Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...

Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ... Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...

23.12.2012 Views

1 2 3 4 5 6 7 8 9 10 A 0823 PID-08-07C FROM FUEL GAS HEATER 0820 PID-08-07C FROM HOT GAS SCRUBBER 0810 PID-08-07B CONDENSATE DRAIN FROM FUEL GAS COMPRESSORS 0821 PID-08-07C FROM HOT GAS SCRUBBER 0811 PID-08-07C DRAIN FROM FUEL GAS HEATER 0814 PID-08-07C REVISION DESCRIPTION DRAIN FROM FUEL GAS HEATER B APPR CHECKED CORRECT DATE FWS HV + 0000 FGS GSV + 0158 REVISION DESCRIPTION C FWS FC FWS ZSO 0000 FGS ZI 0000 FWS ZSO 0158 APPR ZSC 0000 D FGS CHECKED CORRECT FWS-V077 DATE ZSC 0158 FWS FWS FWS FWS LSL 0180 ZSC 0180 ZSO 0180 LSV + 0180 FWS-V078 FWS-V079 REVISION DESCRIPTION E ZSO 0157 ZSC 0157 FC GSV + 0157 APPR FGS CHECKED CORRECT DATE F FGS-V055 FGS FE FLOW CONDITIONER + 0142 POWERHOUSE FGS FT 0142 REVISION DESCRIPTION G FGS-V056 FWS-V093 FGS FGS-TK001 DRAIN TANK APPR CHECKED CORRECT TE 0144 FGS-FA001 FGS-V052 DATE H FGS FGS-V053 FGS FGS-V054 LIT 0180 FWS-V090 LG 0181 FGS FGS PT 0191 TV + 0143 REVISION DESCRIPTION FO FWS-V092 FGS PT 0192 FGS-V068 FGS-V069 I FWS-V091 APPR CHECKED CORRECT FGS POWERHOUSE DATE PT 0126 J FGS-V057 FGS FGS TE 0143-1 TW 0143-1 REVISION DESCRIPTION FWS FGS FGS K L PSV + 0000 TE 0143-2 TW 0143-2 APPR CHECKED CORRECT DATE 0831 PID-04-01B 0830 0830A TO CONDENSATE SUPPLY LINE PID-39-01A GAS TURBINE ACCESSORY MODULE 1A PID-39-02B GAS TURBINE ACCESSORY MODULE 1B 0830B PID-39-02C GAS TURBINE ACCESSORY MODULE 1C NOTES: M 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A. FUEL GAS SYSTEM SHEET 4 OF 4 131134-PID-08-07D-C NORTHPORT OPTION 9 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT

1 2 3 4 5 6 7 8 9 10 A VAPOR RETURN FILL REVISION DESCRIPTION D D B AFS CHEMICAL FILL AREA UNLOADING CONTAINMENT APPR CHECKED CORRECT PI 0103 DATE DRAIN REVISION DESCRIPTION C APPR D CHECKED CORRECT DATE AFS PI 0102 AFS AQUEOUS AMMONIA FORWARDING PUMP SKID 24" MANHOLE AFS-TK001 AQUEOUS AMMONIA PI 0104 REVISION DESCRIPTION E STORAGE TANK PSET=50.psig APPR CHECKED CORRECT AFS DATE F TI 0102 AFS AFS PDI 0105A PDI 0105B D D AFS LSH 0101 REVISION DESCRIPTION G M AFS-P001A AQUEOUS AMMONIA FORWARDING PUMP VENDOR AFS-P001B AQUEOUS AMMONIA FORWARDING PUMP VENDOR AFS LI 0101 APPR AFS CHECKED CORRECT DATE LT 0101 H REVISION DESCRIPTION I APPR AFS AFS AFS CHECKED CORRECT PCV + 0106 TI 0107 TW 0107 DATE V J AFS PI 0107 REVISION DESCRIPTION K L APPR POWERHOUSE D CHECKED CORRECT DATE AFS AFS-V001 LSH 0000 AFS-V002 SCR SYSTEM NOTES: M 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A. AQUEOUS AMMONIA STORAGE SYSTEM 131134-PID-13-17A-B NORTHPORT OPTION 9 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

A<br />

0823 PID-08-07C<br />

FROM FUEL GAS HEATER<br />

0820 PID-08-07C<br />

FROM HOT GAS<br />

SCRUBBER<br />

0810 PID-08-07B<br />

CONDENSATE DRAIN FROM<br />

FUEL GAS COMPRESSORS<br />

0821 PID-08-07C<br />

FROM HOT GAS<br />

SCRUBBER<br />

0811 PID-08-07C<br />

DRAIN FROM<br />

FUEL GAS HEATER<br />

0814 PID-08-07C<br />

REVISION DESCRIPTION<br />

DRAIN FROM<br />

FUEL GAS HEATER<br />

B<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

FWS<br />

HV<br />

+<br />

0000<br />

FGS<br />

GSV<br />

+<br />

0158<br />

REVISION DESCRIPTION<br />

C<br />

FWS<br />

FC<br />

FWS<br />

ZSO<br />

0000<br />

FGS<br />

ZI<br />

0000<br />

FWS<br />

ZSO<br />

0158<br />

APPR<br />

ZSC<br />

0000<br />

D<br />

FGS<br />

CHECKED<br />

CORRECT<br />

FWS-V077<br />

DATE<br />

ZSC<br />

0158<br />

FWS<br />

FWS<br />

FWS<br />

FWS<br />

LSL<br />

0180<br />

ZSC<br />

0180<br />

ZSO<br />

0180<br />

LSV<br />

+<br />

0180<br />

FWS-V078<br />

FWS-V079<br />

REVISION DESCRIPTION<br />

E<br />

ZSO<br />

0157<br />

ZSC<br />

0157<br />

FC<br />

GSV<br />

+<br />

0157<br />

APPR<br />

FGS<br />

CHECKED<br />

CORRECT<br />

DATE<br />

F<br />

FGS-V055<br />

FGS<br />

FE<br />

FLOW CONDITIONER<br />

+<br />

0142<br />

POWERHOUSE<br />

FGS<br />

FT<br />

0142<br />

REVISION DESCRIPTION<br />

G<br />

FGS-V056<br />

FWS-V093<br />

FGS<br />

FGS-TK001<br />

DRAIN TANK<br />

APPR<br />

CHECKED<br />

CORRECT<br />

TE<br />

0144<br />

FGS-FA001<br />

FGS-V052<br />

DATE<br />

H<br />

FGS<br />

FGS-V053<br />

FGS<br />

FGS-V054<br />

LIT<br />

0180<br />

FWS-V090<br />

LG<br />

0181<br />

FGS<br />

FGS<br />

PT<br />

0191<br />

TV<br />

+<br />

0143<br />

REVISION DESCRIPTION<br />

FO<br />

FWS-V092<br />

FGS<br />

PT<br />

0192<br />

FGS-V068 FGS-V069<br />

I<br />

FWS-V091<br />

APPR<br />

CHECKED<br />

CORRECT<br />

FGS<br />

POWERHOUSE<br />

DATE<br />

PT<br />

0126<br />

J<br />

FGS-V057<br />

FGS<br />

FGS<br />

TE<br />

0143-1<br />

TW<br />

0143-1<br />

REVISION DESCRIPTION<br />

FWS<br />

FGS<br />

FGS<br />

K L<br />

PSV<br />

+<br />

0000<br />

TE<br />

0143-2<br />

TW<br />

0143-2<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

0831 PID-04-01B<br />

0830<br />

0830A<br />

TO CONDENSATE<br />

SUPPLY LINE<br />

PID-39-01A<br />

GAS TURBINE<br />

ACCESSORY MODULE 1A<br />

PID-39-02B<br />

GAS TURBINE<br />

ACCESSORY MODULE 1B<br />

0830B<br />

PID-39-02C<br />

GAS TURBINE<br />

ACCESSORY MODULE 1C<br />

NOTES:<br />

M<br />

1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS,<br />

SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A.<br />

FUEL GAS SYSTEM<br />

SHEET 4 OF 4<br />

131134-PID-08-07D-C<br />

NORTHPORT OPTION 9<br />

DESIGNED BY<br />

DSGN CHK’D BY<br />

DRAWING NO.<br />

TM<br />

PIPING & INSTRUMENT<br />

FUNDAMENTAL DIAGRAM<br />

nationalgrid<br />

DRAWN BY<br />

CHK’D BY<br />

CAD MODEL<br />

N<br />

LEVELS<br />

WORK PKG<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

PCT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!