23.12.2012 Views

Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...

Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...

Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

A<br />

REVISION DESCRIPTION<br />

ANTISCALANT FEED<br />

ALTERNATIVE<br />

DEMIN SUPPLY<br />

PERMEATE FROM<br />

SECOND PASS RO<br />

CHEMICAL TOTE<br />

FILLING<br />

B<br />

CITY WATER<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

TO POTABLE<br />

WATER SYSTEM<br />

REVISION DESCRIPTION<br />

C<br />

APPR<br />

D<br />

CHECKED<br />

CORRECT<br />

DATE<br />

RO PRETREATMENT<br />

(ULTRA FILTRATION)<br />

(BY VENDOR)<br />

RO FEED PUMP<br />

ELECTRO-DEIONIZATION SKID<br />

D<br />

(EDI)<br />

REVISION DESCRIPTION<br />

E<br />

(BY VENDOR)<br />

LT<br />

PI PT<br />

RO ANTISCALANT<br />

SOLUTION TANK<br />

APPR<br />

LT<br />

CHECKED<br />

CORRECT<br />

DATE<br />

F<br />

FIRST PASS<br />

RO PRESSURE<br />

VESSEL<br />

REVISION DESCRIPTION<br />

G<br />

RO FEED PUMP<br />

CONTAINMENT AREA<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

H<br />

PI PT<br />

REVISION DESCRIPTION<br />

I<br />

SECOND PASS<br />

RO PRESSURE<br />

VESSEL<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

J<br />

(BY VENDOR)<br />

(BY WATER TREATMENT VENDOR)<br />

REVISION DESCRIPTION<br />

PI<br />

K L<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

RO PERMEATE<br />

TO EDI SKID<br />

NOTES:<br />

RO CONCENTRATE<br />

TO WASTE<br />

CYCLE MAKE-UP /<br />

DEMIN STORAGE TANK<br />

1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS,<br />

FIRST PASS RO FEEDWATER<br />

M<br />

SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04.<br />

DEMINERALIZED WATER SYSTEM<br />

SHEET 1 of 2<br />

131134-PID-09-21A-C<br />

NORTHPORT OPTION 9<br />

DESIGNED BY<br />

DSGN CHK’D BY<br />

DRAWING NO.<br />

TM<br />

PIPING & INSTRUMENT<br />

FUNDAMENTAL DIAGRAM<br />

nationalgrid<br />

DRAWN BY<br />

CHK’D BY<br />

CAD MODEL<br />

N<br />

LEVELS<br />

WORK PKG<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

PCT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!