24.12.2012 Views

standards and guidelines for communication sites - Radio And ...

standards and guidelines for communication sites - Radio And ...

standards and guidelines for communication sites - Radio And ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

STANDARDS AND GUIDELINES FOR COMMUNICATION SITES AC POWER SPD REQUIREMENTS<br />

To Alarms Panel<br />

(Recommended)<br />

Shelter, equipment room or area.<br />

SPD<br />

(Surge Suppressor)<br />

Type 1 SAD/MOV<br />

To Alarms Panel<br />

Electrical meter <strong>and</strong><br />

service disconnect are<br />

located outside the<br />

equipment shelter,<br />

room or area typically<br />

within another building<br />

or structure.<br />

UPS<br />

Utility<br />

Panelboard<br />

with a main<br />

breaker<br />

Step Down or<br />

Isolation<br />

Trans<strong>for</strong>mer<br />

Circuit<br />

Breaker<br />

Main Service<br />

Disconnect<br />

Type 3 SPED<br />

optional<br />

Meter<br />

FIGURE 7-4 SPD INTERCONNECT BLOCK DIAGRAM ‘C’<br />

NOTES: 1. The main service disconnect is located outside the equipment shelter, room or area, typically within another building or structure.<br />

2. The service to the equipment shelter, room or area is 3 conductors with ground <strong>for</strong> single phase or 4<br />

conductors with ground <strong>for</strong> 3 phase.<br />

3. The step-down or isolation trans<strong>for</strong>mer creates a separately derived system where the neutral <strong>and</strong> ground conductors are<br />

bonded together within the trans<strong>for</strong>mer <strong>and</strong> bonded to the equipment room MGB. The main disconnect ground <strong>and</strong> the MGB<br />

shall be bonded to the site grounding electrode system at the same point.<br />

4. The Utility Panelboard shall use a main disconnecting device to serve the equipment area.<br />

5. The Type 1 SPD shall be installed per the manufacturer's installation instructions.<br />

6. All conductors between the SPD <strong>and</strong> the associated disconnecting device shall be as short as possible <strong>and</strong> routed together<br />

with a minimal number of bends or angles of less than 90 degrees.<br />

7. The SPD disconnecting device should be installed in the top most space available in the Utility Panelboard.<br />

8. Installation of Type 3 SPDs on each critical load is recommended where the level of exposure is high.<br />

9. Installation of Type 3 SPDs on each non-critical load that is located greater than 3 m (10 ft.) of conductor length from the<br />

panelboard is recommended where the level of exposure is high.<br />

68P81089E50-B 9/1/05 7-13<br />

UPS<br />

Panelboard<br />

Non-Critical<br />

Loads<br />

Type 3 SPD optional<br />

when greater than 10<br />

conductor feet from<br />

panelboard.<br />

Critical<br />

Loads<br />

Utility Feed<br />

AC<br />

240/120 Single Phase<br />

208/120 3 Phase<br />

480/277 3 Phase

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!