Flight 207: Ariane 5 ECA/Echostar-17 - Astrium - EADS
Flight 207: Ariane 5 ECA/Echostar-17 - Astrium - EADS
Flight 207: Ariane 5 ECA/Echostar-17 - Astrium - EADS
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Data relating to <strong>Flight</strong> <strong>207</strong><br />
The purpose of the following ballistic phase is to ensure:<br />
• Pointing of the upper composite in the direction required by ECHOSTAR XVII and<br />
MSG-3 and then in that required for SYLDA 5,<br />
• Composite slow transverse spin-up before separation ECHOSTAR XVII<br />
• Triple-axis stabilisation before separation of SYLDA 5,<br />
• Composite slow spin-up at 30.7°/s before separation of MSG-3,<br />
• Separation of ECHOSTAR XVII, SYLDA 5 and MSG-3,<br />
• Final spin-up of the composite at 45°/s,<br />
• Passivation of the ESC-A stage pressurised LOX tank and LH2 tank, preceded by a prepassivation<br />
phase involving simultaneous opening of the eight SCAR nozzles. These<br />
operations contribute to short- and medium-term management of the mutual distancing<br />
of objects in orbit.<br />
The ballistic phase for the mission comprises 23 elementary phases described hereafter. These<br />
include separation of ECHOSTAR XVII (phase 5), SYLDA 5 separation (phase 10), and MSG-3<br />
separation (phase 13).<br />
13