Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...
Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ... Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...
1 2 3 4 5 6 7 8 9 10 A FROM AIR COMPRESSOR/ DRYER SKID REVISION DESCRIPTION INSTRUMENT AIR SUPPLY FOR FIRE WATER PUMPHOUSE B APPR CHECKED CORRECT DATE IAS INSTRUMENT AIR SUPPLY TO DEMIN. AREA PT 0105-1 ELECTRONICS ROOM IAS IAS-V001 PT 0105-2 IAS IAS-V013 REVISION DESCRIPTION C IAS-V003 PT 0105-3 IAS-V001 IAS APPR D PI 0106 CHECKED CORRECT IAS-V002 DATE REVISION DESCRIPTION E IAS-V011 IAS-V006 APPR CHECKED CORRECT DATE F IAS-V004 IAS-V005 IAS-V010 REVISION DESCRIPTION G MACHINE SHOP MACHINE SHOP APPR CHECKED CORRECT DATE H LOOP AT HRSG DRUM LEVEL LOOP AT HRSG GROUND LEVEL LOOP AT STG REVISION DESCRIPTION I IAS-V012 APPR CHECKED CORRECT DATE J IAS-V009 IAS-V007 IAS-V008 REVISION DESCRIPTION K L APPR CHECKED CORRECT DATE 1202 LATER TO CEMS SHELTER 1203 PID-39-02A TO CTG 1204 PID-39-02A TO CTG AIR INLET FOGGER 1201 REF. 2 TO HIGH PRESSURE STEAM BYPASS VALVE VOLUME TANK 1205 REF. 3 TO HOT REHEAT STEAM BYPASS VALVE VOLUME TANK 1206 REF. 4 TO LOW PRESSURE STEAM BYPASS VALVE VOLUME TANK 1207 PID-08-07B TO FUEL GAS COMPRESSOR SKIDS NOTES: M 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04. INSTRUMENT AIR SYSTEM 131134-PID-12-01A-E NORTHPORT OPTION 4 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT
1 2 3 4 5 6 7 8 9 10 A FROM AIR COMPRESSORS REVISION DESCRIPTION B APPR CHECKED CORRECT DATE SAS PSV + 0101 REVISION DESCRIPTION C SAS-V010 SAS-V008 SAS PT 0102 SAS-V011 SAS-V009 D SAS-V018 SAS PI 0103 SAS-V001 SAS-V002 3/4 " 3/4 " APPR D CHECKED CORRECT DATE REVISION DESCRIPTION E SAS-V012 SAS-V007 SAS-V021 APPR CHECKED CORRECT F SAS-V020 SAS-V003 SAS-V004 DATE REVISION DESCRIPTION G APPR CHECKED CORRECT DATE D H SAS-V019 SAS-V014 SAS-V013 SAS-V005 REVISION DESCRIPTION SAS-V015 I SAS-V006 SAS-V022 APPR SAS-V018 D SAS-V016 CHECKED CORRECT DATE J SAS-V017 REVISION DESCRIPTION D K L APPR CHECKED CORRECT DATE NOTES: M 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A. SERVICE AIR SYSTEM 131134-PID-12-02A-E NORTHPORT OPTION 4 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT
- Page 1 and 2: Electric Resource Plan 2010 - 2020
- Page 3 and 4: March 30, 2009 Re-powering Study fo
- Page 5 and 6: Northport Repower Study Option 4 2x
- Page 7 and 8: Re-powering Study for the Northport
- Page 9 and 10: Re-powering Study for the Northport
- Page 11 and 12: Re-powering Study for the Northport
- Page 13 and 14: Re-powering Study for the Northport
- Page 15 and 16: Re-powering Study for the Northport
- Page 17 and 18: Re-powering Study for the Northport
- Page 19 and 20: Re-powering Study for the Northport
- Page 21 and 22: • Auxiliary Boiler System • All
- Page 23 and 24: Re-powering Study for the Northport
- Page 25 and 26: Re-powering Study for the Northport
- Page 27 and 28: Re-powering Study for the Northport
- Page 29 and 30: Re-powering Study for the Northport
- Page 31 and 32: 1 2 3 4 5 6 7 8 9 10 A SUPERHEATER
- Page 33 and 34: 1 2 3 4 5 6 7 8 9 10 A 0304 PID-03-
- Page 35 and 36: 1 2 3 4 5 6 7 8 9 10 A 0341 PID-03-
- Page 37: 1 2 3 4 5 6 7 8 9 10 A 0368 PID-03-
- Page 40 and 41: 1 2 3 4 5 6 7 8 9 10 A 0831 PID-08-
- Page 42 and 43: 1 2 3 4 5 6 7 8 9 10 A 0427 PID-04-
- Page 44 and 45: 1 2 3 4 5 6 7 8 9 10 A FGS FGS FGS
- Page 46 and 47: 1 2 3 4 5 6 7 8 9 10 A 0823 PID-08-
- Page 50 and 51: 1 2 3 4 5 6 7 8 9 10 0904 PID-09-09
- Page 54 and 55: 1 2 3 4 5 6 7 8 9 10 A REVISION DES
- Page 56 and 57: 1 2 3 4 5 6 7 8 9 10 A 1330 PID-13-
- Page 58 and 59: 1 2 3 4 5 6 7 8 9 10 A FROM HRSG 1A
- Page 60 and 61: 1 2 3 4 5 6 7 8 9 10 A 0304 PID-03-
- Page 62 and 63: 1 2 3 4 5 6 7 8 9 10 A 0341 PID-03-
- Page 64 and 65: 1 2 3 4 5 6 7 8 9 10 A 0368 PID-03-
- Page 66 and 67: 1 2 3 4 5 6 7 8 9 10 A REVISION DES
- Page 68 and 69: 1 2 3 4 5 6 7 8 9 10 A 0831 PID-08-
- Page 70 and 71: 1 2 3 4 5 6 7 8 9 10 A 0427 PID-04-
- Page 72 and 73: 1 2 3 4 5 6 7 8 9 10 A FGS FGS FGS
- Page 74 and 75: 1 2 3 4 5 6 7 8 9 10 A 0823 PID-08-
- Page 76 and 77: 1 2 3 4 5 6 7 8 9 10 CCW VSH 0132A
- Page 78 and 79: 1 2 3 4 5 6 7 8 9 10 0904 PID-09-09
- Page 80 and 81: 1 2 3 4 5 6 7 8 9 10 A FROM AIR COM
- Page 82 and 83: 1 2 3 4 5 6 7 8 9 10 A REVISION DES
- Page 84 and 85: 1 2 3 4 5 6 7 8 9 10 A 1330 PID-13-
- Page 86 and 87: Re-powering Study for the Northport
- Page 88 and 89: Fuel Systems Re-powering Study for
- Page 90 and 91: Accessory Electric Plant Re-powerin
- Page 92 and 93: Fuel and Feed Re-powering Study for
- Page 94 and 95: Accessory Electric Plant Re-powerin
- Page 96 and 97: Re-powering Study for the Northport
- Page 98 and 99: Re-powering Study for the Northport
- Page 100 and 101: Re-powering Study for the Northport
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
A<br />
FROM AIR COMPRESSORS<br />
REVISION DESCRIPTION<br />
B<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
SAS<br />
PSV<br />
+<br />
0101<br />
REVISION DESCRIPTION<br />
C<br />
SAS-V010<br />
SAS-V008<br />
SAS<br />
PT<br />
0102<br />
SAS-V011<br />
SAS-V009<br />
D<br />
SAS-V018<br />
SAS<br />
PI<br />
0103<br />
SAS-V001 SAS-V002<br />
3/4 " 3/4 "<br />
APPR<br />
D<br />
CHECKED<br />
CORRECT<br />
DATE<br />
REVISION DESCRIPTION<br />
E<br />
SAS-V012<br />
SAS-V007<br />
SAS-V021<br />
APPR<br />
CHECKED<br />
CORRECT<br />
F<br />
SAS-V020<br />
SAS-V003 SAS-V004<br />
DATE<br />
REVISION DESCRIPTION<br />
G<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
D<br />
H<br />
SAS-V019<br />
SAS-V014<br />
SAS-V013<br />
SAS-V005<br />
REVISION DESCRIPTION<br />
SAS-V015<br />
I<br />
SAS-V006<br />
SAS-V022<br />
APPR<br />
SAS-V018<br />
D<br />
SAS-V016<br />
CHECKED<br />
CORRECT<br />
DATE<br />
J<br />
SAS-V017<br />
REVISION DESCRIPTION<br />
D<br />
K L<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
NOTES:<br />
M<br />
1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS,<br />
SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A.<br />
SERVICE AIR<br />
SYSTEM<br />
131134-PID-12-02A-E<br />
NORTHPORT OPTION 4<br />
DESIGNED BY<br />
DSGN CHK’D BY<br />
DRAWING NO.<br />
TM<br />
PIPING & INSTRUMENT<br />
FUNDAMENTAL DIAGRAM<br />
nationalgrid<br />
DRAWN BY<br />
CHK’D BY<br />
CAD MODEL<br />
N<br />
LEVELS<br />
WORK PKG<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
PCT