Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...
Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...
Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
N<br />
8<br />
VAPOR<br />
BALANCE<br />
CONNECTION<br />
FLOOR<br />
A<br />
PID-08-08D<br />
FUEL GAS SUPPLY<br />
1203 PID-12-01A<br />
INSTRUMENT AIR<br />
SUPPLY<br />
CO2<br />
SKID<br />
REF. 7<br />
N<br />
7<br />
FILL<br />
CONNECTION<br />
REVISION DESCRIPTION<br />
N<br />
5<br />
N<br />
6<br />
N<br />
3<br />
N<br />
4<br />
N<br />
1<br />
N<br />
2<br />
IE<br />
57A<br />
PM<br />
3-1<br />
IE 57A<br />
ALT<br />
IE 57A<br />
ALT<br />
PM<br />
3-2<br />
IE<br />
57B<br />
PUMP OUT<br />
CONNECTION<br />
GTA-V004<br />
1"<br />
WW<br />
24<br />
GTA-TK001<br />
FP<br />
26<br />
WASH WATER DRAIN TANK<br />
4,000 GALLONS<br />
151X1<br />
GTA-V005<br />
B<br />
APPR<br />
EXHAUST<br />
FP<br />
25<br />
4"-GTA-048-NONE-P<br />
GTA-V003<br />
PM<br />
11<br />
IE<br />
60<br />
CHECKED<br />
CORRECT<br />
DATE<br />
IE<br />
62<br />
PM<br />
10<br />
WW<br />
16<br />
EXHAUST<br />
DUCT<br />
PRESSURE<br />
SWITCH<br />
CCW<br />
RETURN<br />
PID-09-09C<br />
CW<br />
53<br />
CW<br />
52<br />
PACKAGE<br />
IE<br />
PM<br />
09<br />
REF 12<br />
63<br />
GE<br />
GTA-V006<br />
GTA<br />
LG<br />
0000<br />
GTA-V007<br />
TO VENT<br />
GTA<br />
CCW<br />
SUPPLY<br />
PID-09-09C<br />
LOCAL<br />
WW<br />
15<br />
PM<br />
08<br />
ALARM PANEL<br />
GTA<br />
LS<br />
0000<br />
REVISION DESCRIPTION<br />
C<br />
CA<br />
52<br />
PERFORMANCE<br />
GTA-V008<br />
MONITORING<br />
LT<br />
0103<br />
PACKAGE<br />
WW<br />
10<br />
REF 12<br />
CONDENSATE<br />
FLOOR<br />
DRAIN<br />
PM<br />
06<br />
UNDERGROUND<br />
APPR<br />
D<br />
CHECKED<br />
CORRECT<br />
WW<br />
30<br />
DATE<br />
ROOF<br />
WW<br />
110<br />
PM<br />
05<br />
PM<br />
04<br />
CCW<br />
SUPPLY<br />
PID-09-09C<br />
CCW<br />
RETURN<br />
PID-09-09C<br />
CA<br />
52<br />
ROOF<br />
ROOF<br />
COMBUSTION TURBINE<br />
CA<br />
51<br />
UNDERGROUND<br />
REVISION DESCRIPTION<br />
E<br />
GE<br />
GE<br />
TO VENT<br />
TO VENT<br />
LO<br />
13F<br />
CW<br />
7<br />
CW<br />
6<br />
LO<br />
13E<br />
FP<br />
31<br />
FP<br />
32<br />
LO<br />
3B<br />
FG<br />
2<br />
FG<br />
1<br />
LO<br />
13D<br />
FG<br />
3<br />
FG<br />
7<br />
FP<br />
10<br />
FP<br />
11<br />
ACCESSORY<br />
MODULE<br />
LO<br />
13A<br />
LO<br />
1<br />
LO<br />
13B<br />
LO<br />
3A<br />
LO<br />
19<br />
LO<br />
13C<br />
LO<br />
2<br />
WW<br />
33<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
F<br />
GTA-V002<br />
CA<br />
16<br />
CA<br />
20<br />
LOW<br />
POINT<br />
DRAIN<br />
LO<br />
FILL<br />
CA<br />
5<br />
LO COOLER<br />
MAINTENANCE<br />
LO<br />
DRAIN<br />
DRAIN<br />
ROOF<br />
REF 12<br />
VM-15-1<br />
10"<br />
CA<br />
53<br />
CA<br />
53<br />
INLET AIR HEATING<br />
ISOLATION VALVE<br />
REVISION DESCRIPTION<br />
G<br />
PT<br />
PM<br />
2<br />
PM<br />
1<br />
REF 12<br />
IE<br />
4<br />
96BH-1 96BH-2<br />
REF 12<br />
VA20-1<br />
INLET AIR HEATING<br />
CONTROL VALVE<br />
AP4<br />
IE<br />
97<br />
IE<br />
92C<br />
WW<br />
13<br />
AIR PROCESSING UNIT<br />
AP1<br />
APPR<br />
PT<br />
CHECKED<br />
CORRECT<br />
IE<br />
97<br />
REF 12<br />
DATE<br />
H<br />
AP3<br />
IE<br />
92D<br />
AP2<br />
WW<br />
12<br />
WTD-V022<br />
IE<br />
20<br />
INLET<br />
REF. 8<br />
WW<br />
1<br />
96AC - 40A,B,C,D<br />
REF. 12<br />
IE<br />
92A<br />
WW<br />
112<br />
IE<br />
92B<br />
TO SPRITS DUCT<br />
DRAIN SKID A217<br />
REVISION DESCRIPTION<br />
WASH WATER<br />
DETERGENT FLUSH<br />
TO DRAIN TANK<br />
UNDERGROUND<br />
WW<br />
111<br />
IE<br />
2<br />
I<br />
IE<br />
94-1<br />
TO SPRITS DUCT<br />
DRAIN SKID A-217<br />
LOAD<br />
COMPARTMENT<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
CW<br />
12<br />
8"<br />
CCW<br />
SUPPLY<br />
PID-09-09C<br />
IE<br />
91B<br />
IE<br />
91A<br />
IE<br />
91D<br />
IE<br />
91C<br />
IE<br />
93<br />
IE<br />
93A<br />
J<br />
CW<br />
13<br />
8"<br />
CCW<br />
RETURN<br />
PID-09-09C<br />
FOGGER<br />
SKID<br />
SEAL OIL<br />
LOOP SEAL<br />
IE<br />
110<br />
IE<br />
90<br />
LE11<br />
(OBD-2)<br />
CW12<br />
(AH)<br />
ROOF<br />
CW13<br />
(AH)<br />
LE4<br />
(GAV)<br />
GENERATOR<br />
COMPARTMENT<br />
REVISION DESCRIPTION<br />
2"<br />
ROOF<br />
BEARING DRAIN<br />
ENLARGEMENT VENT<br />
GAS<br />
SCAVENGE<br />
LE5<br />
(GAV)<br />
WW20<br />
UNDERGROUND<br />
K L<br />
UNDERGROUND<br />
LE<br />
3<br />
CO2<br />
FEED<br />
LE12<br />
(WRD)<br />
LE<br />
2<br />
H2<br />
FEED<br />
(SEE PID-14-09A)<br />
DETERGENT INLET<br />
WW21<br />
WATER WASH SKID<br />
REF. 10<br />
WW29<br />
WW19<br />
WW23 WW22<br />
APPR<br />
CHECKED<br />
CORRECT<br />
PID-12-01A<br />
INSTRUMENT AIR<br />
DATE<br />
1204<br />
PID-09-21A<br />
0930<br />
FROM DEMINERALIZED<br />
WATER SYSTEM<br />
NOTES:<br />
1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS,<br />
SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A.<br />
2. TYPICAL FOR EACH CTG.<br />
M<br />
CTG AUXILIARIES & SERVICES<br />
SYSTEM<br />
131134-PID-39-02A-A<br />
NORTHPORT OPTION 9<br />
DESIGNED BY<br />
DSGN CHK’D BY<br />
DRAWING NO.<br />
TM<br />
PIPING & INSTRUMENT<br />
FUNDAMENTAL DIAGRAM<br />
nationalgrid<br />
DRAWN BY<br />
CHK’D BY<br />
CAD MODEL<br />
N<br />
LEVELS<br />
WORK PKG<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
PCT