Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...
Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ... Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...
1 2 3 4 5 6 7 8 9 10 A REVISION DESCRIPTION HRSG LP SUPERHEATER OUTLET 1A HRSG LP SUPERHEATER OUTLET 1B 0424 PID-04-01B DESUPERHEATER SUPPLY FROM CONDENSATE SYSTEM B APPR CHECKED CORRECT DATE CNM-V060B CNM-STR004 REVISION DESCRIPTION C CNM FT 0101 CNM-V061B CNM-V062B CNM APPR D FE + + 0101 CHECKED CORRECT DATE CNM CNM TE 0102 TW 0102 CNM REVISION DESCRIPTION E HV 0305 FC LPS LPS CNM PT 0100-1 PT 0100-1 ZSC 0305 APPR LPS CNM PT 0100-2 LPS-V001A LPS-V001B LPS-V002A LPS CNM LPS PT 0100-2 TV + 0102 FE + 0103 FC LPS LPS FT 0103-1 LPS-V002B LPS-V003B FT 0103-2 LPS-V001A LPS-V001B LPS-V002A CHECKED CORRECT DATE F LPS ZSO 0305 FE + 0103 LPS LPS FT 0103-1 LPS-V003A LPS-V002B LPS-V003B FT 0103-2 LPS-V003A REVISION DESCRIPTION G LPS LPS LPS LPS CNM-V064B TE 0111-1 TW 0111-1 TE 0111-1 TW 0111-1 APPR LPS LPS LPS LPS CHECKED CORRECT DATE TE 0111-2 TW 0111-2 TE 0111-2 TW 0111-2 H LPS LPS LPS LPS LPS PV + 0100 TE 0109-1 TW 0109-1 TE 0109-2 TW 0109-2 REVISION DESCRIPTION FC I LPS PI 0107 LPS LPS LPS APPR LPS-V012 CHECKED CORRECT LSH 0118-1 LSH 0118-1 LE 0118-1 DATE LPS LPS I&C TI 0108 TW 0108 J LPS-V010 LPS-V011 LPS-V013 D LPS-V015 REVISION DESCRIPTION LPS-V014 K L I&C LPS LPS APPR LSHH 0118-2 LE 0118-2 CHECKED CORRECT DATE 0368 PID-03-04B TO LP STEAM TURBINE 0361 NOTES: PID-03-12A TO STEAM DUCT SPARGER 0360 PID-11-01B 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, TO STEAM DRAIN COLLECTION SYSTEM M SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A. LOW PRESSURE STEAM SYSTEM SHEET 1 OF 2 131134-PID-03-04A-C NORTHPORT OPTION 4 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT
1 2 3 4 5 6 7 8 9 10 A 0368 PID-03-04A LOW PRESSURE STEAM 0368 SUPPLY A PID-03-04A LOW PRESSURE STEAM SUPPLY B REVISION DESCRIPTION LPS B LE 0114-1 APPR CHECKED CORRECT V D DATE I&C LPS-V021 LPS-V024 D LPS-V025 LPS-V022 LPS-V023 I&C REVISION DESCRIPTION C V D LPS LE 0114-2 APPR D LPS CHECKED CORRECT DATE PT 0106 LPS LPS PP 0100 LV + 0114 LPS LPS LPS-V027 LPS-V028 LO LPS-V026 FO TE 0104 TW 0104 LPS LPS REVISION DESCRIPTION E TW 0105 ZSC 0114 LPS ZSO 0114 APPR CHECKED CORRECT EMERGENCY STOP VALVE CONTROL VALVE DATE F SDS TE 0118 TMB TMB IP ESV + 0105 CV + 0106 10" LP REVISION DESCRIPTION G APPR CHECKED CORRECT DATE H REVISION DESCRIPTION I LO SDS SDS-V003 LO SDS SDS-V004 APPR CHECKED CORRECT ZSC 0125 ZSC 0120 DATE SDS SDS SDS SDS ZSO 0125 ZSO 0120 J FV + 0125 FV + 0120 REVISION DESCRIPTION FO FO K L APPR CHECKED CORRECT DATE 0364 PID-11-01B TO STEAM DRAIN COLLECTION SYSTEM 0365 PID-11-01B TO STEAM DRAIN COLLECTION SYSTEM 0366 PID-11-01B TO STEAM DRAIN COLLECTION SYSTEM 0362 PID-11-01B TO STEAM DRAIN COLLECTION SYSTEM NOTES: 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A. 2. STRAINER INTEGRAL TO ESV. M LOW PRESSURE STEAM SYSTEM SHEET 2 OF 2 131134-PID-03-04B-C NORTHPORT OPTION 4 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT
- Page 1 and 2: Electric Resource Plan 2010 - 2020
- Page 3 and 4: March 30, 2009 Re-powering Study fo
- Page 5 and 6: Northport Repower Study Option 4 2x
- Page 7 and 8: Re-powering Study for the Northport
- Page 9 and 10: Re-powering Study for the Northport
- Page 11 and 12: Re-powering Study for the Northport
- Page 13 and 14: Re-powering Study for the Northport
- Page 15 and 16: Re-powering Study for the Northport
- Page 17 and 18: Re-powering Study for the Northport
- Page 19 and 20: Re-powering Study for the Northport
- Page 21 and 22: • Auxiliary Boiler System • All
- Page 23 and 24: Re-powering Study for the Northport
- Page 25 and 26: Re-powering Study for the Northport
- Page 27 and 28: Re-powering Study for the Northport
- Page 29 and 30: Re-powering Study for the Northport
- Page 31 and 32: 1 2 3 4 5 6 7 8 9 10 A SUPERHEATER
- Page 33 and 34: 1 2 3 4 5 6 7 8 9 10 A 0304 PID-03-
- Page 35: 1 2 3 4 5 6 7 8 9 10 A 0341 PID-03-
- Page 40 and 41: 1 2 3 4 5 6 7 8 9 10 A 0831 PID-08-
- Page 42 and 43: 1 2 3 4 5 6 7 8 9 10 A 0427 PID-04-
- Page 44 and 45: 1 2 3 4 5 6 7 8 9 10 A FGS FGS FGS
- Page 46 and 47: 1 2 3 4 5 6 7 8 9 10 A 0823 PID-08-
- Page 50 and 51: 1 2 3 4 5 6 7 8 9 10 0904 PID-09-09
- Page 52 and 53: 1 2 3 4 5 6 7 8 9 10 A FROM AIR COM
- Page 54 and 55: 1 2 3 4 5 6 7 8 9 10 A REVISION DES
- Page 56 and 57: 1 2 3 4 5 6 7 8 9 10 A 1330 PID-13-
- Page 58 and 59: 1 2 3 4 5 6 7 8 9 10 A FROM HRSG 1A
- Page 60 and 61: 1 2 3 4 5 6 7 8 9 10 A 0304 PID-03-
- Page 62 and 63: 1 2 3 4 5 6 7 8 9 10 A 0341 PID-03-
- Page 64 and 65: 1 2 3 4 5 6 7 8 9 10 A 0368 PID-03-
- Page 66 and 67: 1 2 3 4 5 6 7 8 9 10 A REVISION DES
- Page 68 and 69: 1 2 3 4 5 6 7 8 9 10 A 0831 PID-08-
- Page 70 and 71: 1 2 3 4 5 6 7 8 9 10 A 0427 PID-04-
- Page 72 and 73: 1 2 3 4 5 6 7 8 9 10 A FGS FGS FGS
- Page 74 and 75: 1 2 3 4 5 6 7 8 9 10 A 0823 PID-08-
- Page 76 and 77: 1 2 3 4 5 6 7 8 9 10 CCW VSH 0132A
- Page 78 and 79: 1 2 3 4 5 6 7 8 9 10 0904 PID-09-09
- Page 80 and 81: 1 2 3 4 5 6 7 8 9 10 A FROM AIR COM
- Page 82 and 83: 1 2 3 4 5 6 7 8 9 10 A REVISION DES
- Page 84 and 85: 1 2 3 4 5 6 7 8 9 10 A 1330 PID-13-
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
A<br />
0368 PID-03-04A<br />
LOW PRESSURE STEAM<br />
0368<br />
SUPPLY A<br />
PID-03-04A<br />
LOW PRESSURE STEAM<br />
SUPPLY B<br />
REVISION DESCRIPTION<br />
LPS<br />
B<br />
LE<br />
0114-1<br />
APPR<br />
CHECKED<br />
CORRECT<br />
V<br />
D<br />
DATE<br />
I&C<br />
LPS-V021<br />
LPS-V024<br />
D<br />
LPS-V025<br />
LPS-V022<br />
LPS-V023<br />
I&C<br />
REVISION DESCRIPTION<br />
C<br />
V<br />
D<br />
LPS<br />
LE<br />
0114-2<br />
APPR<br />
D<br />
LPS<br />
CHECKED<br />
CORRECT<br />
DATE<br />
PT<br />
0106<br />
LPS<br />
LPS<br />
PP<br />
0100<br />
LV<br />
+<br />
0114<br />
LPS<br />
LPS<br />
LPS-V027 LPS-V028<br />
LO<br />
LPS-V026<br />
FO<br />
TE<br />
0104<br />
TW<br />
0104<br />
LPS<br />
LPS<br />
REVISION DESCRIPTION<br />
E<br />
TW<br />
0105<br />
ZSC<br />
0114<br />
LPS<br />
ZSO<br />
0114<br />
APPR<br />
CHECKED<br />
CORRECT<br />
EMERGENCY STOP VALVE<br />
CONTROL VALVE<br />
DATE<br />
F<br />
SDS<br />
TE<br />
0118<br />
TMB<br />
TMB<br />
IP<br />
ESV<br />
+<br />
0105<br />
CV<br />
+<br />
0106<br />
10"<br />
LP<br />
REVISION DESCRIPTION<br />
G<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
H<br />
REVISION DESCRIPTION<br />
I<br />
LO<br />
SDS<br />
SDS-V003<br />
LO<br />
SDS<br />
SDS-V004<br />
APPR<br />
CHECKED<br />
CORRECT<br />
ZSC<br />
0125<br />
ZSC<br />
0120<br />
DATE<br />
SDS<br />
SDS<br />
SDS<br />
SDS<br />
ZSO<br />
0125<br />
ZSO<br />
0120<br />
J<br />
FV<br />
+<br />
0125<br />
FV<br />
+<br />
0120<br />
REVISION DESCRIPTION<br />
FO<br />
FO<br />
K L<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
0364 PID-11-01B<br />
TO STEAM DRAIN<br />
COLLECTION SYSTEM<br />
0365 PID-11-01B<br />
TO STEAM DRAIN<br />
COLLECTION SYSTEM<br />
0366 PID-11-01B<br />
TO STEAM DRAIN<br />
COLLECTION SYSTEM<br />
0362 PID-11-01B<br />
TO STEAM DRAIN<br />
COLLECTION SYSTEM<br />
NOTES:<br />
1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS,<br />
SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A.<br />
2. STRAINER INTEGRAL TO ESV.<br />
M<br />
LOW PRESSURE STEAM SYSTEM<br />
SHEET 2 OF 2<br />
131134-PID-03-04B-C<br />
NORTHPORT OPTION 4<br />
DESIGNED BY<br />
DSGN CHK’D BY<br />
DRAWING NO.<br />
TM<br />
PIPING & INSTRUMENT<br />
FUNDAMENTAL DIAGRAM<br />
nationalgrid<br />
DRAWN BY<br />
CHK’D BY<br />
CAD MODEL<br />
N<br />
LEVELS<br />
WORK PKG<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
PCT