07.06.2021 Views

IATA Aircraft Lease Guidance

Guidance Material for aircraft leasing

Guidance Material for aircraft leasing

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Annex VII: Aircraft Maintenance Program Guidelines

2. Regulatory Basis

In general, the AMP is a prerequisite for an Air Carrier approval. The following two paragraphs provide a brief

overview of EASA and FAA requirements with regards to the AMP.

2.1 EASA

The EASA requirement for an AMP is laid out in EASA Part-M, Subpart C M.A.302. The AMP must establish

compliance with:

Instructions issued by the competent authority (i.e. the local aviation authority)

Instructions for continuing airworthiness issued by the holders of the type certificate, restricted type

certificate, supplemental type certificate, or major repair design approval

Additional or alternative instructions proposed by the operator or the continuing airworthiness

management organization. This specific requirement does not apply to intervals of safety related tasks,

which may be escalated subject to sufficient reviews carried out, and only when subject to direct

approval by the local aviation authority.

The complete AMP and its subsequent issues are to be approved by the NAA.

2.2 FAA

The FAA considers the AMP to be more than just a document listing maintenance tasks, and therefore differs

from EASA’s philosophy. The requirements for AMPs are explained in FAA AC 120-16F. The AMP must ensure

that three specific objectives are achieved in order to provide the highest possible level of safety in air

transportation:

Each aircraft that is released to service must be airworthy and properly maintained for operations in air

transportation

All of the maintenance and alterations performed on the aircraft must be in accordance with the

maintenance manuals

Competent personnel and adequate facilities and equipment must be used to perform maintenance and

alterations on the aircraft

The elements of the AMP are as follows:

Airworthiness responsibility

Air carrier maintenance manual

Air carrier maintenance organization

Accomplishment and approval of maintenance and alterations

Maintenance schedule

Required Inspection Items (RII)

Maintenance record keeping system

4 th Edition 2017 103

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!