ClearPath IX Systems Installation and Configuration Guide
ClearPath IX Systems Installation and Configuration Guide ClearPath IX Systems Installation and Configuration Guide
Introduction and Installation Overview 5. Install and configure SPO/HMP Console and related software as described in Section 10. 6. Install SPO workstation software and enable communication between the SPO workstation and each Intel node as described in Section 11. 7. Configure monitored nodes as described in Section 12. 8. Install the basic OS 2200 IOE on each OS 2200 node as described in Section 13. 9. Before testing the private LAN interconnect as described in the next step, configure CMS 1100 with required IP addresses (16.2.1). 10. Verify that the OS 2200 node or nodes can communicate with the Intel node or nodes by performing interconnect tests as described in Section 14. Install the remaining IOE and customize the site as described in Sections 15, 16, and 17. 1–12 Version 009B (Web Only) 7850 5104–009
Section 2 Installation Checklists and Tips This section provides the following: • Preinstallation checklist (2.1) • Installation checklist (2.2) • Set of installation tips (2.3) • Description of additional site requirements (2.4) • Procedure for configuring and using the monitor concentrator (2.5) 2.1. Preinstallation Checklist Before beginning installation on any node, ensure that the site • Is ready for the installation and that all installation information has been obtained per the relevant Technical Information Bulletin (TIB). • Has a correct operations database (ODB) based on customer-specific configuration information. • Has planned for migration from an existing 1100 or 2200 Series system using the procedures in the ClearPath HMP IX and 2200 Systems Software Planning and Migration Overview. • Has planned for additional requirements as described later in this section (2.4), including − Obtaining workstation hardware required to support certain Unisys products (2.4.1). − Planning for a network if the site does not currently have one (2.4.2). − Planning to integrate with an existing SPO server (optional), if the site already has one (2.4.3). You should also obtain the ClearPath HMP IX installation checklist. You can print this checklist or view it directly from the Planning and Installation Information Web page on Engineering PRIMUS Application System (EPAS) or from the Service and Support Web site. These are the uniform resource locators (URL) for the pages: http://epas1.rsvl.unisys.com/unisys/2200/cfswww/prodsupp/install.htm http://www.support.unisys.com/unisys/2200/cfswww/prodsupp/install.htm 7850 5104–009 Version 009B (Web Only) 2–1
- Page 1 and 2: Unisys e-@ction ClearPath Enterpris
- Page 3 and 4: Unisys e-@ction ClearPath Enterpris
- Page 5 and 6: Unisys e-@ction ClearPath Enterpris
- Page 7 and 8: Contents About This Guide .........
- Page 9 and 10: Contents 4.4. Installing and Config
- Page 11 and 12: Contents 8.4. Installing the UnixWa
- Page 13 and 14: Contents 11.6. Configuring the FTP
- Page 15 and 16: Contents 14.4. Installing DSPER ...
- Page 17 and 18: Appendix D. Configuring the FDDI In
- Page 19 and 20: Figures 1-1. ClearPath IX Server Co
- Page 21 and 22: Tables 1-1. Operating System Levels
- Page 23 and 24: Examples 14-1. A Minimum CMS 1100 C
- Page 25 and 26: About This Guide Purpose Scope This
- Page 27 and 28: How to Use This Guide About This Gu
- Page 29 and 30: About This Guide Section 15. Instal
- Page 31 and 32: About This Guide ClearPath HMP IX S
- Page 33 and 34: About This Guide This guide gives c
- Page 35 and 36: About This Guide OS 2200 Exec Syste
- Page 37 and 38: Notation Conventions About This Gui
- Page 39 and 40: Section 1 Introduction and Installa
- Page 41 and 42: Table 1-2. ClearPath IX Server Comp
- Page 43 and 44: 1.2.2. Installation Procedure Overv
- Page 45 and 46: Introduction and Installation Overv
- Page 47 and 48: • Configure a resilient 2200 node
- Page 49: External Communications Interface O
- Page 53 and 54: Table 2-1. General Installation Inf
- Page 55 and 56: Component Windows 2000 or Windows N
- Page 57 and 58: 2.3. Installation Tips Caution Inst
- Page 59 and 60: Finding Correct UnixWare and EBRS L
- Page 61 and 62: 2.4.1. DEPCON Workstation Requireme
- Page 63 and 64: Caution Installation Checklists and
- Page 65 and 66: Installation Checklists and Tips 3.
- Page 67 and 68: Section 3 Installing Windows 2000 A
- Page 69 and 70: Installing Windows 2000 Advanced Se
- Page 71 and 72: Installing Windows 2000 Advanced Se
- Page 73 and 74: Installing Windows 2000 Advanced Se
- Page 75 and 76: Installing Windows 2000 Advanced Se
- Page 77 and 78: Installing Windows 2000 Advanced Se
- Page 79 and 80: Installing Windows 2000 Advanced Se
- Page 81 and 82: Installing Windows 2000 Advanced Se
- Page 83 and 84: Installing Windows 2000 Advanced Se
- Page 85 and 86: Installing Windows 2000 Advanced Se
- Page 87 and 88: Installing Windows 2000 Advanced Se
- Page 89 and 90: Installing Windows 2000 Advanced Se
- Page 91 and 92: Installing Windows 2000 Advanced Se
- Page 93 and 94: Installing Windows 2000 Advanced Se
- Page 95 and 96: Section 4 Installing Windows NT Ser
- Page 97 and 98: Installing Windows NT Server, Enter
- Page 99 and 100: Installing Windows NT Server, Enter
Section 2<br />
<strong>Installation</strong> Checklists <strong>and</strong> Tips<br />
This section provides the following:<br />
• Preinstallation checklist (2.1)<br />
• <strong>Installation</strong> checklist (2.2)<br />
• Set of installation tips (2.3)<br />
• Description of additional site requirements (2.4)<br />
• Procedure for configuring <strong>and</strong> using the monitor concentrator (2.5)<br />
2.1. Preinstallation Checklist<br />
Before beginning installation on any node, ensure that the site<br />
• Is ready for the installation <strong>and</strong> that all installation information has been obtained per<br />
the relevant Technical Information Bulletin (TIB).<br />
• Has a correct operations database (ODB) based on customer-specific configuration<br />
information.<br />
• Has planned for migration from an existing 1100 or 2200 Series system using the<br />
procedures in the <strong>ClearPath</strong> HMP <strong>IX</strong> <strong>and</strong> 2200 <strong>Systems</strong> Software Planning <strong>and</strong><br />
Migration Overview.<br />
• Has planned for additional requirements as described later in this section (2.4),<br />
including<br />
− Obtaining workstation hardware required to support certain Unisys products<br />
(2.4.1).<br />
− Planning for a network if the site does not currently have one (2.4.2).<br />
− Planning to integrate with an existing SPO server (optional), if the site already has<br />
one (2.4.3).<br />
You should also obtain the <strong>ClearPath</strong> HMP <strong>IX</strong> installation checklist. You can print this<br />
checklist or view it directly from the Planning <strong>and</strong> <strong>Installation</strong> Information Web page on<br />
Engineering PRIMUS Application System (EPAS) or from the Service <strong>and</strong> Support Web<br />
site. These are the uniform resource locators (URL) for the pages:<br />
http://epas1.rsvl.unisys.com/unisys/2200/cfswww/prodsupp/install.htm<br />
http://www.support.unisys.com/unisys/2200/cfswww/prodsupp/install.htm<br />
7850 5104–009 Version 009B (Web Only) 2–1