standards and guidelines for communication sites - Radio And ...
standards and guidelines for communication sites - Radio And ... standards and guidelines for communication sites - Radio And ...
EQUIPMENT INSTALLATION APPENDIX F: R56 COMPLIANCE CHECKLIST ❐ Primary SPDs for data network circuits are installed as required. ❐ Secondary SPDs for data network circuits are installed as required. ❐ All RF transmission lines, including unused spares, have coaxial RF type SPDs properly installed. ❐ If a tower top amplifier is installed, the sample port and its control cables have SPDs installed as required. ❐ Tower lighting system AC power and data/alarm circuits have SPDs properly installed as required. F.6 EQUIPMENT INSTALLATION ❐ Equipment spacing and aisle widths are adequate and conform to guidelines. ❐ Equipment is level and plumb. ❐ Equipment is square with respect to surrounding equipment and walls. ❐ Where applicable, seismic installation practices are observed. ❐ Cabinets and racks are secured as required. ❐ Cable groups of different function maintain minimum separation or 5 cm (2 in) as required. ❐ RF cables meet or exceed minimum bending radius requirements. ❐ Plenum-rated cables are installed where required. ❐ Cables are of adequate length with no excess. ❐ Cables are properly secured at the required intervals. ❐ AC power conductors installed in cable trays meet minimum installation requirements. ❐ Cables are properly identified at both ends using a standard labeling system. ❐ Distribution frame wiring confirms to the proper punch-down or wire wrap techniques. ❐ CAT-5 or CAT-6 data cables maintain the proper separation distance from AC power cables. ❐ CAT-5 or CAT-6 data cables do not have sharp ends. ❐ CAT-5 or CAT-6 cables meet all other installation requirements. ❐ Cables located below raised flooring systems are properly installed. ❐ Cables located above suspended ceilings are properly installed. ❐ Electrostatic discharge handling practices are observed as required. F-6 68P81089E50-B 9/1/05
I NDEX Index Index AC power cabling to equipment .............................................. 9-16 SPD component requirements ................................. 7-5 SPD installation requirements ............................... 7-33 SPD requirements for facilities .......................7-5, 7-27 acceptable rectifier types ............................................... 6-19 acceptance testing ......................................................... 2-16 access point and wireless router grounding .................. 4-84 air conditioning ............................................................. 3-13 air terminals ................................................................... 2-21 alarms fire detection .......................................................... 3-26 temperature ............................................................ 3-16 backfilling requirements ............................................... 2-13 batteries charging ................................................................. 6-33 installation .............................................................. 6-34 maintenance disconnect ......................................... 6-35 multiple .................................................................. 6-32 required signage ..................................................... 6-30 temperature requirements ...................................... 6-33 battery backup duration ................................................. 6-31 battery backup, high rate applications ........................... 6-31 battery backup, long duration ........................................ 6-31 battery containment area ............................................... 6-30 battery safety ................................................................. 6-28 battery safety equipment ............................................... 3-30 battery systems .............................................................. 6-27 bending radius for grounding conductors ..................... 4-29 bonding cable tray sections ........................................... 5-45 bonding grid .................................................................. 5-68 bonding jumper ............................................................. 5-30 bonding methods exothermic welding ................................................ 4-41 irreversible high-compression fittings ................... 4-43 A B alternate power sources ................................................ 6-25 Americans With Disabilities Act .................................... 2-9 anchoring equipment to raised floors ............................. 9-9 ancillary support apparatus bonding to MGB .................................................... 5-46 antenna masts grounding ............................................................... 4-74 antennas EME considerations ................................................A-1 interference protection recommendations ............... 8-1 loading requirements ............................................. 2-23 protection requirements (final output-to-antenna) .. 8-2 anti-oxidant ................................................................... 5-32 arctic regions grounding in .......................................................... 4-99 Australian standards ....................................................... 1-8 bonding requirements to MGB, SSGB, IPGB, and ground bus conductor ................................................................. 5-40 bonding SSGB to grounding system ............................ 5-18 bonding to external grounding system .......................... 4-40 bonding to ground (earth) bus conductors .................... 5-38 bonding to internal ground system ............................... 5-61 bonding to the MGB, SSGB And RGB ........................ 5-36 branch circuit breaker ..................................................... 6-8 building ground ring ..................................................... 4-22 buildings design requirements ................................................. 3-1 grounding ............................................................... 5-54 buildings/shelter definition ................................................................. 3-2 off-loading considerations ....................................... 3-7 buildings/shelters lighting ................................................................... 3-22 sealing .................................................................... 3-13 bus bar external grounding ................................................. 4-30 IGB ........................................................................ 5-29 rack ground ............................................................ 5-20 SSGB ..................................................................... 5-15 tower ground .......................................................... 4-32 68P81089E50-B 9/1/05 Index-1
- Page 457 and 458: STANDARDS AND GUIDELINES FOR COMMUN
- Page 459 and 460: STANDARDS AND GUIDELINES FOR COMMUN
- Page 461 and 462: STANDARDS AND GUIDELINES FOR COMMUN
- Page 463 and 464: STANDARDS AND GUIDELINES FOR COMMUN
- Page 465 and 466: STANDARDS AND GUIDELINES FOR COMMUN
- Page 467 and 468: APPENDIX C PROTECTING AGAINST ELECT
- Page 469 and 470: STANDARDS AND GUIDELINES FOR COMMUN
- Page 471 and 472: APPENDIX D GROUNDING (EARTHING) ELE
- Page 473 and 474: STANDARDS AND GUIDELINES FOR COMMUN
- Page 475 and 476: STANDARDS AND GUIDELINES FOR COMMUN
- Page 477 and 478: STANDARDS AND GUIDELINES FOR COMMUN
- Page 479 and 480: STANDARDS AND GUIDELINES FOR COMMUN
- Page 481 and 482: STANDARDS AND GUIDELINES FOR COMMUN
- Page 483 and 484: STANDARDS AND GUIDELINES FOR COMMUN
- Page 485 and 486: STANDARDS AND GUIDELINES FOR COMMUN
- Page 487 and 488: STANDARDS AND GUIDELINES FOR COMMUN
- Page 489 and 490: STANDARDS AND GUIDELINES FOR COMMUN
- Page 491 and 492: STANDARDS AND GUIDELINES FOR COMMUN
- Page 493 and 494: STANDARDS AND GUIDELINES FOR COMMUN
- Page 495 and 496: STANDARDS AND GUIDELINES FOR COMMUN
- Page 497 and 498: APPENDIX E GENERAL CONVERSIONS AND
- Page 499 and 500: STANDARDS AND GUIDELINES FOR COMMUN
- Page 501 and 502: STANDARDS AND GUIDELINES FOR COMMUN
- Page 503 and 504: APPENDIX F R56 COMPLIANCE CHECKLIST
- Page 505 and 506: STANDARDS AND GUIDELINES FOR COMMUN
- Page 507: STANDARDS AND GUIDELINES FOR COMMUN
- Page 511 and 512: STANDARDS AND GUIDELINES FOR COMMUN
- Page 513 and 514: STANDARDS AND GUIDELINES FOR COMMUN
- Page 515 and 516: STANDARDS AND GUIDELINES FOR COMMUN
- Page 517 and 518: STANDARDS AND GUIDELINES FOR COMMUN
I NDEX<br />
Index Index<br />
AC power<br />
cabling to equipment .............................................. 9-16<br />
SPD component requirements ................................. 7-5<br />
SPD installation requirements ............................... 7-33<br />
SPD requirements <strong>for</strong> facilities .......................7-5, 7-27<br />
acceptable rectifier types ............................................... 6-19<br />
acceptance testing ......................................................... 2-16<br />
access point <strong>and</strong> wireless router grounding .................. 4-84<br />
air conditioning ............................................................. 3-13<br />
air terminals ................................................................... 2-21<br />
alarms<br />
fire detection .......................................................... 3-26<br />
temperature ............................................................ 3-16<br />
backfilling requirements ............................................... 2-13<br />
batteries<br />
charging ................................................................. 6-33<br />
installation .............................................................. 6-34<br />
maintenance disconnect ......................................... 6-35<br />
multiple .................................................................. 6-32<br />
required signage ..................................................... 6-30<br />
temperature requirements ...................................... 6-33<br />
battery backup duration ................................................. 6-31<br />
battery backup, high rate applications ........................... 6-31<br />
battery backup, long duration ........................................ 6-31<br />
battery containment area ............................................... 6-30<br />
battery safety ................................................................. 6-28<br />
battery safety equipment ............................................... 3-30<br />
battery systems .............................................................. 6-27<br />
bending radius <strong>for</strong> grounding conductors ..................... 4-29<br />
bonding cable tray sections ........................................... 5-45<br />
bonding grid .................................................................. 5-68<br />
bonding jumper ............................................................. 5-30<br />
bonding methods<br />
exothermic welding ................................................ 4-41<br />
irreversible high-compression fittings ................... 4-43<br />
A<br />
B<br />
alternate power sources ................................................ 6-25<br />
Americans With Disabilities Act .................................... 2-9<br />
anchoring equipment to raised floors ............................. 9-9<br />
ancillary support apparatus<br />
bonding to MGB .................................................... 5-46<br />
antenna masts<br />
grounding ............................................................... 4-74<br />
antennas<br />
EME considerations ................................................A-1<br />
interference protection recommendations ............... 8-1<br />
loading requirements ............................................. 2-23<br />
protection requirements (final output-to-antenna) .. 8-2<br />
anti-oxidant ................................................................... 5-32<br />
arctic regions<br />
grounding in .......................................................... 4-99<br />
Australian <strong>st<strong>and</strong>ards</strong> ....................................................... 1-8<br />
bonding requirements to MGB, SSGB, IPGB, <strong>and</strong> ground bus<br />
conductor ................................................................. 5-40<br />
bonding SSGB to grounding system ............................ 5-18<br />
bonding to external grounding system .......................... 4-40<br />
bonding to ground (earth) bus conductors .................... 5-38<br />
bonding to internal ground system ............................... 5-61<br />
bonding to the MGB, SSGB <strong>And</strong> RGB ........................ 5-36<br />
branch circuit breaker ..................................................... 6-8<br />
building ground ring ..................................................... 4-22<br />
buildings<br />
design requirements ................................................. 3-1<br />
grounding ............................................................... 5-54<br />
buildings/shelter<br />
definition ................................................................. 3-2<br />
off-loading considerations ....................................... 3-7<br />
buildings/shelters<br />
lighting ................................................................... 3-22<br />
sealing .................................................................... 3-13<br />
bus bar<br />
external grounding ................................................. 4-30<br />
IGB ........................................................................ 5-29<br />
rack ground ............................................................ 5-20<br />
SSGB ..................................................................... 5-15<br />
tower ground .......................................................... 4-32<br />
68P81089E50-B 9/1/05 Index-1