24.12.2012 Views

standards and guidelines for communication sites - Radio And ...

standards and guidelines for communication sites - Radio And ...

standards and guidelines for communication sites - Radio And ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

AC POWER SPD REQUIREMENTS CHAPTER 7: SURGE PROTECTIVE DEVICES<br />

To Alarms Panel<br />

(Recommended)<br />

To Alarms Panel<br />

(Recommended)<br />

Shelter, equipment room or area.<br />

SPD<br />

(Surge Suppressor)<br />

Type 1 SAD/MOV<br />

SPD<br />

(Surge<br />

Suppressor)<br />

Type 2 MOV<br />

To Alarms Panel<br />

Electrical meter <strong>and</strong><br />

service disconnect are<br />

located outside the<br />

equipment room or area<br />

within another building or<br />

structure.<br />

Utility<br />

Panelboard UPS<br />

Automatic<br />

Transfer<br />

Switch<br />

Main<br />

Panelboard<br />

with a main<br />

breaker<br />

Circuit<br />

Breaker<br />

Main Service<br />

Disconnect<br />

Type 3 SPD<br />

optional<br />

Meter<br />

To Alarms<br />

Panel<br />

FIGURE 7-7 SPD INTERCONNECT BLOCK DIAGRAM ‘F’<br />

NOTES: 1. The main service disconnect is located outside the equipment shelter, room or area, typically within another building or structure.<br />

2. The service to the equipment shelter, room or area is 3 conductors with ground <strong>for</strong> single phase or 4 conductors with<br />

ground <strong>for</strong> 3 phase.<br />

3. The step-down or isolation trans<strong>for</strong>mer creates a separately derived system where the neutral <strong>and</strong> ground conductors are<br />

bonded together within the trans<strong>for</strong>mer <strong>and</strong> bonded to the equipment room MGB. The main disconnect ground <strong>and</strong> the MGB<br />

shall be bonded to the site grounding electrode system.<br />

4. The Main panelboard shall use a main disconnecting device to serve the equipment area.<br />

5. The Type 1 <strong>and</strong> Type 2 SPDs shall be installed per the manufacturer’s installation instructions.<br />

6. All conductors between the SPDs <strong>and</strong> the associated disconnecting device shall be as short as possible <strong>and</strong> routed<br />

together with a minimal number of bends or angles of less than 90 degrees.<br />

7. The SPD disconnecting devices should be installed in the top most space available in the Utility Panelboard.<br />

8. Installation of Type 3 SPDs on each critical load is recommended where the level of exposure is high.<br />

9. Installation of Type 3 SPDs on each non-critical load that is located greater than 3 m (10 ft.) of conductor length from the<br />

panelboard is recommended where the level of exposure is high.<br />

7-16 68P81089E50-B 9/1/05<br />

UPS<br />

Panelboard<br />

Non-Critical<br />

Loads<br />

Critical<br />

Loads<br />

Generator<br />

Step Down or<br />

Isolation<br />

Trans<strong>for</strong>mer<br />

Utility Feed<br />

AC<br />

Type 3 SPD optional when greater<br />

than 10 conductor feet from<br />

panelboard.<br />

240/120 Single Phase<br />

208/120 3 Phase<br />

480/277 3 Phase

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!