24.12.2012 Views

ClearPath IX Systems Installation and Configuration Guide

ClearPath IX Systems Installation and Configuration Guide

ClearPath IX Systems Installation and Configuration Guide

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Section 14<br />

Verifying the Interconnects <strong>and</strong><br />

Achieving Hardware RFU<br />

Following installation of OS 2200 software from fast-load tape HMP-OE1, you must verify<br />

that the OS 2200 nodes <strong>and</strong> each Intel node can communicate via the internal interconnect<br />

(14.1).<br />

Table 14–1 lists procedures that require you to have information or installation media<br />

available at the time of installation. Obtain that information or media before beginning.<br />

With this checklist completed <strong>and</strong> all installation software media readily available, the<br />

procedures in this section take 3 hours.<br />

Table 14–1. Checklist for Verifying Interconnects <strong>and</strong> Achieving RFU<br />

√ Media or Information Required<br />

14.1. Verifying Interconnect Communications<br />

Media needed:<br />

Applicable tape containing microcode <strong>and</strong> the PING test for verifying communications as follows:<br />

• Model <strong>IX</strong>4400<br />

CEC500 tape (minimum level of 1R8 is required, except when the 2200 node is configured<br />

for resilient partitions, then a minimum level of 1R11 is required to execute the PING test for<br />

the second 2200 node)<br />

Host LAN Controller-2 (HLC-2) microcode on cartridge tape. Found in the HLC2-FMK package<br />

that comes with the HLC-2.<br />

• Model <strong>IX</strong>5000 Series or <strong>IX</strong>4800 server<br />

CC6000 tape or CC3000 tape. CC6000 supersedes CC3000 for all configurations at<br />

Plateau 2.0. At Plateau 2.0 a minimum CC6000 level of 2R1 is required. Below Plateau 2.0,<br />

a minimum CC3000 level of 1R1 is required, except when the 2200 node is configured for<br />

resilient partitions, then a minimum level of 1R2 is required to execute the PING test for the<br />

second 2200 node.<br />

Channel adapter microcode tape, called FDDI/ETHERNET CA-MCODE<br />

The Diagnostic Software Peripheral Equipment Routines (DSPER) also should be installed following<br />

installation of the CEC tape.<br />

continued<br />

7850 5104–009 Version 009B (Web Only) 14–1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!