Data relating to <strong>Flight</strong> <strong>207</strong><br />

Synchronised sequence<br />

These operations are controlled exclusively and automatically by the ELA3 operational<br />

checkout-command (CCO) computer. During this sequence, all the elements involved in the<br />

launch are synchronised by the “countdown time” distributed by the CSG.<br />

During the initial phase (up to H0 - 6s), the launcher is gradually switched to its flight<br />

configuration by the CCO computer. If the synchronised sequence is placed on hold, the<br />

launcher is returned automatically to its configuration at H0 - 7 min.<br />

In the second irreversible phase of the sequence (H0 - 6 s to H0 - 3.2 s), the synchronised<br />

sequence is no longer dependent on CSG countdown time, and operates on an internal clock.<br />

The final phase is the launcher ignition phase. The ignition sequence is controlled directly by<br />

the on-board computer (OBC). The ground systems execute a number of actions in parallel with<br />

the OB ignition sequence.<br />