FALL-OF-POTENTIAL METHOD TESTING PROCEDURE APPENDIX D: GROUNDING (EARTHING) ELECTRODE SYSTEM TESTING/VERIFICATION<br />

Shelter<br />

Site<br />

Boundary<br />

= Grounding Electrode<br />

System<br />

Diagonal<br />

3.05 m<br />

(10 ft.)<br />

6.1 m<br />

(20 ft.)<br />

9.2 m<br />

(30 ft.)<br />

NOTE: Connection point of meter X clip is typically to<br />

external master ground bus.<br />

Test Point (NOTE)<br />

(X connecting<br />

point)<br />

Tower<br />

12.2 m<br />

(40 ft.)<br />

15.2 m<br />

(50 ft.)<br />

Required placement of Z probe<br />

(In this example, the 30 x 30 ft. site<br />

requires 129 m (424 ft.) from the planar<br />

center of the grounding electrode<br />

system under test <strong>and</strong> the Z probe)<br />

FIGURE D-3 OUTER REFERENCE ELECTRODE (Z-PROBE) PLACEMENT FOR A TYPICAL SITE<br />

D-6 68P81089E50-B 9/1/05<br />

128 m<br />

(420 ft.)<br />

131 m<br />

(430 ft.)<br />

134 m<br />

(440 ft.)<br />

137 m<br />

(450 ft.)