Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...
Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...
Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
A<br />
REVISION DESCRIPTION<br />
ANTISCALANT FEED<br />
ALTERNATIVE<br />
DEMIN SUPPLY<br />
PERMEATE FROM<br />
SECOND PASS RO<br />
CHEMICAL TOTE<br />
FILLING<br />
B<br />
CITY WATER<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
TO POTABLE<br />
WATER SYSTEM<br />
REVISION DESCRIPTION<br />
C<br />
APPR<br />
D<br />
CHECKED<br />
CORRECT<br />
DATE<br />
RO PRETREATMENT<br />
(ULTRA FILTRATION)<br />
(BY VENDOR)<br />
RO FEED PUMP<br />
ELECTRO-DEIONIZATION SKID<br />
D<br />
(EDI)<br />
REVISION DESCRIPTION<br />
E<br />
(BY VENDOR)<br />
LT<br />
PI PT<br />
RO ANTISCALANT<br />
SOLUTION TANK<br />
APPR<br />
LT<br />
CHECKED<br />
CORRECT<br />
DATE<br />
F<br />
FIRST PASS<br />
RO PRESSURE<br />
VESSEL<br />
REVISION DESCRIPTION<br />
G<br />
RO FEED PUMP<br />
CONTAINMENT AREA<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
H<br />
PI PT<br />
REVISION DESCRIPTION<br />
I<br />
SECOND PASS<br />
RO PRESSURE<br />
VESSEL<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
J<br />
(BY VENDOR)<br />
(BY WATER TREATMENT VENDOR)<br />
REVISION DESCRIPTION<br />
PI<br />
K L<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
RO PERMEATE<br />
TO EDI SKID<br />
NOTES:<br />
RO CONCENTRATE<br />
TO WASTE<br />
CYCLE MAKE-UP /<br />
DEMIN STORAGE TANK<br />
1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS,<br />
FIRST PASS RO FEEDWATER<br />
M<br />
SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04.<br />
DEMINERALIZED WATER SYSTEM<br />
SHEET 1 of 2<br />
131134-PID-09-21A-C<br />
NORTHPORT OPTION 4<br />
DESIGNED BY<br />
DSGN CHK’D BY<br />
DRAWING NO.<br />
TM<br />
PIPING & INSTRUMENT<br />
FUNDAMENTAL DIAGRAM<br />
nationalgrid<br />
DRAWN BY<br />
CHK’D BY<br />
CAD MODEL<br />
N<br />
LEVELS<br />
WORK PKG<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
PCT