Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...

Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ... Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...

23.12.2012 Views

1 2 3 4 5 6 7 8 9 10 A REVISION DESCRIPTION 0933 PID-09-21A CONDENSATE MAKE-UP LINE 0936 PID-09-21A CONDENSATE MAKE-UP LINE FOR START UP 1101 PID-11-01A 1102 PID-11-01A STG STEAM DRAIN SYSTEM MANIFOLD 1103 PID-11-01B LOW PRESSURE DRAIN SYSTEM MANIFOLD B HIGH PRESSURE DRAIN SYSTEM MANIFOLD APPR CHECKED CORRECT DATE REVISION DESCRIPTION C APPR D CNM CHECKED CORRECT DATE TW 0110 LG-1 CNM LG-1 TW 0114 CNM-V001A CNM-V001B REVISION DESCRIPTION E PI-1 CNM-VXXX CNM PDT 0115A CNM-V002A CNM CNM-STR001A D PDT 0115B CNM-V002B CNM-STR001B D PI-1 CNM-V003A CNM-V003B CNM-VXXX CONDENSATE HOTWELL TANK APPR CHECKED CORRECT CNM CNM-V004A CNM CNM-V004B DATE F PSV + 0116A PSV + 0116B PI-1 CNM-VXXX CNM PSET=50.psig CNM PSET=50.psig PI 0118A PI 0118B LG-1 CNM-V005A CNM-V005B REVISION DESCRIPTION G CNM-V013A CNM-V013B APPR CNM CNM-V014A CNM CNM-EJ001A CNM-V014B CHECKED CORRECT TE 0162A TE 0162B CNM-EJ001B DATE VACUUM BREAKER H M CNM-P001A CONDENSATE PUMP 1A M CNM-P001B CONDENSATE PUMP 1B CNM TE 0163A TE 0163B CNM CNM CNM CNM PI 0170A PI 0170B REVISION DESCRIPTION TE 0164A TE 0164B I CNM CNM TE 0165A TE 0165B CNM CNM CNM CNM APPR PCV + 0171A PCV + 0171B TE 0166A CNM TE 0166B CNM CHECKED CORRECT DATE PI 0119A PI 0119B CNM TE 0264A CNM-V008A CNM CNM-V008B CNM TE J 0264B CNM TW 0109A TW 0109B CNM-V009A CNM-V010A D CNM-STR002A CNM-V012A CNM-V011A CNM-V009B CNM-V010B D CNM-STR002B CNM-V012B REVISION DESCRIPTION CNM-V011B K L APPR CHECKED CORRECT DATE NOTES: 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A. FROM HRSG 1A LP STEAM SYSTEM 0402 PID-03-4A 0361A BYPASS VALVE PID-03-4A 0343A FROM HRSG 1B LP STEAM SYSTEM BYPASS VALVE PID-03-4A 0361B FROM HRSG 1A HOT REHEAT SYSTEM BYPASS VALVE PID-03-4A 0343B FROM HRSG 1B HOT REHEAT SYSTEM BYPASS VALVE PID-04-1B PID-05-01A PID-05-01A PID-04-01B CONDENSATE PUMP 0501 0502 DISTRIBUTION SYSTEM 0406 MIN. FLOW RECIRC. DRAIN SJAE INTERCOND. DRAIN SJAE AFTERCOND. DRAIN PID-04-01B 0420 SUPPLY FOR SEALWATER M CONDENSATE SYSTEM SHEET 1 OF 2 131134-PID-04-01A-D NORTHPORT OPTION 4 PCT DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

A<br />

REVISION DESCRIPTION<br />

0933 PID-09-21A<br />

CONDENSATE MAKE-UP LINE<br />

0936 PID-09-21A<br />

CONDENSATE MAKE-UP LINE FOR START UP<br />

1101 PID-11-01A<br />

1102 PID-11-01A<br />

STG STEAM DRAIN SYSTEM MANIFOLD<br />

1103 PID-11-01B<br />

LOW PRESSURE DRAIN SYSTEM MANIFOLD<br />

B<br />

HIGH PRESSURE DRAIN SYSTEM MANIFOLD<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

REVISION DESCRIPTION<br />

C<br />

APPR<br />

D<br />

CNM<br />

CHECKED<br />

CORRECT<br />

DATE<br />

TW<br />

0110<br />

LG-1<br />

CNM<br />

LG-1<br />

TW<br />

0114<br />

CNM-V001A<br />

CNM-V001B<br />

REVISION DESCRIPTION<br />

E<br />

PI-1<br />

CNM-VXXX<br />

CNM<br />

PDT<br />

0115A<br />

CNM-V002A<br />

CNM<br />

CNM-STR001A<br />

D<br />

PDT<br />

0115B<br />

CNM-V002B<br />

CNM-STR001B<br />

D<br />

PI-1<br />

CNM-V003A<br />

CNM-V003B<br />

CNM-VXXX<br />

CONDENSATE HOTWELL TANK<br />

APPR<br />

CHECKED<br />

CORRECT<br />

CNM<br />

CNM-V004A<br />

CNM<br />

CNM-V004B<br />

DATE<br />

F<br />

PSV<br />

+<br />

0116A<br />

PSV<br />

+<br />

0116B<br />

PI-1<br />

CNM-VXXX<br />

CNM<br />

PSET=50.psig<br />

CNM<br />

PSET=50.psig<br />

PI<br />

0118A<br />

PI<br />

0118B<br />

LG-1<br />

CNM-V005A<br />

CNM-V005B<br />

REVISION DESCRIPTION<br />

G<br />

CNM-V013A<br />

CNM-V013B<br />

APPR<br />

CNM<br />

CNM-V014A<br />

CNM<br />

CNM-EJ001A<br />

CNM-V014B<br />

CHECKED<br />

CORRECT<br />

TE<br />

0162A<br />

TE<br />

0162B<br />

CNM-EJ001B<br />

DATE<br />

VACUUM<br />

BREAKER<br />

H<br />

M<br />

CNM-P001A<br />

CONDENSATE PUMP<br />

1A<br />

M<br />

CNM-P001B<br />

CONDENSATE PUMP<br />

1B<br />

CNM<br />

TE<br />

0163A<br />

TE<br />

0163B<br />

CNM<br />

CNM<br />

CNM<br />

CNM<br />

PI<br />

0170A<br />

PI<br />

0170B<br />

REVISION DESCRIPTION<br />

TE<br />

0164A<br />

TE<br />

0164B<br />

I<br />

CNM<br />

CNM<br />

TE<br />

0165A<br />

TE<br />

0165B<br />

CNM<br />

CNM<br />

CNM<br />

CNM<br />

APPR<br />

PCV<br />

+<br />

0171A<br />

PCV<br />

+<br />

0171B<br />

TE<br />

0166A<br />

CNM<br />

TE<br />

0166B<br />

CNM<br />

CHECKED<br />

CORRECT<br />

DATE<br />

PI<br />

0119A<br />

PI<br />

0119B<br />

CNM<br />

TE<br />

0264A<br />

CNM-V008A<br />

CNM<br />

CNM-V008B<br />

CNM<br />

TE<br />

J<br />

0264B<br />

CNM<br />

TW<br />

0109A<br />

TW<br />

0109B<br />

CNM-V009A CNM-V010A<br />

D<br />

CNM-STR002A<br />

CNM-V012A<br />

CNM-V011A<br />

CNM-V009B CNM-V010B<br />

D<br />

CNM-STR002B<br />

CNM-V012B<br />

REVISION DESCRIPTION<br />

CNM-V011B<br />

K L<br />

APPR<br />

CHECKED<br />

CORRECT<br />

DATE<br />

NOTES:<br />

1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS,<br />

SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A.<br />

FROM HRSG 1A LP STEAM SYSTEM<br />

0402<br />

PID-03-4A 0361A<br />

BYPASS VALVE<br />

PID-03-4A 0343A<br />

FROM HRSG 1B LP STEAM SYSTEM<br />

BYPASS VALVE<br />

PID-03-4A 0361B<br />

FROM HRSG 1A HOT REHEAT SYSTEM<br />

BYPASS VALVE<br />

PID-03-4A 0343B<br />

FROM HRSG 1B HOT REHEAT SYSTEM<br />

BYPASS VALVE<br />

PID-04-1B<br />

PID-05-01A<br />

PID-05-01A<br />

PID-04-01B<br />

CONDENSATE PUMP<br />

0501<br />

0502<br />

DISTRIBUTION SYSTEM<br />

0406<br />

MIN. FLOW RECIRC. DRAIN<br />

SJAE INTERCOND. DRAIN<br />

SJAE AFTERCOND. DRAIN<br />

PID-04-01B 0420<br />

SUPPLY FOR SEALWATER<br />

M<br />

CONDENSATE SYSTEM<br />

SHEET 1 OF 2<br />

131134-PID-04-01A-D<br />

NORTHPORT OPTION 4 PCT<br />

DESIGNED BY<br />

DSGN CHK’D BY<br />

DRAWING NO.<br />

TM<br />

PIPING & INSTRUMENT<br />

FUNDAMENTAL DIAGRAM<br />

nationalgrid<br />

DRAWN BY<br />

CHK’D BY<br />

CAD MODEL<br />

N<br />

LEVELS<br />

WORK PKG<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!