<strong>Safety</strong> Life Cycle Model<br />
Hazard and Risk Analysis 9<br />
The necessary steps <strong>for</strong> designing an SIS from conception through decommissioning are<br />
described in the safety life cycle.<br />
Be<strong>for</strong>e the safety life cycle model is implemented, the following requirements should be met:<br />
• Complete a hazard and operability study<br />
• Determine the SIS requirement<br />
• Determine the target SIL capability<br />
EXIT<br />
No<br />
START<br />
Design<br />
conceptual process<br />
Per<strong>for</strong>m process<br />
hazard analysis<br />
and risk<br />
assessment<br />
Apply non-SIS<br />
protection layers to<br />
prevent identified<br />
hazards or reduce<br />
risk<br />
SIS<br />
required?<br />
Yes<br />
Define target SIL capability<br />
Figure 5 <strong>Safety</strong> Life Cycle Model<br />
Develop safety<br />
requirements<br />
document<br />
(Step 1)<br />
Per<strong>for</strong>m SIS<br />
conceptual<br />
design and verify<br />
it meets the SRS<br />
(Step 2)<br />
Per<strong>for</strong>m SIS<br />
detail design<br />
(Step 3)<br />
SIS installation,<br />
commissioning,<br />
and pre-startup<br />
acceptance test<br />
(Step 4)<br />
Conceptual process design<br />
Modify<br />
Establish operation<br />
and maintenance<br />
procedure<br />
(Step 5)<br />
Pre-start-up<br />
safety review<br />
assessment<br />
(Step 6)<br />
SIS start-up<br />
operation,<br />
maintenance,<br />
periodic functional<br />
testing<br />
(Steps 7 and 8)<br />
Modify or<br />
decommission<br />
SIS?<br />
Decommission<br />
SIS<br />
decommissioning<br />
(Step 9)<br />
<strong>Safety</strong> <strong>Considerations</strong> <strong>Guide</strong> <strong>for</strong> <strong>Trident</strong> <strong>v2</strong> <strong>Systems</strong>