Heat Recovery Steam Generator, Ducting, <strong>and</strong> Stack<br />
Re-powering Study for the Northport <strong>and</strong> Port Jefferson Power Stations<br />
<strong>Appendix</strong> IV Northport <strong>Plan</strong>t Equipment List<br />
Equipment<br />
No.<br />
Description Type<br />
1 Stack Concrete Dual Flue Chimney<br />
2 Heat Recovery Drum, multi-pressure with economizer section <strong>and</strong> integral<br />
Steam<br />
Generator<br />
deaerator<br />
3 SCR Reactor Space for spare layer<br />
4 SCR Catalyst<br />
5 CO Catalyst<br />
6 Dilution Air<br />
Blowers<br />
Centrifugal<br />
7 Ammonia Feed<br />
Pump<br />
Centrifugal<br />
8 Ammonia<br />
Storage Tank<br />
20,000 gallon pressurized shop fabricated tank<br />
Accessory Electric <strong>Plan</strong>t<br />
Equipment<br />
No.<br />
Description Type<br />
1 CTG<br />
Transformers<br />
2-Oil-filled 290 MVA 18kV/345 kV<br />
2 STG<br />
Transformer<br />
1-Oil-filled 300 MVA 22 kV/345 kV<br />
3 Auxiliary<br />
Transformers<br />
2-Oil-filled 10 MVA 18 kV/4.16 kV<br />
4 Generator<br />
Breaker<br />
2, one for each CT<br />
5 High Side GIS<br />
Breaker<br />
3, one for each CTG <strong>and</strong> one for the STG<br />
6 Low Voltage<br />
Transformer<br />
Dry ventilated 4.16 kV/480V<br />
7 CTG Isolated<br />
Phase Bus<br />
Ducts <strong>and</strong> Tap<br />
Bus<br />
Aluminum, self-cooled 18 kV<br />
8 Medium<br />
Voltage<br />
Switchgear<br />
Metal clad<br />
9 Low Voltage<br />
Switchgear<br />
Metal enclosed<br />