Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...

Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ... Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...

23.12.2012 Views

1 2 3 4 5 6 7 8 9 10 A FROM AIR COMPRESSOR/ DRYER SKID REVISION DESCRIPTION INSTRUMENT AIR SUPPLY FOR FEEDWATER PUMPHOUSE B APPR CHECKED CORRECT DATE INSTRUMENT AIR SUPPLY TO DEMIN. AREA IAS PT 0105-1 ELECTRONICS ROOM IAS IAS-V001 PT 0105-2 IAS IAS-V013 REVISION DESCRIPTION C IAS-V003 PT 0105-3 IAS-V001 IAS APPR D PI 0106 CHECKED CORRECT IAS-V002 DATE REVISION DESCRIPTION E IAS-V011 IAS-V006 APPR CHECKED CORRECT DATE F IAS-V004 IAS-V005 IAS-V010 REVISION DESCRIPTION G MACHINE SHOP MACHINE SHOP APPR CHECKED CORRECT DATE H LOOP AT HRSG DRUM LEVEL LOOP AT HRSG GROUND LEVEL LOOP AT STG REVISION DESCRIPTION I IAS-V012 APPR CHECKED CORRECT DATE J IAS-V009 IAS-V007 IAS-V008 REVISION DESCRIPTION K L APPR CHECKED CORRECT DATE 1202 LATER TO CEMS SHELTER 1203 PID-39-02A TO CTGS 1204 PID-39-02A TO CTG AIR INLET FOGGERS 1201 REF. 2 TO HIGH PRESSURE STEAM 1205 REF. 3 TO HOT REHEAT STEAM 1206 REF. 4 TO LOW PRESSURE STEAM 1207 PID-08-07B TO FUEL GAS COMPRESSOR SKIDS NOTES: BYPASS VALVE VOLUME TANKS BYPASS VALVE VOLUME TANKS BYPASS VALVE VOLUME TANKS M 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04. INSTRUMENT AIR SYSTEM 131134-PID-12-01A-E NORTHPORT OPTION 9 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT

1 2 3 4 5 6 7 8 9 10 A FROM AIR COMPRESSOR SKID REVISION DESCRIPTION B APPR CHECKED CORRECT DATE SAS PSV + 0101 REVISION DESCRIPTION C SAS-V010 SAS-V008 SAS PT 0102 SAS-V011 SAS-V009 D SAS-V018 SAS PI 0103 SAS-V001 SAS-V002 3/4 " 3/4 " APPR D CHECKED CORRECT DATE REVISION DESCRIPTION E SAS-V012 SAS-V007 SAS-V021 APPR CHECKED CORRECT F SAS-V020 SAS-V003 SAS-V004 DATE REVISION DESCRIPTION G APPR CHECKED CORRECT DATE D H SAS-V019 SAS-V014 SAS-V013 SAS-V005 REVISION DESCRIPTION SAS-V015 I SAS-V006 SAS-V022 APPR SAS-V018 D SAS-V016 CHECKED CORRECT DATE J SAS-V017 REVISION DESCRIPTION D K L APPR CHECKED CORRECT DATE NOTES: M 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A. SERVICE AIR SYSTEM 131134-PID-12-02A-E NORTHPORT OPTION 9 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

A<br />

FROM AIR COMPRESSOR SKID<br />

REVISION DESCRIPTION<br />

B<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

SAS<br />

PSV<br />

+<br />

0101<br />

REVISION DESCRIPTION<br />

C<br />

SAS-V010<br />

SAS-V008<br />

SAS<br />

PT<br />

0102<br />

SAS-V011<br />

SAS-V009<br />

D<br />

SAS-V018<br />

SAS<br />

PI<br />

0103<br />

SAS-V001 SAS-V002<br />

3/4 " 3/4 "<br />

APPR<br />

D<br />

CHECKED<br />

CORRECT<br />

DATE<br />

REVISION DESCRIPTION<br />

E<br />

SAS-V012<br />

SAS-V007<br />

SAS-V021<br />

APPR<br />

CHECKED<br />

CORRECT<br />

F<br />

SAS-V020<br />

SAS-V003 SAS-V004<br />

DATE<br />

REVISION DESCRIPTION<br />

G<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

D<br />

H<br />

SAS-V019<br />

SAS-V014<br />

SAS-V013<br />

SAS-V005<br />

REVISION DESCRIPTION<br />

SAS-V015<br />

I<br />

SAS-V006<br />

SAS-V022<br />

APPR<br />

SAS-V018<br />

D<br />

SAS-V016<br />

CHECKED<br />

CORRECT<br />

DATE<br />

J<br />

SAS-V017<br />

REVISION DESCRIPTION<br />

D<br />

K L<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

NOTES:<br />

M<br />

1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS,<br />

SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A.<br />

SERVICE AIR<br />

SYSTEM<br />

131134-PID-12-02A-E<br />

NORTHPORT OPTION 9<br />

DESIGNED BY<br />

DSGN CHK’D BY<br />

DRAWING NO.<br />

TM<br />

PIPING & INSTRUMENT<br />

FUNDAMENTAL DIAGRAM<br />

nationalgrid<br />

DRAWN BY<br />

CHK’D BY<br />

CAD MODEL<br />

N<br />

LEVELS<br />

WORK PKG<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

PCT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!