24.12.2012 Views

ClearPath IX Systems Installation and Configuration Guide

ClearPath IX Systems Installation and Configuration Guide

ClearPath IX Systems Installation and Configuration Guide

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Contents<br />

Section 12. Configuring Intel Nodes for Monitoring by SPO<br />

12.1. Starting the Single Point <strong>Configuration</strong> Routine ....... 12–1<br />

12.2. Creating a Custom SPO Basic Edition<br />

<strong>Configuration</strong> ......................................................... 12–2<br />

12.3. Configuring <strong>and</strong> Installing the URM Agent for the<br />

SPO Server <strong>and</strong> UnixWare Nodes ......................... 12–4<br />

12.4. Transferring the SPO Windows Agent ....................... 12–6<br />

12.5. Configuring Windows Intel Nodes for ControlIT ......... 12–7<br />

12.6. Exiting from the Single Point <strong>Configuration</strong> Routine . 12–8<br />

12.7. Starting Normal SPO Console Operations ................. 12–8<br />

12.8. Installing the SPO Windows Agent ............................. 12–11<br />

12.9. Running the Console Output Redirection Script ........ 12–12<br />

Section 13. Installing the Basic OS 2200 IOE<br />

13.1. Read-<strong>and</strong>-Reply Message Format ............................. 13–2<br />

13.2. Performing the Initial Boot ........................................ 13–3<br />

13.2.1. Initial Boot Steps If Boot Partition Is Not Activated ... 13–3<br />

13.2.2. Initial Boot Steps If Partition Is Up <strong>and</strong> Exec Is<br />

Running ........................................................... 13–4<br />

13.2.3. Completing the Boot Procedure ............................. 13–4<br />

13.3. Installing Products from Tape HMP-FLD ................... 13–6<br />

13.4. Establishing the Performance Level (<strong>IX</strong>6000,<br />

<strong>IX</strong>5000, <strong>and</strong> <strong>IX</strong>4800 Servers Only) ....................... 13–7<br />

13.5. Installing Products from Tape HMP-OE1 ................... 13–9<br />

Section 14. Verifying the Interconnects <strong>and</strong> Achieving<br />

Hardware RFU<br />

14.1. Verifying Interconnect Communications ................... 14–2<br />

14.2. Installing Microcode .................................................. 14–2<br />

14.2.1. Installing HLC-2 Microcode .................................... 14–3<br />

14.2.2. Installing Channel Adapter Microcode (CSIOP) ......... 14–4<br />

14.3. Installing the CC or CEC Tape ................................... 14–6<br />

x Version 009B (Web Only) 7850 5104–009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!