23.12.2012 Views

Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...

Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...

Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

A<br />

EXISTING<br />

REVISION DESCRIPTION<br />

CONDENSATE OVERFLOW<br />

DEMINERALIZER<br />

B<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

DEMINERALIZED<br />

WATER<br />

STORAGE TANK<br />

REVISION DESCRIPTION<br />

C<br />

PS<br />

LI<br />

LT<br />

APPR<br />

D<br />

CHECKED<br />

CORRECT<br />

DATE<br />

REVISION DESCRIPTION<br />

E<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

F<br />

REVISION DESCRIPTION<br />

G<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

H<br />

DEMINERALIZED WATER<br />

PUMP 2A<br />

DEMINERALIZED WATER<br />

PUMP 2B<br />

DEMINERALIZED WATER<br />

PUMP 2C<br />

REVISION DESCRIPTION<br />

PI<br />

PI<br />

PI<br />

I<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

J<br />

REVISION DESCRIPTION<br />

K L<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

NOTES:<br />

CYCLE MAKE-UP<br />

TO CONDENSER<br />

DEMINERALIZER<br />

CROSS TIE TO UNIT 1<br />

VACUUM PUMP 2A<br />

VACUUM PUMP 2B<br />

SAMPLE PANEL<br />

CYCLE CHEMICAL<br />

FEED SYSTEM<br />

1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS,<br />

MAKE-UP TO CLOSED CYCLE<br />

COOLING WATER SYSTEM<br />

VACUUM BREAKER VALVE/<br />

COND EJ WATER SEAL<br />

SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04.<br />

STATOR WINDING<br />

H COOLING UNIT<br />

2<br />

CONDENSATE PUMP 2A<br />

CONDENSATE PUMP 2B<br />

ST OIL PURIFIER<br />

CONDENSER FILL<br />

M<br />

DEMINERALIZED WATER SYSTEM<br />

SHEET 2 of 2<br />

131134-PID-09-21B-C<br />

NORTHPORT OPTION 4<br />

DESIGNED BY<br />

DSGN CHK’D BY<br />

DRAWING NO.<br />

TM<br />

PIPING & INSTRUMENT<br />

FUNDAMENTAL DIAGRAM<br />

nationalgrid<br />

DRAWN BY<br />

CHK’D BY<br />

CAD MODEL<br />

N<br />

LEVELS<br />

WORK PKG<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

PCT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!