Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...

Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ... Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...

23.12.2012 Views

1 2 3 4 5 6 7 8 9 10 0904 PID-09-09B PID-09-09B A CCW SUPPLY HEADER 0905 CCW RETURN HEADER REVISION DESCRIPTION B APPR CHECKED CORRECT DATE CCW PP 0135 REVISION DESCRIPTION C CCW-V061B CCW-V060 PID-09-09D APPR D CCW CCW CCW CCW CCW RETURN FROM CHECKED CORRECT VJPC548IH7QD4 BFP DATE CCW-V065C CCW-V065D 0907 CCW TI 0145 TW 0145 TI 0150 TW 0150 PP 0151 CCW-V061A CCW-V064C CCW CCW-V064D CCW CCW FE + 0144 CCW CCW FE + 0149 FT 0144 FI 0149 FT 0149 REVISION DESCRIPTION E CCW CCW-V063C CCW CTG GEN H2 COOLERS PSV + 0143 PSV + 0148 CCW PP 0152 CTG LCI COOLER CCW CCW-V062A CCW PSV + 0153 PP 0136 CCW CCW-V062B CCW-V062C CCW-V063D CCW-V062D APPR CHECKED CORRECT DATE F CCW CCW PP 0142 PP 0147 CCW-V063A PSV + 0137 REVISION DESCRIPTION G CCW CCW FE + 0154 FT 0154 CCW-V063B CCW CCW-V064A CCW FE + 0138 APPR CHECKED CORRECT CCW CCW FT 0138 DATE TI 0155 TW 0155 H VJPC548IH7QD4 CCW-V065A CCW-V064B CCW CCW TI 0139 TW 0139 CCW-V065B REVISION DESCRIPTION CCW PP 0141 CTG FLAME DETECTORS PP 0146 CTG LO COOLER I CCW-V061C CCW CCW-V061D APPR CHECKED CORRECT DATE J REVISION DESCRIPTION CCW-V063E CCW-V064E CCW CCW FE + 0140 K L FT 0140 APPR CCW-V065E CHECKED CORRECT DATE 0906 PID-09-09D CCW SUPPLY TO BFP NOTES: 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A. 2. TYPICAL FOR EACH CTG. M COMPONENT COOLING WATER SYSTEM SHEET 3 OF 4 131134-PID-09-09C-D NORTHPORT OPTION 9 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT

1 2 3 4 5 6 7 8 9 10 A 0906 PID-09-09C CCW SUPPLY HEADER TO BFP 0911 PID-09-09A CCW SUPPLY FOR FUEL GAS COMPRESSOR REVISION DESCRIPTION B APPR CHECKED CORRECT DATE REVISION DESCRIPTION C BOILER FEED PUMP 1A APPR D CHECKED CORRECT DATE CCW ZSC 0164A CCW FUEL GAS COMPRESSOR LUBE OIL COOLER 1A CCW ZSC 0165A ZSO 0164A CCW CCW ZSO 0165A HV + 0164A REVISION DESCRIPTION E CCW FO HV + 0165A CCW-V072 FO CCW CCW APPR PP 0156 PP 0162 CHECKED CORRECT DATE F CCW-V072 CCW-V077 CCW CCW CCW TI 0163 TW 0163 CCW HV + 0165B REVISION DESCRIPTION G HV FUEL GAS COMPRESSOR + 0164B FO FO LUBE OIL COOLER 1B BOILER FEED PUMP 1B CCW CCW-V073 CCW ZSO 0165B APPR ZSO 0164B CCW CHECKED CORRECT CCW ZSC 0165B DATE ZSC 0164B H REVISION DESCRIPTION CCW CCW TI 0157 TW I 0157 APPR CHECKED CORRECT DATE J REVISION DESCRIPTION K L APPR CHECKED CORRECT DATE 0907 PID-09-09C CCW RETURN FROM BOILER FEED PUMPS 0912 PID-09-09A CCW RETURN TO POWERHOUSE NOTES: 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A 2. CCW SUPPLY TO BFP TYPICAL FOR ALL THREE SETS OF BOILER FEED PUMPS. M COMPONENT COOLING WATER SYSTEM SHEET 4 OF 4 131134-PID-09-09D-D NORTHPORT OPTION 9 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

A<br />

0906 PID-09-09C<br />

CCW SUPPLY HEADER<br />

TO BFP<br />

0911 PID-09-09A<br />

CCW SUPPLY FOR<br />

FUEL GAS COMPRESSOR<br />

REVISION DESCRIPTION<br />

B<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

REVISION DESCRIPTION<br />

C<br />

BOILER FEED<br />

PUMP 1A<br />

APPR<br />

D<br />

CHECKED<br />

CORRECT<br />

DATE<br />

CCW<br />

ZSC<br />

0164A<br />

CCW<br />

FUEL GAS COMPRESSOR<br />

LUBE OIL COOLER 1A<br />

CCW<br />

ZSC<br />

0165A<br />

ZSO<br />

0164A<br />

CCW<br />

CCW<br />

ZSO<br />

0165A<br />

HV<br />

+<br />

0164A<br />

REVISION DESCRIPTION<br />

E<br />

CCW<br />

FO<br />

HV<br />

+<br />

0165A<br />

CCW-V072<br />

FO<br />

CCW<br />

CCW<br />

APPR<br />

PP<br />

0156<br />

PP<br />

0162<br />

CHECKED<br />

CORRECT<br />

DATE<br />

F<br />

CCW-V072<br />

CCW-V077<br />

CCW<br />

CCW<br />

CCW<br />

TI<br />

0163<br />

TW<br />

0163<br />

CCW<br />

HV<br />

+<br />

0165B<br />

REVISION DESCRIPTION<br />

G<br />

HV<br />

FUEL GAS COMPRESSOR<br />

+<br />

0164B<br />

FO<br />

FO<br />

LUBE OIL COOLER 1B<br />

BOILER FEED<br />

PUMP 1B<br />

CCW<br />

CCW-V073<br />

CCW<br />

ZSO<br />

0165B<br />

APPR<br />

ZSO<br />

0164B<br />

CCW<br />

CHECKED<br />

CORRECT<br />

CCW<br />

ZSC<br />

0165B<br />

DATE<br />

ZSC<br />

0164B<br />

H<br />

REVISION DESCRIPTION<br />

CCW<br />

CCW<br />

TI<br />

0157<br />

TW<br />

I<br />

0157<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

J<br />

REVISION DESCRIPTION<br />

K L<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

0907 PID-09-09C<br />

CCW RETURN FROM<br />

BOILER FEED PUMPS<br />

0912 PID-09-09A<br />

CCW RETURN TO<br />

POWERHOUSE<br />

NOTES:<br />

1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS,<br />

SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A<br />

2. CCW SUPPLY TO BFP TYPICAL FOR ALL THREE SETS OF<br />

BOILER FEED PUMPS.<br />

M<br />

COMPONENT COOLING WATER SYSTEM<br />

SHEET 4 OF 4<br />

131134-PID-09-09D-D<br />

NORTHPORT OPTION 9<br />

DESIGNED BY<br />

DSGN CHK’D BY<br />

DRAWING NO.<br />

TM<br />

PIPING & INSTRUMENT<br />

FUNDAMENTAL DIAGRAM<br />

nationalgrid<br />

DRAWN BY<br />

CHK’D BY<br />

CAD MODEL<br />

N<br />

LEVELS<br />

WORK PKG<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

PCT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!