11.02.2022 Views

cessna-172-training-supplement

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Traffic Pattern Operations

Pattern Briefings should include:

• Flap Setting

• Type of Approach & Landing (Short-Field, Soft-Field, etc.)

• Final Approach Speed

• Aiming Point

• Touchdown Point

Abeam Touchdown Point

• "Before Landing Checklist"

• Resume Landing Profile

(following pages)

At TPA

• Reduce Power –

Maintain 90 KIAS

(Approx. 2000 RPM)

Established on Downwind

• Pattern Briefing

45°

90°

V X , V Y Climb

300' Below TPA

• Turn Crosswind

Arrival Procedures • 41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!