Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...

Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ... Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...

23.12.2012 Views

1 2 3 4 5 6 7 8 9 10 A REVISION DESCRIPTION ANTISCALANT FEED ALTERNATIVE DEMIN SUPPLY PERMEATE FROM SECOND PASS RO CHEMICAL TOTE FILLING B CITY WATER APPR CHECKED CORRECT DATE TO POTABLE WATER SYSTEM REVISION DESCRIPTION C APPR D CHECKED CORRECT DATE RO PRETREATMENT (ULTRA FILTRATION) (BY VENDOR) RO FEED PUMP ELECTRO-DEIONIZATION SKID D (EDI) REVISION DESCRIPTION E (BY VENDOR) LT PI PT RO ANTISCALANT SOLUTION TANK APPR LT CHECKED CORRECT DATE F FIRST PASS RO PRESSURE VESSEL REVISION DESCRIPTION G RO FEED PUMP CONTAINMENT AREA APPR CHECKED CORRECT DATE H PI PT REVISION DESCRIPTION I SECOND PASS RO PRESSURE VESSEL APPR CHECKED CORRECT DATE J (BY VENDOR) (BY WATER TREATMENT VENDOR) REVISION DESCRIPTION PI K L APPR CHECKED CORRECT DATE RO PERMEATE TO EDI SKID NOTES: RO CONCENTRATE TO WASTE CYCLE MAKE-UP / DEMIN STORAGE TANK 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, FIRST PASS RO FEEDWATER M SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04. DEMINERALIZED WATER SYSTEM SHEET 1 of 2 131134-PID-09-21A-C NORTHPORT OPTION 9 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT

1 2 3 4 5 6 7 8 9 10 A EXISTING REVISION DESCRIPTION CONDENSATE OVERFLOW DEMINERALIZER B APPR CHECKED CORRECT DATE DEMINERALIZED WATER STORAGE TANK REVISION DESCRIPTION C PS LI LT APPR D CHECKED CORRECT DATE REVISION DESCRIPTION E APPR CHECKED CORRECT DATE F REVISION DESCRIPTION G APPR CHECKED CORRECT DATE H DEMINERALIZED WATER PUMP 2A DEMINERALIZED WATER PUMP 2B DEMINERALIZED WATER PUMP 2C REVISION DESCRIPTION PI PI PI I APPR CHECKED CORRECT DATE J REVISION DESCRIPTION K L APPR CHECKED CORRECT DATE NOTES: CYCLE MAKE-UP TO CONDENSER DEMINERALIZER CROSS TIE TO UNIT 1 VACUUM PUMP 2A VACUUM PUMP 2B SAMPLE PANEL CYCLE CHEMICAL FEED SYSTEM 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, MAKE-UP TO CLOSED CYCLE COOLING WATER SYSTEM VACUUM BREAKER VALVE/ COND EJ WATER SEAL SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04. STATOR WINDING H COOLING UNIT 2 CONDENSATE PUMP 2A CONDENSATE PUMP 2B ST OIL PURIFIER CONDENSER FILL CT 3001/4001 WATER WASH SKID MAKE-UP TO CT CHILLER LOOP CTG FW NOX CONTROL WATER INJECTION M DEMINERALIZED WATER SYSTEM SHEET 2 of 2 131134-PID-09-21B-C NORTHPORT OPTION 9 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

A<br />

EXISTING<br />

REVISION DESCRIPTION<br />

CONDENSATE OVERFLOW<br />

DEMINERALIZER<br />

B<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

DEMINERALIZED<br />

WATER<br />

STORAGE TANK<br />

REVISION DESCRIPTION<br />

C<br />

PS<br />

LI<br />

LT<br />

APPR<br />

D<br />

CHECKED<br />

CORRECT<br />

DATE<br />

REVISION DESCRIPTION<br />

E<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

F<br />

REVISION DESCRIPTION<br />

G<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

H<br />

DEMINERALIZED WATER<br />

PUMP 2A<br />

DEMINERALIZED WATER<br />

PUMP 2B<br />

DEMINERALIZED WATER<br />

PUMP 2C<br />

REVISION DESCRIPTION<br />

PI<br />

PI<br />

PI<br />

I<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

J<br />

REVISION DESCRIPTION<br />

K L<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

NOTES:<br />

CYCLE MAKE-UP<br />

TO CONDENSER<br />

DEMINERALIZER<br />

CROSS TIE TO UNIT 1<br />

VACUUM PUMP 2A<br />

VACUUM PUMP 2B<br />

SAMPLE PANEL<br />

CYCLE CHEMICAL<br />

FEED SYSTEM<br />

1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS,<br />

MAKE-UP TO CLOSED CYCLE<br />

COOLING WATER SYSTEM<br />

VACUUM BREAKER VALVE/<br />

COND EJ WATER SEAL<br />

SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04.<br />

STATOR WINDING<br />

H COOLING UNIT<br />

2<br />

CONDENSATE PUMP 2A<br />

CONDENSATE PUMP 2B<br />

ST OIL PURIFIER<br />

CONDENSER FILL<br />

CT 3001/4001<br />

WATER WASH SKID<br />

MAKE-UP TO CT<br />

CHILLER LOOP<br />

CTG FW NOX CONTROL WATER<br />

INJECTION<br />

M<br />

DEMINERALIZED WATER SYSTEM<br />

SHEET 2 of 2<br />

131134-PID-09-21B-C<br />

NORTHPORT OPTION 9<br />

DESIGNED BY<br />

DSGN CHK’D BY<br />

DRAWING NO.<br />

TM<br />

PIPING & INSTRUMENT<br />

FUNDAMENTAL DIAGRAM<br />

nationalgrid<br />

DRAWN BY<br />

CHK’D BY<br />

CAD MODEL<br />

N<br />

LEVELS<br />

WORK PKG<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

PCT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!