23.12.2012 Views

Safety Considerations Guide for Trident v2 Systems - TUV ...

Safety Considerations Guide for Trident v2 Systems - TUV ...

Safety Considerations Guide for Trident v2 Systems - TUV ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8 Chapter 1 <strong>Safety</strong> Concepts<br />

This table provides simplified equations <strong>for</strong> calculating the PFDavg <strong>for</strong> the key elements in an<br />

SIS. Once the PFDavg <strong>for</strong> each element is known, an SIL can be determined.<br />

Table 1 Simplified Equations <strong>for</strong> Calculating PFDavg<br />

Description Equation<br />

Sensors To calculate<br />

PFDavg <strong>for</strong><br />

sensors (2oo3)<br />

Block<br />

Valves<br />

To calculate<br />

PFDavg <strong>for</strong><br />

block valves<br />

(1oo2) in series<br />

(final elements)<br />

SIF To calculate<br />

PFDavg <strong>for</strong> a<br />

safety<br />

instrumented<br />

function<br />

Note Equations are approximate<br />

To determine the SIL, compare the calculated PFDavg to the figure on page 5. In this example,<br />

the system is acceptable as an SIS <strong>for</strong> use in SIL3 applications.<br />

For additional in<strong>for</strong>mation on SIL assignment and SIL verification, visit the Premier Consulting<br />

Services web site at www.premier-fs.com.<br />

<strong>Safety</strong> <strong>Considerations</strong> <strong>Guide</strong> <strong>for</strong> <strong>Trident</strong> <strong>v2</strong> <strong>Systems</strong><br />

PFDavg = (λDU*TI) 2<br />

+ 1/2*β*λDU*TI<br />

PFDavg = 1 /3(λDU*TI) 2<br />

+ 1/2*β*λDU*TI<br />

SIF PFDavg =<br />

Sensors PFDavg +<br />

Block Valves PFDavg +<br />

Controller PFDavg<br />

Table 2 Determining the SIL Using the Equations<br />

Variables<br />

(Supplied by the Manufacturer)<br />

λ = failure rate<br />

DU=dangerous, undetected failure rate<br />

TI= test interval in hours<br />

β = common cause factor<br />

λ = failure rate<br />

DU=dangerous, undetected failure rate<br />

TI= test interval in hours<br />

β = common cause factor<br />

β λDU TI PFD Result<br />

Pressure Transmitters (2oo3) .03 2.0E-06 4380 2.1E-04<br />

Temperature Transmitters (2oo3) .03 2.6E-06 4380 3.0E-04<br />

Total <strong>for</strong> Sensors 5.1E-04<br />

Block Valves (1oo2) .02 2.2E-06 4380 1.3E-04<br />

Total <strong>for</strong> Block Valves 1.3E-04<br />

<strong>Trident</strong> Controller 4380 1.0E-05 0.1E-04<br />

PFDavg <strong>for</strong> SIF 6.5E-04

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!