27.01.2022 Views

Power Point Presentation (PPT) on RERA

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table A

Building /Wing Number_____(to be prepared separately for each Building /Wing of

the Project)

Sr. No Tasks /Activity Percentage

of work done

1 Excavation

2 _________ number of Basement(s) and Plinth

3 _________ number of Podiums

4 Stilt Floor

5 __________number of Slabs of Super Structure

6 Internal walls, Internal Plaster,

Floorings within Flats/Premises,

Doors and Windows to each of the Flat/Premises

99

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!