Installing the Basic OS 2200 IOE 4. Enter the reel number of the tape reel to confirm that the unlabeled tape reel you mounted is the one you intended to mount: n HMPOE1 5. Messages appear indicating that the installation has started. The INSIOE FIN message indicates that the runstream has finished. 13–10 Version 009B (Web Only) 7850 5104–009
Section 14 Verifying the Interconnects and Achieving Hardware RFU Following installation of OS 2200 software from fast-load tape HMP-OE1, you must verify that the OS 2200 nodes and each Intel node can communicate via the internal interconnect (14.1). Table 14–1 lists procedures that require you to have information or installation media available at the time of installation. Obtain that information or media before beginning. With this checklist completed and all installation software media readily available, the procedures in this section take 3 hours. Table 14–1. Checklist for Verifying Interconnects and Achieving RFU √ Media or Information Required 14.1. Verifying Interconnect Communications Media needed: Applicable tape containing microcode and the PING test for verifying communications as follows: • Model IX4400 CEC500 tape (minimum level of 1R8 is required, except when the 2200 node is configured for resilient partitions, then a minimum level of 1R11 is required to execute the PING test for the second 2200 node) Host LAN Controller-2 (HLC-2) microcode on cartridge tape. Found in the HLC2-FMK package that comes with the HLC-2. • Model IX5000 Series or IX4800 server CC6000 tape or CC3000 tape. CC6000 supersedes CC3000 for all configurations at Plateau 2.0. At Plateau 2.0 a minimum CC6000 level of 2R1 is required. Below Plateau 2.0, a minimum CC3000 level of 1R1 is required, except when the 2200 node is configured for resilient partitions, then a minimum level of 1R2 is required to execute the PING test for the second 2200 node. Channel adapter microcode tape, called FDDI/ETHERNET CA-MCODE The Diagnostic Software Peripheral Equipment Routines (DSPER) also should be installed following installation of the CEC tape. continued 7850 5104–009 Version 009B (Web Only) 14–1
- Page 279 and 280: Installing and Configuring SPO Work
- Page 281 and 282: • RPC configuration • Server
- Page 283 and 284: Installing and Configuring SPO Work
- Page 285 and 286: Installing and Configuring SPO Work
- Page 287 and 288: • Installing the SPO Basic Editio
- Page 289 and 290: Installing and Configuring SPO Work
- Page 291 and 292: Installing and Configuring SPO Work
- Page 293 and 294: Installing and Configuring SPO Work
- Page 295 and 296: Installing and Configuring SPO Work
- Page 297 and 298: Installing and Configuring SPO Work
- Page 299 and 300: Installing and Configuring SPO Work
- Page 301 and 302: Installing and Configuring SPO Work
- Page 303 and 304: Installing and Configuring SPO Work
- Page 305 and 306: Installing and Configuring SPO Work
- Page 307 and 308: Section 12 Configuring Intel Nodes
- Page 309 and 310: Configuring Intel Nodes for Monitor
- Page 311 and 312: Configuring Intel Nodes for Monitor
- Page 313 and 314: Configuring Intel Nodes for Monitor
- Page 315 and 316: Configuring Intel Nodes for Monitor
- Page 317 and 318: Configuring Intel Nodes for Monitor
- Page 319 and 320: Configuring Intel Nodes for Monitor
- Page 321 and 322: Section 13 Installing the Basic OS
- Page 323 and 324: Installing the Basic OS 2200 IOE Yo
- Page 325 and 326: Installing the Basic OS 2200 IOE 5.
- Page 327 and 328: Installing the Basic OS 2200 IOE 2.
- Page 329: Installing the Basic OS 2200 IOE Yo
- Page 333 and 334: 14.2.1. Installing HLC-2 Microcode
- Page 335 and 336: Verifying the Interconnects and Ach
- Page 337 and 338: Verifying the Interconnects and Ach
- Page 339 and 340: Verifying the Interconnects and Ach
- Page 341 and 342: Verifying the Interconnects and Ach
- Page 343 and 344: Verifying the Interconnects and Ach
- Page 345 and 346: Verifying the Interconnects and Ach
- Page 347 and 348: Section 15 Installing the Remaining
- Page 349 and 350: 15.2.2. Setting Up the TIP Environm
- Page 351 and 352: APP 3 ROLLBACK INITIALIZATION START
- Page 353 and 354: INAP3 MAX PAGES Installing the Rema
- Page 355 and 356: Section 16 Customizing the Site Cus
- Page 357 and 358: Customizing the Site 1. Copy the ne
- Page 359 and 360: Customizing the Site 5. Verify your
- Page 361 and 362: Customizing the Site A dialogue box
- Page 363 and 364: Customizing the Site lan-address la
- Page 365 and 366: 14. Select the Changes menu bar ite
- Page 367 and 368: Customizing the Site b. Select CP_U
- Page 369 and 370: Customizing the Site l. Repeat thes
- Page 371 and 372: 16.6. Testing TCP/IP Communications
- Page 373 and 374: Customizing the Site ClearPath IX50
- Page 375 and 376: Section 17 Installing Optional OS 2
- Page 377 and 378: Appendix A Tables of Documentation,
- Page 379 and 380: Major Hardware or Software Changes
Installing the Basic OS 2200 IOE<br />
4. Enter the reel number of the tape reel to confirm that the unlabeled tape reel you<br />
mounted is the one you intended to mount:<br />
n HMPOE1<br />
5. Messages appear indicating that the installation has started. The INSIOE FIN message<br />
indicates that the runstream has finished.<br />
13–10 Version 009B (Web Only) 7850 5104–009