23.12.2012 Views

Flight 207: Ariane 5 ECA/Echostar-17 - Astrium - EADS

Flight 207: Ariane 5 ECA/Echostar-17 - Astrium - EADS

Flight 207: Ariane 5 ECA/Echostar-17 - Astrium - EADS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Data relating to <strong>Flight</strong> <strong>207</strong><br />

The purpose of the following ballistic phase is to ensure:<br />

• Pointing of the upper composite in the direction required by ECHOSTAR XVII and<br />

MSG-3 and then in that required for SYLDA 5,<br />

• Composite slow transverse spin-up before separation ECHOSTAR XVII<br />

• Triple-axis stabilisation before separation of SYLDA 5,<br />

• Composite slow spin-up at 30.7°/s before separation of MSG-3,<br />

• Separation of ECHOSTAR XVII, SYLDA 5 and MSG-3,<br />

• Final spin-up of the composite at 45°/s,<br />

• Passivation of the ESC-A stage pressurised LOX tank and LH2 tank, preceded by a prepassivation<br />

phase involving simultaneous opening of the eight SCAR nozzles. These<br />

operations contribute to short- and medium-term management of the mutual distancing<br />

of objects in orbit.<br />

The ballistic phase for the mission comprises 23 elementary phases described hereafter. These<br />

include separation of ECHOSTAR XVII (phase 5), SYLDA 5 separation (phase 10), and MSG-3<br />

separation (phase 13).<br />

13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!