CHAPTER<br />

9<br />

EQUIPMENT INSTALLATION 9<br />

9.1 INTRODUCTION<br />

This chapter includes the following topics:<br />

• “Facility Readiness” on page 9-1<br />

• “General Considerations <strong>for</strong> Layout, Work Areas, <strong>and</strong> Spacing” on page 9-2<br />

• “Seismic Considerations” on page 9-3<br />

• “Equipment Mounting Plumb <strong>and</strong> Squareness” on page 9-5<br />

• “Equipment Anchoring” on page 9-5<br />

• “Equipment Installation Within Racks or Cabinets” on page 9-10<br />

• “Ancillary Equipment Mounting” on page 9-10<br />

• “Equipment Cabling” on page 9-11<br />

• “Electrostatic Discharge Considerations” on page 9-31<br />

This chapter describes requirements <strong>and</strong> st<strong>and</strong>ard methods <strong>for</strong> <strong>communication</strong>s equipment<br />

installation.<br />

NOTE: The requirements described in this chapter shall be met be<strong>for</strong>e <strong>communication</strong>s equipment is installed<br />

in site.<br />

NOTE: This chapter assumes that all site <strong>and</strong> structure preparations have been per<strong>for</strong>med (including battery<br />

systems, generators, line transient voltage suppression systems, tower systems, <strong>and</strong> site/structure<br />

grounding systems).<br />

9.2 FACILITY READINESS<br />

Following all construction work, both exterior <strong>and</strong> interior, the site <strong>and</strong> facility (structure or<br />

shelter) shall be in a suitable condition <strong>for</strong> installation of <strong>communication</strong> equipment. In general,<br />

the following considerations must be observed:<br />

• Shelter exterior shall have final backfill <strong>and</strong> grade.<br />

• Path between shelter <strong>and</strong> access road shall be free of trackable debris.<br />

• Interior of facility shall be free of excessive dust or debris.<br />

• Site exterior area shall have all refuse related to the installation tasks described in this<br />

manual removed be<strong>for</strong>e occupancy.<br />