1 2 3 4 5 6 7 8 9 10 A 0823 PID-08-07C FROM FUEL GAS HEATER 0820 PID-08-07C FROM HOT GAS SCRUBBER 0810 PID-08-07B CONDENSATE DRAIN FROM FUEL GAS COMPRESSORS 0821 PID-08-07C FROM HOT GAS SCRUBBER 0811 PID-08-07C DRAIN FROM FUEL GAS HEATER 0814 PID-08-07C REVISION DESCRIPTION DRAIN FROM FUEL GAS HEATER B APPR CHECKED CORRECT DATE FWS HV + 0000 FGS GSV + 0158 REVISION DESCRIPTION C FWS FC FWS ZSO 0000 FGS ZI 0000 FWS ZSO 0158 APPR ZSC 0000 D FGS CHECKED CORRECT FWS-V077 DATE ZSC 0158 FWS FWS FWS FWS LSL 0180 ZSC 0180 ZSO 0180 LSV + 0180 FWS-V078 FWS-V079 REVISION DESCRIPTION E ZSO 0157 ZSC 0157 FC GSV + 0157 APPR FGS CHECKED CORRECT DATE F FGS-V055 FGS FE FLOW CONDITIONER + 0142 POWERHOUSE FGS FT 0142 REVISION DESCRIPTION G FGS-V056 FWS-V093 FGS FGS-TK001 DRAIN TANK APPR CHECKED CORRECT TE 0144 FGS-FA001 FGS-V052 DATE H FGS FGS-V053 FGS FGS-V054 LIT 0180 FWS-V090 LG 0181 FGS FGS PT 0191 TV + 0143 REVISION DESCRIPTION FO FWS-V092 FGS PT 0192 FGS-V068 FGS-V069 I FWS-V091 APPR CHECKED CORRECT FGS POWERHOUSE DATE PT 0126 J FGS-V057 FGS FGS TE 0143-1 TW 0143-1 REVISION DESCRIPTION FWS FGS FGS K L PSV + 0000 TE 0143-2 TW 0143-2 APPR CHECKED CORRECT DATE 0831 PID-04-01B 0830 0830A TO CONDENSATE SUPPLY LINE PID-39-01A GAS TURBINE ACCESSORY MODULE 1A PID-39-02B GAS TURBINE ACCESSORY MODULE 1B 0830B PID-39-02C GAS TURBINE ACCESSORY MODULE 1C NOTES: M 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A. FUEL GAS SYSTEM SHEET 4 OF 4 131134-PID-08-07D-C NORTHPORT OPTION 9 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT
1 2 3 4 5 6 7 8 9 10 A VAPOR RETURN FILL REVISION DESCRIPTION D D B AFS CHEMICAL FILL AREA UNLOADING CONTAINMENT APPR CHECKED CORRECT PI 0103 DATE DRAIN REVISION DESCRIPTION C APPR D CHECKED CORRECT DATE AFS PI 0102 AFS AQUEOUS AMMONIA FORWARDING PUMP SKID 24" MANHOLE AFS-TK001 AQUEOUS AMMONIA PI 0104 REVISION DESCRIPTION E STORAGE TANK PSET=50.psig APPR CHECKED CORRECT AFS DATE F TI 0102 AFS AFS PDI 0105A PDI 0105B D D AFS LSH 0101 REVISION DESCRIPTION G M AFS-P001A AQUEOUS AMMONIA FORWARDING PUMP VENDOR AFS-P001B AQUEOUS AMMONIA FORWARDING PUMP VENDOR AFS LI 0101 APPR AFS CHECKED CORRECT DATE LT 0101 H REVISION DESCRIPTION I APPR AFS AFS AFS CHECKED CORRECT PCV + 0106 TI 0107 TW 0107 DATE V J AFS PI 0107 REVISION DESCRIPTION K L APPR POWERHOUSE D CHECKED CORRECT DATE AFS AFS-V001 LSH 0000 AFS-V002 SCR SYSTEM NOTES: M 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A. AQUEOUS AMMONIA STORAGE SYSTEM 131134-PID-13-17A-B NORTHPORT OPTION 9 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT
- Page 23 and 24: Re-powering Study for the Northport
- Page 25 and 26: Re-powering Study for the Northport
- Page 27 and 28: Re-powering Study for the Northport
- Page 29 and 30: Re-powering Study for the Northport
- Page 31 and 32: 1 2 3 4 5 6 7 8 9 10 A SUPERHEATER
- Page 33 and 34: 1 2 3 4 5 6 7 8 9 10 A 0304 PID-03-
- Page 35 and 36: 1 2 3 4 5 6 7 8 9 10 A 0341 PID-03-
- Page 37: 1 2 3 4 5 6 7 8 9 10 A 0368 PID-03-
- Page 40 and 41: 1 2 3 4 5 6 7 8 9 10 A 0831 PID-08-
- Page 42 and 43: 1 2 3 4 5 6 7 8 9 10 A 0427 PID-04-
- Page 44 and 45: 1 2 3 4 5 6 7 8 9 10 A FGS FGS FGS
- Page 46 and 47: 1 2 3 4 5 6 7 8 9 10 A 0823 PID-08-
- Page 50 and 51: 1 2 3 4 5 6 7 8 9 10 0904 PID-09-09
- Page 52 and 53: 1 2 3 4 5 6 7 8 9 10 A FROM AIR COM
- Page 54 and 55: 1 2 3 4 5 6 7 8 9 10 A REVISION DES
- Page 56 and 57: 1 2 3 4 5 6 7 8 9 10 A 1330 PID-13-
- Page 58 and 59: 1 2 3 4 5 6 7 8 9 10 A FROM HRSG 1A
- Page 60 and 61: 1 2 3 4 5 6 7 8 9 10 A 0304 PID-03-
- Page 62 and 63: 1 2 3 4 5 6 7 8 9 10 A 0341 PID-03-
- Page 64 and 65: 1 2 3 4 5 6 7 8 9 10 A 0368 PID-03-
- Page 66 and 67: 1 2 3 4 5 6 7 8 9 10 A REVISION DES
- Page 68 and 69: 1 2 3 4 5 6 7 8 9 10 A 0831 PID-08-
- Page 70 and 71: 1 2 3 4 5 6 7 8 9 10 A 0427 PID-04-
- Page 72 and 73: 1 2 3 4 5 6 7 8 9 10 A FGS FGS FGS
- Page 76 and 77: 1 2 3 4 5 6 7 8 9 10 CCW VSH 0132A
- Page 78 and 79: 1 2 3 4 5 6 7 8 9 10 0904 PID-09-09
- Page 80 and 81: 1 2 3 4 5 6 7 8 9 10 A FROM AIR COM
- Page 82 and 83: 1 2 3 4 5 6 7 8 9 10 A REVISION DES
- Page 84 and 85: 1 2 3 4 5 6 7 8 9 10 A 1330 PID-13-
- Page 86 and 87: Re-powering Study for the Northport
- Page 88 and 89: Fuel Systems Re-powering Study for
- Page 90 and 91: Accessory Electric Plant Re-powerin
- Page 92 and 93: Fuel and Feed Re-powering Study for
- Page 94 and 95: Accessory Electric Plant Re-powerin
- Page 96 and 97: Re-powering Study for the Northport
- Page 98 and 99: Re-powering Study for the Northport
- Page 100 and 101: Re-powering Study for the Northport
- Page 102 and 103: Re-powering Study for the Northport
- Page 104 and 105: Re-powering Study for the Northport
- Page 106 and 107: Re-powering Study for the Northport
- Page 108 and 109: Re-powering Study for the Northport
- Page 110 and 111: • Grounding and lightning protect
- Page 112 and 113: Re-powering Study for the Northport
- Page 114 and 115: • Combustion turbine foundation
- Page 116 and 117: D3 Fuel Oil facilities Re-powering
- Page 118 and 119: Re-powering Study for the Northport
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
A<br />
0823 PID-08-07C<br />
FROM FUEL GAS HEATER<br />
0820 PID-08-07C<br />
FROM HOT GAS<br />
SCRUBBER<br />
0810 PID-08-07B<br />
CONDENSATE DRAIN FROM<br />
FUEL GAS COMPRESSORS<br />
0821 PID-08-07C<br />
FROM HOT GAS<br />
SCRUBBER<br />
0811 PID-08-07C<br />
DRAIN FROM<br />
FUEL GAS HEATER<br />
0814 PID-08-07C<br />
REVISION DESCRIPTION<br />
DRAIN FROM<br />
FUEL GAS HEATER<br />
B<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
FWS<br />
HV<br />
+<br />
0000<br />
FGS<br />
GSV<br />
+<br />
0158<br />
REVISION DESCRIPTION<br />
C<br />
FWS<br />
FC<br />
FWS<br />
ZSO<br />
0000<br />
FGS<br />
ZI<br />
0000<br />
FWS<br />
ZSO<br />
0158<br />
APPR<br />
ZSC<br />
0000<br />
D<br />
FGS<br />
CHECKED<br />
CORRECT<br />
FWS-V077<br />
DATE<br />
ZSC<br />
0158<br />
FWS<br />
FWS<br />
FWS<br />
FWS<br />
LSL<br />
0180<br />
ZSC<br />
0180<br />
ZSO<br />
0180<br />
LSV<br />
+<br />
0180<br />
FWS-V078<br />
FWS-V079<br />
REVISION DESCRIPTION<br />
E<br />
ZSO<br />
0157<br />
ZSC<br />
0157<br />
FC<br />
GSV<br />
+<br />
0157<br />
APPR<br />
FGS<br />
CHECKED<br />
CORRECT<br />
DATE<br />
F<br />
FGS-V055<br />
FGS<br />
FE<br />
FLOW CONDITIONER<br />
+<br />
0142<br />
POWERHOUSE<br />
FGS<br />
FT<br />
0142<br />
REVISION DESCRIPTION<br />
G<br />
FGS-V056<br />
FWS-V093<br />
FGS<br />
FGS-TK001<br />
DRAIN TANK<br />
APPR<br />
CHECKED<br />
CORRECT<br />
TE<br />
0144<br />
FGS-FA001<br />
FGS-V052<br />
DATE<br />
H<br />
FGS<br />
FGS-V053<br />
FGS<br />
FGS-V054<br />
LIT<br />
0180<br />
FWS-V090<br />
LG<br />
0181<br />
FGS<br />
FGS<br />
PT<br />
0191<br />
TV<br />
+<br />
0143<br />
REVISION DESCRIPTION<br />
FO<br />
FWS-V092<br />
FGS<br />
PT<br />
0192<br />
FGS-V068 FGS-V069<br />
I<br />
FWS-V091<br />
APPR<br />
CHECKED<br />
CORRECT<br />
FGS<br />
POWERHOUSE<br />
DATE<br />
PT<br />
0126<br />
J<br />
FGS-V057<br />
FGS<br />
FGS<br />
TE<br />
0143-1<br />
TW<br />
0143-1<br />
REVISION DESCRIPTION<br />
FWS<br />
FGS<br />
FGS<br />
K L<br />
PSV<br />
+<br />
0000<br />
TE<br />
0143-2<br />
TW<br />
0143-2<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
0831 PID-04-01B<br />
0830<br />
0830A<br />
TO CONDENSATE<br />
SUPPLY LINE<br />
PID-39-01A<br />
GAS TURBINE<br />
ACCESSORY MODULE 1A<br />
PID-39-02B<br />
GAS TURBINE<br />
ACCESSORY MODULE 1B<br />
0830B<br />
PID-39-02C<br />
GAS TURBINE<br />
ACCESSORY MODULE 1C<br />
NOTES:<br />
M<br />
1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS,<br />
SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A.<br />
FUEL GAS SYSTEM<br />
SHEET 4 OF 4<br />
131134-PID-08-07D-C<br />
NORTHPORT OPTION 9<br />
DESIGNED BY<br />
DSGN CHK’D BY<br />
DRAWING NO.<br />
TM<br />
PIPING & INSTRUMENT<br />
FUNDAMENTAL DIAGRAM<br />
nationalgrid<br />
DRAWN BY<br />
CHK’D BY<br />
CAD MODEL<br />
N<br />
LEVELS<br />
WORK PKG<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
PCT