solidworks
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SOLIDWORKS Manage
• Provides access to configured dashboards only.
• Can display dashboards in full-screen mode.
• Can refresh at regular intervals.
• Always keeps available data up-to-date.
• Requires a login credential.
• Requires at least one Viewer license.
Editing the Project Task Subject
You can edit the subject of multiple project tasks to provide additional information.
You can add project-specific information, such as a project number, to the subject line
to help users search and view the tasks related to a project. This information can appear
before or after the original text.
To edit the project task subject:
1. Open a project record.
2. Optional: Go to the Planning tab and select the Tasks tab.
3. Go to the Tasks tab, if enabled.
4. Select and right-click a task or group of tasks to update.
5. Click Subject.
6. In the dialog box, select one or more options.
The following table describes the options available in the dialog box.
Area
Add/Remove
Description
Add amends the subject text.
Remove removes previously added text.
Position
Before places the text before the existing text.
After places the text after the existing text.
Text
Part Number adds a part number.
Text adds text to the subject.
7. Click Apply.
• Subject labels indicate the position of the original text.
• The position of the labels does not change if you change your selection in the Position
area.
112