CLAMP-ON OHMMETER TESTING PROCEDURE APPENDIX D: GROUNDING (EARTHING) ELECTRODE SYSTEM TESTING/VERIFICATION<br />

Meter placed at this point will<br />

“see” single grounding electrode<br />

(or multiple grounding<br />

electrodes) as one grounding<br />

electrode <strong>and</strong> obtain an accurate<br />

measurement.<br />

Meter placed at this point<br />

around ALL THREE conductors<br />

will “see” all three grounding<br />

electrodes as one grounding<br />

electrode. As such, an accurate<br />

measurement is achieved.<br />

Multiple grounding electrodes<br />

bonded above ground<br />

Power Company feed<br />

ELECTRIC METER<br />

(UTILITY)<br />

To Telco or other utility connections<br />

Meter must be placed BELOW this point<br />

Clamp-on Ohmmeter<br />

Single grounding electrode<br />

(or multiple grounding<br />

electrodes bonded<br />

underground)<br />

Power Company feed<br />

ELECTRIC METER<br />

(UTILITY)<br />

To Telco or other utility connections<br />

Meter must be placed BELOW this point<br />

Meter placed at this point will<br />

“see” ONLY a single electrode<br />

instead of all three. As such,<br />

an INACCURATE<br />

measurement will result.<br />

FIGURE D-7 CLAMP-ON OHMMETER PLACEMENT FOR SINGLE GROUNDING ELECTRODE SYSTEM<br />

D-16 68P81089E50-B 9/1/05