28.09.2021 Views

Mario Cardenas - Architecture Portfolio

Selection of projects developed during my studies at Tec de Monterrey

Selection of projects developed during my studies at Tec de Monterrey

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SITE ANALYSIS

CONCEPT

Located north of Pesqueria river in the extension of the main square, the new Escobedo’s

City Hall becomes a center of community gathering welcoming all types of

activities with the goal of being an anchor of social interaction.

With the objective to re-define a government building, the project seeks to incorporate

many practices that will increase its use and lifespan.

Being located in a main square surrounded by green areas, a river and cultural projects

the city hall opens itself up to be part of the experience of the pedestrian by giving

away its first level and leaving opening on its four sides to be crossed in any direction.

01

SITE ORIGINAL CONDITION.

SAN NICOLAS DE BARI CHURCH CITY HALL PESQUERIA RIVER

05

THE FIRST LEVEL OPENS UP TO GENERATE AN OPEN FLOOR AND ALLOW PEDESTRIAN TRANSIT

ACROSS THE BUILDING ON ANY DIRECTION.

SAN NICOLAS DE BARI CHURCH

02

PROPOSAL OF NEW URBAN LAYOUT AND INTERVENTION IN MAIN SQUARE TO IMPROVE

CONNECTIVITY WITH THE RIVER.

06

TO CREATE AN INTERNAL SPACE THAT WOULD SERVE AS HEART AND INNER COURTYARD,

A HOLE IS CUT OFF FROM THE VOLUME, THIS WILL ALSO CREATE A FEELING OF OPENNESS

TOWARDS THE SQUARE.

NEW PEDESTRIAN BRIDGE TO CONNECT THE NEW AND OLD SQUARE

EXTENTION OF MAIN SQUARE

INNER COURTYARD

The project is made up by four blocks carefully seated on top of a platform (that seeks

to subtly separate the project from its immediate context without blocking the entrances

so that once “inside” you can feel when you are in the city hall or in the public square),

and auditorium that crowns the project on its north side, a monumental portico and a

cover that lets light to permeate in multiple ways and a central vacuum that allows all

faces of the project to interact from within.

Concepts such as openness, permeability, flexibility and accessibility where key during

the design process. The project seeks to emphasize the importance of the river, main

square and linear park by acknowledging their presence and functioning according to

them.

The program consist of a multi-purpose ground floor, offices for rent, and auditorium,

areas for government procedures and administration department, and an archive.

03

04

VOLUME SITING PRIORITIZING CONNECTIVITY WITH THE LINEAR PARK AND RIVER.

CITY HALL VOLUME

LINEAR PARK

A PLATFORM IS USED TO EMPHASIZE THE HIERARCHY OF THE PROJECT.

CITY HALL VOLUME

LINEAR PARK

07

08

VOLUME IS DIVIDED BASED ON ITS USE -PRIVATE, SEMI PUBLIC AND PUBLIC- TO IMPROVE

ITS OPERATION.

PRIVATE

SEMI PUBLIC

PUBLIC

TO CREATE A VISUAL FINISH THE AUDITORIUM IS LOCATED ON THE LINEAR PARK SIDE TO SERVE

AS A CONNECTION BETWEEN THE INTERIOR AND EXTERIOR WITH ITS TRANSPARENCY.

AUDITORIUM

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!