APPENDIX<br />

F<br />

R56 COMPLIANCE CHECKLIST F<br />

This checklist is provided as a guide to help prepare a site. The checklist is not a substitute <strong>for</strong><br />

the audit <strong>for</strong>m <strong>and</strong> is <strong>for</strong> use as a reference only.<br />

Ensure that a copy of the Project Manager’s compliance sheet has been completed <strong>and</strong> certified<br />

<strong>for</strong> the R56 auditor be<strong>for</strong>e the audit begins.<br />

F.1 BUILDING DESIGN AND INSTALLATION<br />

❐ Ceiling height is sufficient <strong>for</strong> equipment installation.<br />

❐ Cable tray system meets requirements.<br />

❐ Floor has been sealed as required.<br />

❐ All transmission line entry ports, holes, or openings that penetrate the outer surface<br />

of the building are sealed as required.<br />

❐ Lighting is adequate.<br />

❐ Appropriate air conditioning is provided.<br />

❐ Fire suppression equipment has been installed.<br />

❐ First aid kit is available.<br />

❐ Personal protective safety equipment is available <strong>for</strong> personnel working around<br />

batteries.<br />

❐ Telephone, microwave link or cellular phone is available at the site.<br />

❐ Phone numbers of importance are posted.<br />

❐ Minimum required signage is posted in accordance with local regulations.<br />

F.2 EXTERNAL GROUNDING (EARTHING) ELECTRODE SYSTEM<br />

❐ External Ground Bus Bar installed at transmission line entry point.<br />

❐ Lightning exposure at the site has been reviewed <strong>and</strong> considered.<br />

❐ All grounding electrodes at the site are bonded together, <strong>for</strong>ming a grounding<br />

electrode system.<br />

❐ Grounding electrodes installed meet specifications <strong>and</strong> installation requirements.<br />

❐ Concrete-encased electrodes are considered <strong>for</strong> new construction.<br />

❐ Building <strong>and</strong> tower ground rings (when required) are properly installed.<br />

❐ When used, radial grounding conductors are properly installed.<br />

68P81089E50-B 9/1/05 F-1