Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...
Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ... Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...
1 2 3 4 5 6 7 8 9 10 0904 PID-09-09B PID-09-09B A CCW SUPPLY HEADER 0905 CCW RETURN HEADER REVISION DESCRIPTION B APPR CHECKED CORRECT DATE CCW PP 0135 REVISION DESCRIPTION C CCW-V061B CCW-V060 PID-09-09D APPR D CCW CCW CCW CCW CCW RETURN FROM CHECKED CORRECT VJPC548IH7QD4 BFP DATE CCW-V065C CCW-V065D 0907 CCW TI 0145 TW 0145 TI 0150 TW 0150 PP 0151 CCW-V061A CCW-V064C CCW CCW-V064D CCW CCW FE + 0144 CCW CCW FE + 0149 FT 0144 FI 0149 FT 0149 REVISION DESCRIPTION E CCW CCW-V063C CCW CTG GEN H2 COOLERS PSV + 0143 PSV + 0148 CCW PP 0152 CTG LCI COOLER CCW CCW-V062A CCW PSV + 0153 PP 0136 CCW CCW-V062B CCW-V062C CCW-V063D CCW-V062D APPR CHECKED CORRECT DATE F CCW CCW PP 0142 PP 0147 CCW-V063A PSV + 0137 REVISION DESCRIPTION G CCW CCW FE + 0154 FT 0154 CCW-V063B CCW CCW-V064A CCW FE + 0138 APPR CHECKED CORRECT CCW CCW FT 0138 DATE TI 0155 TW 0155 H VJPC548IH7QD4 CCW-V065A CCW-V064B CCW CCW TI 0139 TW 0139 CCW-V065B REVISION DESCRIPTION CCW PP 0141 CTG FLAME DETECTORS PP 0146 CTG LO COOLER I CCW-V061C CCW CCW-V061D APPR CHECKED CORRECT DATE J REVISION DESCRIPTION CCW-V063E CCW-V064E CCW CCW FE + 0140 K L FT 0140 APPR CCW-V065E CHECKED CORRECT DATE 0906 PID-09-09D CCW SUPPLY TO BFP NOTES: 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A. 2. TYPICAL FOR EACH CTG. M COMPONENT COOLING WATER SYSTEM SHEET 3 OF 4 131134-PID-09-09C-D NORTHPORT OPTION 9 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT
1 2 3 4 5 6 7 8 9 10 A 0906 PID-09-09C CCW SUPPLY HEADER TO BFP 0911 PID-09-09A CCW SUPPLY FOR FUEL GAS COMPRESSOR REVISION DESCRIPTION B APPR CHECKED CORRECT DATE REVISION DESCRIPTION C BOILER FEED PUMP 1A APPR D CHECKED CORRECT DATE CCW ZSC 0164A CCW FUEL GAS COMPRESSOR LUBE OIL COOLER 1A CCW ZSC 0165A ZSO 0164A CCW CCW ZSO 0165A HV + 0164A REVISION DESCRIPTION E CCW FO HV + 0165A CCW-V072 FO CCW CCW APPR PP 0156 PP 0162 CHECKED CORRECT DATE F CCW-V072 CCW-V077 CCW CCW CCW TI 0163 TW 0163 CCW HV + 0165B REVISION DESCRIPTION G HV FUEL GAS COMPRESSOR + 0164B FO FO LUBE OIL COOLER 1B BOILER FEED PUMP 1B CCW CCW-V073 CCW ZSO 0165B APPR ZSO 0164B CCW CHECKED CORRECT CCW ZSC 0165B DATE ZSC 0164B H REVISION DESCRIPTION CCW CCW TI 0157 TW I 0157 APPR CHECKED CORRECT DATE J REVISION DESCRIPTION K L APPR CHECKED CORRECT DATE 0907 PID-09-09C CCW RETURN FROM BOILER FEED PUMPS 0912 PID-09-09A CCW RETURN TO POWERHOUSE NOTES: 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A 2. CCW SUPPLY TO BFP TYPICAL FOR ALL THREE SETS OF BOILER FEED PUMPS. M COMPONENT COOLING WATER SYSTEM SHEET 4 OF 4 131134-PID-09-09D-D NORTHPORT OPTION 9 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT
- Page 27 and 28: Re-powering Study for the Northport
- Page 29 and 30: Re-powering Study for the Northport
- Page 31 and 32: 1 2 3 4 5 6 7 8 9 10 A SUPERHEATER
- Page 33 and 34: 1 2 3 4 5 6 7 8 9 10 A 0304 PID-03-
- Page 35 and 36: 1 2 3 4 5 6 7 8 9 10 A 0341 PID-03-
- Page 37: 1 2 3 4 5 6 7 8 9 10 A 0368 PID-03-
- Page 40 and 41: 1 2 3 4 5 6 7 8 9 10 A 0831 PID-08-
- Page 42 and 43: 1 2 3 4 5 6 7 8 9 10 A 0427 PID-04-
- Page 44 and 45: 1 2 3 4 5 6 7 8 9 10 A FGS FGS FGS
- Page 46 and 47: 1 2 3 4 5 6 7 8 9 10 A 0823 PID-08-
- Page 50 and 51: 1 2 3 4 5 6 7 8 9 10 0904 PID-09-09
- Page 52 and 53: 1 2 3 4 5 6 7 8 9 10 A FROM AIR COM
- Page 54 and 55: 1 2 3 4 5 6 7 8 9 10 A REVISION DES
- Page 56 and 57: 1 2 3 4 5 6 7 8 9 10 A 1330 PID-13-
- Page 58 and 59: 1 2 3 4 5 6 7 8 9 10 A FROM HRSG 1A
- Page 60 and 61: 1 2 3 4 5 6 7 8 9 10 A 0304 PID-03-
- Page 62 and 63: 1 2 3 4 5 6 7 8 9 10 A 0341 PID-03-
- Page 64 and 65: 1 2 3 4 5 6 7 8 9 10 A 0368 PID-03-
- Page 66 and 67: 1 2 3 4 5 6 7 8 9 10 A REVISION DES
- Page 68 and 69: 1 2 3 4 5 6 7 8 9 10 A 0831 PID-08-
- Page 70 and 71: 1 2 3 4 5 6 7 8 9 10 A 0427 PID-04-
- Page 72 and 73: 1 2 3 4 5 6 7 8 9 10 A FGS FGS FGS
- Page 74 and 75: 1 2 3 4 5 6 7 8 9 10 A 0823 PID-08-
- Page 76 and 77: 1 2 3 4 5 6 7 8 9 10 CCW VSH 0132A
- Page 80 and 81: 1 2 3 4 5 6 7 8 9 10 A FROM AIR COM
- Page 82 and 83: 1 2 3 4 5 6 7 8 9 10 A REVISION DES
- Page 84 and 85: 1 2 3 4 5 6 7 8 9 10 A 1330 PID-13-
- Page 86 and 87: Re-powering Study for the Northport
- Page 88 and 89: Fuel Systems Re-powering Study for
- Page 90 and 91: Accessory Electric Plant Re-powerin
- Page 92 and 93: Fuel and Feed Re-powering Study for
- Page 94 and 95: Accessory Electric Plant Re-powerin
- Page 96 and 97: Re-powering Study for the Northport
- Page 98 and 99: Re-powering Study for the Northport
- Page 100 and 101: Re-powering Study for the Northport
- Page 102 and 103: Re-powering Study for the Northport
- Page 104 and 105: Re-powering Study for the Northport
- Page 106 and 107: Re-powering Study for the Northport
- Page 108 and 109: Re-powering Study for the Northport
- Page 110 and 111: • Grounding and lightning protect
- Page 112 and 113: Re-powering Study for the Northport
- Page 114 and 115: • Combustion turbine foundation
- Page 116 and 117: D3 Fuel Oil facilities Re-powering
- Page 118 and 119: Re-powering Study for the Northport
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
A<br />
0906 PID-09-09C<br />
CCW SUPPLY HEADER<br />
TO BFP<br />
0911 PID-09-09A<br />
CCW SUPPLY FOR<br />
FUEL GAS COMPRESSOR<br />
REVISION DESCRIPTION<br />
B<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
REVISION DESCRIPTION<br />
C<br />
BOILER FEED<br />
PUMP 1A<br />
APPR<br />
D<br />
CHECKED<br />
CORRECT<br />
DATE<br />
CCW<br />
ZSC<br />
0164A<br />
CCW<br />
FUEL GAS COMPRESSOR<br />
LUBE OIL COOLER 1A<br />
CCW<br />
ZSC<br />
0165A<br />
ZSO<br />
0164A<br />
CCW<br />
CCW<br />
ZSO<br />
0165A<br />
HV<br />
+<br />
0164A<br />
REVISION DESCRIPTION<br />
E<br />
CCW<br />
FO<br />
HV<br />
+<br />
0165A<br />
CCW-V072<br />
FO<br />
CCW<br />
CCW<br />
APPR<br />
PP<br />
0156<br />
PP<br />
0162<br />
CHECKED<br />
CORRECT<br />
DATE<br />
F<br />
CCW-V072<br />
CCW-V077<br />
CCW<br />
CCW<br />
CCW<br />
TI<br />
0163<br />
TW<br />
0163<br />
CCW<br />
HV<br />
+<br />
0165B<br />
REVISION DESCRIPTION<br />
G<br />
HV<br />
FUEL GAS COMPRESSOR<br />
+<br />
0164B<br />
FO<br />
FO<br />
LUBE OIL COOLER 1B<br />
BOILER FEED<br />
PUMP 1B<br />
CCW<br />
CCW-V073<br />
CCW<br />
ZSO<br />
0165B<br />
APPR<br />
ZSO<br />
0164B<br />
CCW<br />
CHECKED<br />
CORRECT<br />
CCW<br />
ZSC<br />
0165B<br />
DATE<br />
ZSC<br />
0164B<br />
H<br />
REVISION DESCRIPTION<br />
CCW<br />
CCW<br />
TI<br />
0157<br />
TW<br />
I<br />
0157<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
J<br />
REVISION DESCRIPTION<br />
K L<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
0907 PID-09-09C<br />
CCW RETURN FROM<br />
BOILER FEED PUMPS<br />
0912 PID-09-09A<br />
CCW RETURN TO<br />
POWERHOUSE<br />
NOTES:<br />
1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS,<br />
SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A<br />
2. CCW SUPPLY TO BFP TYPICAL FOR ALL THREE SETS OF<br />
BOILER FEED PUMPS.<br />
M<br />
COMPONENT COOLING WATER SYSTEM<br />
SHEET 4 OF 4<br />
131134-PID-09-09D-D<br />
NORTHPORT OPTION 9<br />
DESIGNED BY<br />
DSGN CHK’D BY<br />
DRAWING NO.<br />
TM<br />
PIPING & INSTRUMENT<br />
FUNDAMENTAL DIAGRAM<br />
nationalgrid<br />
DRAWN BY<br />
CHK’D BY<br />
CAD MODEL<br />
N<br />
LEVELS<br />
WORK PKG<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
PCT