Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...
Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ... Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...
1 2 3 4 5 6 7 8 9 10 A REVISION DESCRIPTION ANTISCALANT FEED ALTERNATIVE DEMIN SUPPLY PERMEATE FROM SECOND PASS RO CHEMICAL TOTE FILLING B CITY WATER APPR CHECKED CORRECT DATE TO POTABLE WATER SYSTEM REVISION DESCRIPTION C APPR D CHECKED CORRECT DATE RO PRETREATMENT (ULTRA FILTRATION) (BY VENDOR) RO FEED PUMP ELECTRO-DEIONIZATION SKID D (EDI) REVISION DESCRIPTION E (BY VENDOR) LT PI PT RO ANTISCALANT SOLUTION TANK APPR LT CHECKED CORRECT DATE F FIRST PASS RO PRESSURE VESSEL REVISION DESCRIPTION G RO FEED PUMP CONTAINMENT AREA APPR CHECKED CORRECT DATE H PI PT REVISION DESCRIPTION I SECOND PASS RO PRESSURE VESSEL APPR CHECKED CORRECT DATE J (BY VENDOR) (BY WATER TREATMENT VENDOR) REVISION DESCRIPTION PI K L APPR CHECKED CORRECT DATE RO PERMEATE TO EDI SKID NOTES: RO CONCENTRATE TO WASTE CYCLE MAKE-UP / DEMIN STORAGE TANK 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, FIRST PASS RO FEEDWATER M SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04. DEMINERALIZED WATER SYSTEM SHEET 1 of 2 131134-PID-09-21A-C NORTHPORT OPTION 9 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT
1 2 3 4 5 6 7 8 9 10 A EXISTING REVISION DESCRIPTION CONDENSATE OVERFLOW DEMINERALIZER B APPR CHECKED CORRECT DATE DEMINERALIZED WATER STORAGE TANK REVISION DESCRIPTION C PS LI LT APPR D CHECKED CORRECT DATE REVISION DESCRIPTION E APPR CHECKED CORRECT DATE F REVISION DESCRIPTION G APPR CHECKED CORRECT DATE H DEMINERALIZED WATER PUMP 2A DEMINERALIZED WATER PUMP 2B DEMINERALIZED WATER PUMP 2C REVISION DESCRIPTION PI PI PI I APPR CHECKED CORRECT DATE J REVISION DESCRIPTION K L APPR CHECKED CORRECT DATE NOTES: CYCLE MAKE-UP TO CONDENSER DEMINERALIZER CROSS TIE TO UNIT 1 VACUUM PUMP 2A VACUUM PUMP 2B SAMPLE PANEL CYCLE CHEMICAL FEED SYSTEM 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, MAKE-UP TO CLOSED CYCLE COOLING WATER SYSTEM VACUUM BREAKER VALVE/ COND EJ WATER SEAL SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04. STATOR WINDING H COOLING UNIT 2 CONDENSATE PUMP 2A CONDENSATE PUMP 2B ST OIL PURIFIER CONDENSER FILL CT 3001/4001 WATER WASH SKID MAKE-UP TO CT CHILLER LOOP CTG FW NOX CONTROL WATER INJECTION M DEMINERALIZED WATER SYSTEM SHEET 2 of 2 131134-PID-09-21B-C NORTHPORT OPTION 9 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT
- Page 31 and 32: 1 2 3 4 5 6 7 8 9 10 A SUPERHEATER
- Page 33 and 34: 1 2 3 4 5 6 7 8 9 10 A 0304 PID-03-
- Page 35 and 36: 1 2 3 4 5 6 7 8 9 10 A 0341 PID-03-
- Page 37: 1 2 3 4 5 6 7 8 9 10 A 0368 PID-03-
- Page 40 and 41: 1 2 3 4 5 6 7 8 9 10 A 0831 PID-08-
- Page 42 and 43: 1 2 3 4 5 6 7 8 9 10 A 0427 PID-04-
- Page 44 and 45: 1 2 3 4 5 6 7 8 9 10 A FGS FGS FGS
- Page 46 and 47: 1 2 3 4 5 6 7 8 9 10 A 0823 PID-08-
- Page 50 and 51: 1 2 3 4 5 6 7 8 9 10 0904 PID-09-09
- Page 52 and 53: 1 2 3 4 5 6 7 8 9 10 A FROM AIR COM
- Page 54 and 55: 1 2 3 4 5 6 7 8 9 10 A REVISION DES
- Page 56 and 57: 1 2 3 4 5 6 7 8 9 10 A 1330 PID-13-
- Page 58 and 59: 1 2 3 4 5 6 7 8 9 10 A FROM HRSG 1A
- Page 60 and 61: 1 2 3 4 5 6 7 8 9 10 A 0304 PID-03-
- Page 62 and 63: 1 2 3 4 5 6 7 8 9 10 A 0341 PID-03-
- Page 64 and 65: 1 2 3 4 5 6 7 8 9 10 A 0368 PID-03-
- Page 66 and 67: 1 2 3 4 5 6 7 8 9 10 A REVISION DES
- Page 68 and 69: 1 2 3 4 5 6 7 8 9 10 A 0831 PID-08-
- Page 70 and 71: 1 2 3 4 5 6 7 8 9 10 A 0427 PID-04-
- Page 72 and 73: 1 2 3 4 5 6 7 8 9 10 A FGS FGS FGS
- Page 74 and 75: 1 2 3 4 5 6 7 8 9 10 A 0823 PID-08-
- Page 76 and 77: 1 2 3 4 5 6 7 8 9 10 CCW VSH 0132A
- Page 78 and 79: 1 2 3 4 5 6 7 8 9 10 0904 PID-09-09
- Page 80 and 81: 1 2 3 4 5 6 7 8 9 10 A FROM AIR COM
- Page 84 and 85: 1 2 3 4 5 6 7 8 9 10 A 1330 PID-13-
- Page 86 and 87: Re-powering Study for the Northport
- Page 88 and 89: Fuel Systems Re-powering Study for
- Page 90 and 91: Accessory Electric Plant Re-powerin
- Page 92 and 93: Fuel and Feed Re-powering Study for
- Page 94 and 95: Accessory Electric Plant Re-powerin
- Page 96 and 97: Re-powering Study for the Northport
- Page 98 and 99: Re-powering Study for the Northport
- Page 100 and 101: Re-powering Study for the Northport
- Page 102 and 103: Re-powering Study for the Northport
- Page 104 and 105: Re-powering Study for the Northport
- Page 106 and 107: Re-powering Study for the Northport
- Page 108 and 109: Re-powering Study for the Northport
- Page 110 and 111: • Grounding and lightning protect
- Page 112 and 113: Re-powering Study for the Northport
- Page 114 and 115: • Combustion turbine foundation
- Page 116 and 117: D3 Fuel Oil facilities Re-powering
- Page 118 and 119: Re-powering Study for the Northport
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
A<br />
EXISTING<br />
REVISION DESCRIPTION<br />
CONDENSATE OVERFLOW<br />
DEMINERALIZER<br />
B<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
DEMINERALIZED<br />
WATER<br />
STORAGE TANK<br />
REVISION DESCRIPTION<br />
C<br />
PS<br />
LI<br />
LT<br />
APPR<br />
D<br />
CHECKED<br />
CORRECT<br />
DATE<br />
REVISION DESCRIPTION<br />
E<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
F<br />
REVISION DESCRIPTION<br />
G<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
H<br />
DEMINERALIZED WATER<br />
PUMP 2A<br />
DEMINERALIZED WATER<br />
PUMP 2B<br />
DEMINERALIZED WATER<br />
PUMP 2C<br />
REVISION DESCRIPTION<br />
PI<br />
PI<br />
PI<br />
I<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
J<br />
REVISION DESCRIPTION<br />
K L<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
NOTES:<br />
CYCLE MAKE-UP<br />
TO CONDENSER<br />
DEMINERALIZER<br />
CROSS TIE TO UNIT 1<br />
VACUUM PUMP 2A<br />
VACUUM PUMP 2B<br />
SAMPLE PANEL<br />
CYCLE CHEMICAL<br />
FEED SYSTEM<br />
1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS,<br />
MAKE-UP TO CLOSED CYCLE<br />
COOLING WATER SYSTEM<br />
VACUUM BREAKER VALVE/<br />
COND EJ WATER SEAL<br />
SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04.<br />
STATOR WINDING<br />
H COOLING UNIT<br />
2<br />
CONDENSATE PUMP 2A<br />
CONDENSATE PUMP 2B<br />
ST OIL PURIFIER<br />
CONDENSER FILL<br />
CT 3001/4001<br />
WATER WASH SKID<br />
MAKE-UP TO CT<br />
CHILLER LOOP<br />
CTG FW NOX CONTROL WATER<br />
INJECTION<br />
M<br />
DEMINERALIZED WATER SYSTEM<br />
SHEET 2 of 2<br />
131134-PID-09-21B-C<br />
NORTHPORT OPTION 9<br />
DESIGNED BY<br />
DSGN CHK’D BY<br />
DRAWING NO.<br />
TM<br />
PIPING & INSTRUMENT<br />
FUNDAMENTAL DIAGRAM<br />
nationalgrid<br />
DRAWN BY<br />
CHK’D BY<br />
CAD MODEL<br />
N<br />
LEVELS<br />
WORK PKG<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
PCT