Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...

Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ... Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...

23.12.2012 Views

1 2 3 4 5 6 7 8 9 10 A 0427 PID-04-01B FROM CONDENSATE SYSTEM FOR IP DRUM 1A - 1C FILL 0601 PID-06-01A FROM BOILER FEED PUMP IP DISCHARGE LINES 0426 PID-04-01B FROM CONDENSATE SYSTEM FOR HP DRUM FILL 0602 PID-O6-01A FROM BOILER FEED PUMP HP DISCHARGE LINES REVISION DESCRIPTION B APPR FWS-V029 CHECKED CORRECT DATE FWS-V031 FWS-V064 FWS TW 0123 FWS-V028 FWS-V066 FWS FWS FWS PT 0119 REVISION DESCRIPTION C FWS-V022 FWS FE FWS-V023A FWS-V024A TW 0123 TW 0123 FWS FWS FWS TW 0130 PT 0119 PT 0119 + 0120 FWS FWS-V023B FWS-V024B FWS FT 0120-1 FT 0120-2 FWS FWS FWS FE + 0121 PT 0131 FT 0121 FWS-V063 FWS FWS FWS-V053 FWS-V052 TE 0122-1 TW 0122-1 FWS-V022 FWS FE FWS-V023A FWS-V024A + 0120 FWS FWS FWS-V023B FWS-V024B FWS FWS FE + 0121 FT 0120-1 FT 0120-2 FWS-V022 FWS FE FWS-V023A FWS-V024A APPR D CHECKED CORRECT DATE + 0120 FWS FWS-V023B FWS-V024B FWS FT 0120-1 FT 0120-2 FWS-V032 FWS-V033 FT 0121 FWS FWS FWS FWS-V032 FWS-V033 FE + 0132 TE 0122-2 TW 0122-2 FWS FWS FWS FWS REVISION DESCRIPTION E TE 0122-1 TW 0122-1 TE 0122-1 TW 0122-1 FWS FT 0132-1 FWS-V055A FWS-V054A FWS-V054B FWS-V055B FWS FWS FWS FWS FWS FT 0132-2 TE 0122-2 TW 0122-2 TE 0122-2 TW 0122-2 FWS M FWS-V057A FWS-V056A FWS-V056B FWS-V057B APPR MOV + 0511 CHECKED CORRECT DATE FWS FWS F FWS M FWS M TE 0133-1 TW 0133-1 MOV + 0511 MOV + 0511 FWS FWS IP ECONOMIZER TE 0133-2 TW 0133-2 1A REVISION DESCRIPTION G IP ECONOMIZER 1B IP ECONOMIZER 1B FWS-V050 FWS APPR FWS FE + 0134 CHECKED CORRECT FWS FT 0134 FWS-V033 FWS-V034 DATE H LV + 0132 FO FWS-V058 FWS-V035 FWS-V036 REVISION DESCRIPTION I FWS-V020 FWS-V020 FWS-V020 FWS-V051 FWS FWS FWS APPR LV + 0120 LV + 0120 LV + 0120 CHECKED CORRECT FO FWS-V026 FO FWS-V026 FO FWS-V026 DATE J FWS-V021 FWS-V021 FWS-V021 REVISION DESCRIPTION K L 0610 TO HRSG IP DRUM 1A 0616 PID-08-07C TO FUEL GAS HEATER 0610 TO HRSG IP DRUM 1B 0616 PID-08-07C TO FUEL GAS HEATER 0610 TO HRSG IP DRUM 1C 0616 PID-08-07C TO FUEL GAS HEATER 0611 0611 TO REHEATER 1B ATTEMP APRAY 0612 TO HRSG 1A - 1C HP 0613 TO HRSG 1A - 1C HP ECONOMIZER INLET ECONOMIZER INLET HP SUPERHEATER 1A - 1C ATTEMP SPRAY 0608 PID-03-01A MAIN STEAM TURBINE BYPASS VALVE DESUPERHEATER SPRAY 0608 PID-03-01A MAIN STEAM TURBINE BYPASS VALVE DESUPERHEATER SPRAY 0608 PID-03-01A MAIN STEAM TURBINE BYPASS VALVE DESUPERHEATER SPRAY APPR CHECKED CORRECT DATE NOTES: M 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A. FEEDWATER SYSTEM SHEET 2 OF 2 131134-PID-06-01B-D NORTHPORT OPTION 9 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT

1 2 3 4 5 6 7 8 9 10 A EXISTING GAS PIPELINE REVISION DESCRIPTION B APPR CHECKED CORRECT DATE REVISION DESCRIPTION C APPR D GEAR OPERATED GEAR OPERATED CHECKED CORRECT FGS-V017 FGS-V027 DATE FGS FGS PDI 0168B FGS-V011 FGS-V012 FGS-FLT001B D PDI 0168A FGS-V021 FGS-V022 FGS-FLT001A FGS-V013 FGS-V023 REVISION DESCRIPTION D E APPR FGS FGS FGS FGS CHECKED CORRECT DATE F FI 0171B FE 0171B FI 0171A FE 0171A FGS FGS FGS FGS FGS FGS FGS FGS FY 0172B TI 0172B TE 0172B TW 0172B FY 0172A TI 0172A TE 0172A TW 0172A FGS FGS PT 0173B PT 0173A FGS-V015 FGS-V025 REVISION DESCRIPTION G APPR CHECKED CORRECT DATE H FGS FGS ZSC 0175B ZSC 0175A FGS FGS FGS FGS FGS ZSO 0175B MOV + 0175B ZSO 0175A MOV + 0175A REVISION DESCRIPTION ASME B31.8 ASME B31.8 HS 0175B M M I ASME B31.1 ASME B31.1 NATIONAL GRID METERING STATION (NOTE 2) APPR CHECKED CORRECT DATE J REVISION DESCRIPTION K L APPR CHECKED CORRECT DATE 0801 PID-08-07B TO FUEL GAS COMPRESSORS NOTES: 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A. 2. ASSUME TYPICAL ARRANGEMENT BY OWNER. M FUEL GAS SYSTEM SHEET 1 OF 4 131134-PID-08-07A-C NORTHPORT OPTION 9 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

A<br />

EXISTING<br />

GAS PIPELINE<br />

REVISION DESCRIPTION<br />

B<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

REVISION DESCRIPTION<br />

C<br />

APPR<br />

D<br />

GEAR OPERATED<br />

GEAR OPERATED<br />

CHECKED<br />

CORRECT<br />

FGS-V017<br />

FGS-V027<br />

DATE<br />

FGS<br />

FGS<br />

PDI<br />

0168B<br />

FGS-V011 FGS-V012<br />

FGS-FLT001B<br />

D<br />

PDI<br />

0168A<br />

FGS-V021 FGS-V022<br />

FGS-FLT001A<br />

FGS-V013<br />

FGS-V023<br />

REVISION DESCRIPTION<br />

D<br />

E<br />

APPR<br />

FGS<br />

FGS<br />

FGS<br />

FGS<br />

CHECKED<br />

CORRECT<br />

DATE<br />

F<br />

FI<br />

0171B<br />

FE<br />

0171B<br />

FI<br />

0171A<br />

FE<br />

0171A<br />

FGS<br />

FGS<br />

FGS<br />

FGS<br />

FGS<br />

FGS<br />

FGS<br />

FGS<br />

FY<br />

0172B<br />

TI<br />

0172B<br />

TE<br />

0172B<br />

TW<br />

0172B<br />

FY<br />

0172A<br />

TI<br />

0172A<br />

TE<br />

0172A<br />

TW<br />

0172A<br />

FGS<br />

FGS<br />

PT<br />

0173B<br />

PT<br />

0173A<br />

FGS-V015<br />

FGS-V025<br />

REVISION DESCRIPTION<br />

G<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

H<br />

FGS<br />

FGS<br />

ZSC<br />

0175B<br />

ZSC<br />

0175A<br />

FGS<br />

FGS<br />

FGS<br />

FGS<br />

FGS<br />

ZSO<br />

0175B<br />

MOV<br />

+<br />

0175B<br />

ZSO<br />

0175A<br />

MOV<br />

+<br />

0175A<br />

REVISION DESCRIPTION<br />

ASME<br />

B31.8<br />

ASME<br />

B31.8<br />

HS<br />

0175B<br />

M<br />

M<br />

I<br />

ASME<br />

B31.1<br />

ASME<br />

B31.1<br />

NATIONAL GRID METERING STATION<br />

(NOTE 2)<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

J<br />

REVISION DESCRIPTION<br />

K L<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

0801 PID-08-07B<br />

TO FUEL GAS COMPRESSORS<br />

NOTES:<br />

1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS,<br />

SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A.<br />

2. ASSUME TYPICAL ARRANGEMENT BY OWNER.<br />

M<br />

FUEL GAS SYSTEM<br />

SHEET 1 OF 4<br />

131134-PID-08-07A-C<br />

NORTHPORT OPTION 9<br />

DESIGNED BY<br />

DSGN CHK’D BY<br />

DRAWING NO.<br />

TM<br />

PIPING & INSTRUMENT<br />

FUNDAMENTAL DIAGRAM<br />

nationalgrid<br />

DRAWN BY<br />

CHK’D BY<br />

CAD MODEL<br />

N<br />

LEVELS<br />

WORK PKG<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

PCT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!