ............................................. 2-23 protection requirements (final output-to-antenna) .. 8-2 anti-oxidant ................................................................... 5-32 arctic regions grounding in .......................................................... 4-99 Australian standards ....................................................... 1-8 bonding requirements to MGB, SSGB, IPGB, and ground bus conductor ................................................................. 5-40 bonding SSGB to grounding system ............................ 5-18 bonding to external grounding system .......................... 4-40 bonding to ground (earth) bus conductors .................... 5-38 bonding to internal ground system ............................... 5-61 bonding to the MGB, SSGB And RGB ........................ 5-36 branch circuit breaker ..................................................... 6-8 building ground ring ..................................................... 4-22 buildings design requirements ................................................. 3-1 grounding ............................................................... 5-54 buildings/shelter definition ................................................................. 3-2 off-loading considerations ....................................... 3-7 buildings/shelters lighting ................................................................... 3-22 sealing .................................................................... 3-13 bus bar external grounding ................................................. 4-30 IGB ........................................................................ 5-29 rack ground ............................................................ 5-20 SSGB ..................................................................... 5-15 tower ground .......................................................... 4-32 68P81089E50-B 9/1/05 Index-1

I NDEX<br />

Index Index<br />

AC power<br />

cabling to equipment .............................................. 9-16<br />

SPD component requirements ................................. 7-5<br />

SPD installation requirements ............................... 7-33<br />

SPD requirements <strong>for</strong> facilities .......................7-5, 7-27<br />

acceptable rectifier types ............................................... 6-19<br />

acceptance testing ......................................................... 2-16<br />

access point <strong>and</strong> wireless router grounding .................. 4-84<br />

air conditioning ............................................................. 3-13<br />

air terminals ................................................................... 2-21<br />

alarms<br />

fire detection .......................................................... 3-26<br />

temperature ............................................................ 3-16<br />

backfilling requirements ............................................... 2-13<br />

batteries<br />

charging ................................................................. 6-33<br />

installation .............................................................. 6-34<br />

maintenance disconnect ......................................... 6-35<br />

multiple .................................................................. 6-32<br />

required signage ..................................................... 6-30<br />

temperature requirements ...................................... 6-33<br />

battery backup duration ................................................. 6-31<br />

battery backup, high rate applications ........................... 6-31<br />

battery backup, long duration ........................................ 6-31<br />

battery containment area ............................................... 6-30<br />

battery safety ................................................................. 6-28<br />

battery safety equipment ............................................... 3-30<br />

battery systems .............................................................. 6-27<br />

bending radius <strong>for</strong> grounding conductors ..................... 4-29<br />

bonding cable tray sections ........................................... 5-45<br />

bonding grid .................................................................. 5-68<br />

bonding jumper ............................................................. 5-30<br />

bonding methods<br />

exothermic welding ................................................ 4-41<br />

irreversible high-compression fittings ................... 4-43<br />

A<br />

B<br />

alternate power sources ................................................ 6-25<br />

Americans With Disabilities Act .................................... 2-9<br />

anchoring equipment to raised floors ............................. 9-9<br />

ancillary support apparatus<br />

bonding to MGB .................................................... 5-46<br />

antenna masts<br />

grounding ............................................................... 4-74<br />

antennas<br />

EME considerations ................................................A-1<br />

interference protection recommendations ............... 8-1<br />

loading requirements ............................................. 2-23<br />

protection requirements (final output-to-antenna) .. 8-2<br />

anti-oxidant ................................................................... 5-32<br />

arctic regions<br />

grounding in .......................................................... 4-99<br />

Australian <strong>st<strong>and</strong>ards</strong> ....................................................... 1-8<br />

bonding requirements to MGB, SSGB, IPGB, <strong>and</strong> ground bus<br />

conductor ................................................................. 5-40<br />

bonding SSGB to grounding system ............................ 5-18<br />

bonding to external grounding system .......................... 4-40<br />

bonding to ground (earth) bus conductors .................... 5-38<br />

bonding to internal ground system ............................... 5-61<br />

bonding to the MGB, SSGB <strong>And</strong> RGB ........................ 5-36<br />

branch circuit breaker ..................................................... 6-8<br />

building ground ring ..................................................... 4-22<br />

buildings<br />

design requirements ................................................. 3-1<br />

grounding ............................................................... 5-54<br />

buildings/shelter<br />

definition ................................................................. 3-2<br />

off-loading considerations ....................................... 3-7<br />

buildings/shelters<br />

lighting ................................................................... 3-22<br />

sealing .................................................................... 3-13<br />

bus bar<br />

external grounding ................................................. 4-30<br />

IGB ........................................................................ 5-29<br />

rack ground ............................................................ 5-20<br />

SSGB ..................................................................... 5-15<br />

tower ground .......................................................... 4-32<br />

68P81089E50-B 9/1/05 Index-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!