Re-powering Study for the Northport and Port Jefferson Power Stations Appendix I Northport Schedules Appendix I Northport Schedules March 30, 2009 142
Northport Repower Study Option 4 2x2x1 501G Re-use Unit 4 Steam Turbine Once Through Cooling LIPA issues RFP for PPA National Grid Selected for PPA Negotiate PPA PPA Approved BY LIPA NY State Comptroller PPA Approval Bid & Award Owners Engineer Contract Prepare Permitting Documents Obtain Permits Bid & Award EPC Contract Detailed Engineering & Design Begin Site Construction Award PO for CTG Manufacture & Deliver CTG Erect CTG Award PO for HRSG Manufacture & Deliver HRSG Erect HRSG Demolish Unit 4 Turbine Bldg Piping & Equip Install New Steam Piping and Refurbish U-4 STG Commissioning Unit 4 out of Service Begin Commercial Operation Re-powering Study for the Northport and Port Jefferson Power Stations Appendix I Northport Schedules Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 Q13 Q14 Q15 Q16 Q17 Q18 Q19 Q20 Q21 Q22 Q23 Q24 Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 March 30, 2009 143
- Page 1 and 2: Electric Resource Plan 2010 - 2020
- Page 3: March 30, 2009 Re-powering Study fo
- Page 7 and 8: Re-powering Study for the Northport
- Page 9 and 10: Re-powering Study for the Northport
- Page 11 and 12: Re-powering Study for the Northport
- Page 13 and 14: Re-powering Study for the Northport
- Page 15 and 16: Re-powering Study for the Northport
- Page 17 and 18: Re-powering Study for the Northport
- Page 19 and 20: Re-powering Study for the Northport
- Page 21 and 22: • Auxiliary Boiler System • All
- Page 23 and 24: Re-powering Study for the Northport
- Page 25 and 26: Re-powering Study for the Northport
- Page 27 and 28: Re-powering Study for the Northport
- Page 29 and 30: Re-powering Study for the Northport
- Page 31 and 32: 1 2 3 4 5 6 7 8 9 10 A SUPERHEATER
- Page 33 and 34: 1 2 3 4 5 6 7 8 9 10 A 0304 PID-03-
- Page 35 and 36: 1 2 3 4 5 6 7 8 9 10 A 0341 PID-03-
- Page 37: 1 2 3 4 5 6 7 8 9 10 A 0368 PID-03-
- Page 40 and 41: 1 2 3 4 5 6 7 8 9 10 A 0831 PID-08-
- Page 42 and 43: 1 2 3 4 5 6 7 8 9 10 A 0427 PID-04-
- Page 44 and 45: 1 2 3 4 5 6 7 8 9 10 A FGS FGS FGS
- Page 46 and 47: 1 2 3 4 5 6 7 8 9 10 A 0823 PID-08-
- Page 50 and 51: 1 2 3 4 5 6 7 8 9 10 0904 PID-09-09
- Page 52 and 53: 1 2 3 4 5 6 7 8 9 10 A FROM AIR COM
Northport Repower Study<br />
Option 4<br />
2x2x1 501G Re-use Unit 4 Steam Turbine<br />
Once Through Cooling<br />
LIPA issues RFP for PPA<br />
National Grid Selected for PPA<br />
Negotiate PPA<br />
PPA Approved BY LIPA<br />
NY State Comptroller PPA Approval<br />
Bid & Award Owners Engineer Contract<br />
Prepare Permitting Documents<br />
Obtain Permits<br />
Bid & Award EPC Contract<br />
Detailed Engineering & Design<br />
Begin Site Construction<br />
Award PO for CTG<br />
Manufacture & Deliver CTG<br />
Erect CTG<br />
Award PO for HRSG<br />
Manufacture & Deliver HRSG<br />
Erect HRSG<br />
Demolish Unit 4 Turbine Bldg Piping & Equip<br />
Install New Steam Piping <strong>and</strong> Refurbish U-4 STG<br />
Commissioning<br />
Unit 4 out of Service<br />
Begin Commercial Operation<br />
Re-powering Study for the Northport <strong>and</strong> Port Jefferson Power Stations<br />
<strong>Appendix</strong> I Northport Schedules<br />
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6<br />
Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 Q13 Q14 Q15 Q16 Q17 Q18 Q19 Q20 Q21 Q22 Q23 Q24<br />
Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72<br />
March 30, 2009 143