23.12.2012 Views

Flight 207: Ariane 5 ECA/Echostar-17 - Astrium - EADS

Flight 207: Ariane 5 ECA/Echostar-17 - Astrium - EADS

Flight 207: Ariane 5 ECA/Echostar-17 - Astrium - EADS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Data relating to <strong>Flight</strong> <strong>207</strong><br />

time /H0<br />

(s)<br />

time/H0<br />

(mn)<br />

event<br />

altitude<br />

- - - - “Ballistic” phase - - -<br />

1503 25 ’ 03 ’’ Phase 3 Start of ECHOSTAR XVII orientation 656<br />

1614 26 ’ 54 ’’ Phase 4 Start of ECHOSTAR XVII slow transverse spin-up 927<br />

1655 27 ’ 35 ’’ ECHOSTAR XVII separation (H4.1) 1040<br />

1665 27 ’ 45 ’’ Phases 6 Upper composite despin 1068<br />

1670 27 ’ 50 ’’ Phases 7 to 9 SYLDA staging to orientation phases 1084<br />

1877 31 ’ <strong>17</strong> ’’ SYLDA separation (H4.2) <strong>17</strong>59<br />

1887 31 ’ 27 ’’ Phase 11 Start of MSG-3 orientation <strong>17</strong>95<br />

1962 32 ’ 42 ’’ Phase 12 Start of MSG-3 spin-up <strong>207</strong>1<br />

2051 34 ’ 11 ’’ MSG-3 separation (H4.3) 2411<br />

2061 34 ‘ 21 ’’ Phase 14 Upper composite despin 2450<br />

2116 35 ’ 16 ’’ Phase 15 Orientation to staging phases 2666<br />

2<strong>17</strong>8 36 ’ 18’’ Phases 16 to 19 ESC-A staging phases 29<strong>17</strong><br />

2486 41 ’ 26 ’’ Phase 20 ESC-A orientation for the final spin-up 4209<br />

2566 42 ’ 16 ’’ Phase 21 Start of spin-up at 45°/s 4551<br />

2667 44 ’ 27 ’’ Oxygen tank passivation (breakdown S34) 4983<br />

2942 49 ’ 02 ’’ ESC-A passivation (breakdown S37) 6154<br />

Note: This provisional flight sequence is coherent with the stage propulsion laws available at<br />

the time of drafting this document.<br />

(km)<br />

35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!