Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...
Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ... Appendix E-2.c.i Energy Plan 2004-2013 Follow-up Studies and ...
1 2 3 4 5 6 7 8 9 10 A HRSG REHEAT OUTLET 1A 0425 PID-04-01B DESUPERHEATING SPRAY FROM CONDENSATE SYSTEM HRSG REHEAT OUTLET 1B 0425 PID-04-01B DESUPERHEATING SPRAY FROM CONDENSATE SYSTEM REVISION DESCRIPTION B APPR CHECKED CORRECT DATE CNM-V060A CNM-V060A CNM-STR003 CNM-STR003 REVISION DESCRIPTION C CNM CNM CNM FE + 0103 CNM FE + 0103 FT 0103 CNM-V061A CNM-V062A FT 0103 CNM-V061A CNM-V062A APPR D CHECKED CORRECT DATE CNM CNM CNM CNM TE 0104 TW 0104 TE 0104 TW 0104 CNM CNM HV + 0306 HV + 0306 REVISION DESCRIPTION E FC FC CNM CNM ZSC 0306 ZSC 0306 CNM CNM CNM CNM ZSO 0306 ZSO 0306 APPR TV + 0104 TV + 0104 CHECKED CORRECT DATE FC FC F HRS PT 0100-1 CNM-V064A HRS PT 0100-1 CNM-V064A HRS HRS-V003A HRS HRS-V003A REVISION DESCRIPTION G PT 0100-2 HRS PT 0100-2 HRS HRS-V003B FE + 0105 HRS-V003B FE + 0105 HRS HRS HRS FT 0105-1 HRS-V004A HRS-V004B FT 0105-2 FT 0105-1 HRS-V004A HRS-V004B HRS FT 0105-2 APPR HRS HRS HRS HRS HRS HRS HRS HRS HRS HRS CHECKED CORRECT HRS-V005B HRS-V005B PV + 0100 TE 0106-1 TW 0106-1 TE 0106-2 TW 0106-2 PV + 0100 HOT REHEAT BYPASS VALVE FC HRS-V005B HRS-V005B TE 0106-1 TW 0106-1 TE 0106-2 TW 0106-2 DATE HOT REHEAT BYPASS VALVE FC H HRS HRS HRS HRS TE 0109-1 TW 0109-1 TE VENDOR VENDOR 0109-1 TW 0109-1 VENDOR HRS HRS HRS HRS VENDOR TE 0109-2 TW 0109-2 TE 0109-2 TW 0109-2 HRS HRS REVISION DESCRIPTION HRS LSH 0123-1 LE 0123-1 I PI 0120 HRS-V006 HRS HRS APPR TI 0121 TW 0121 HRS-V015 HRS-V016 HRS-V017 CHECKED CORRECT DATE D HRS J HRS-V019 PI 0120 HRS-V018 HRS-V006 HRS HRS LSH HRS HRS 0123-1 LE 0123-1 TI 0121 TW 0121 HRS HRS HRS LAHH 0123-2 LSHH 0123-2 LE 0123-2 REVISION DESCRIPTION HRS HRS-V015 HRS-V016 HRS-V017 K L XA 0123-2 D APPR HRS-V019 CHECKED CORRECT HRS-V018 DATE HRS HRS HRS LAHH 0123-2 LSHH 0123-2 LE 0123-2 HRS NOTES: 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A. 0341 PID-03-03B TO HOT REHEAT STEAM 0342 PID-11-01B XA 0123-2 SHEET 2 TO STEAM DUCT SPRAGER 0342 PID-11-01B TO STEAM DRAIN COLLECTION SYSTEM 0343 PID-03-12A TO STEAM DUCT SPARGER 0342 PID-11-01B TO STEAM DRAIN COLLECTION SYSTEM M HOT REHEAT STEAM SYSTEM SHEET 1 OF 2 131134-PID-03-03A-C NORTHPORT OPTION 4 PCT DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10 A 0341 PID-03-03A HOT REHEAT STEAM SHEET 1 REVISION DESCRIPTION B APPR CHECKED CORRECT DATE D HRS HRS HRS HRS-V010 TE 0110 TW 0110 PT 0103 REVISION DESCRIPTION C HRS PP 0115 HRS-V012 HRS-V013 LO HRS-V011 HRS HRS TW 0107 TV + 0110 APPR D CHECKED CORRECT HRS HRS FO DATE TE 0104 TW 0104 STEAM TURBINE HRS PACKAGE ZSC 0110 HRS ZSO 0110 REVISION DESCRIPTION E SDS TE 0115 APPR EMERGENCY STOP VALVE CHECKED CORRECT HRS EMERGENCY STOP VALVE DATE F TMI + CONTROL VALVE HRS + CONTROL VALVE TMI HRS HRS PP 0106A PP 0106B ESV 0103A CV 0104A CV + 0104B ESV + 0103B IP REVISION DESCRIPTION G LP CASING DRAIN BEFORE SEAT DRAIN APPR CHECKED CORRECT DATE H REVISION DESCRIPTION I LO SDS-V010 LO SDS FV + 0146 SDS-V011 FO SDS FV LO SDS-V002 LO SDS SDS SDS-V005 ZSC 0146 ZSC 0144 SDS SDS APPR SDS SDS ZSC 0126 ZSC 0154 CHECKED CORRECT DATE ZSO 0146 ZSO 0144 SDS SDS SDS SDS ZSO 0126 ZSO 0154 + 0144 FV + 0126 FV + 0154 J FO FO FO SDS SDS RO + 0146 RO + 0144 REVISION DESCRIPTION RO RO K L APPR CHECKED CORRECT DATE 0344 PID-11-01A TO STEAM DRAIN COLLECTION SYSTEM 0346 PID-11-01A TO STEAM DRAIN COLLECTION SYSTEM 0347 PID-11-01A TO STEAM DRAIN COLLECTION SYSTEM 0348 PID-11-01A TO STEAM DRAIN COLLECTION SYSTEM 0345 PID-11-01A TO STEAM DRAIN NOTES: COLLECTION SYSTEM 1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS, SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A. 2. STRAINER INTEGRAL TO ESV. M HOT REHEAT STEAM SYSTEM SHEET 2 OF 2 131134-PID-03-03B-C NORTHPORT OPTION 4 DESIGNED BY DSGN CHK’D BY DRAWING NO. TM PIPING & INSTRUMENT FUNDAMENTAL DIAGRAM nationalgrid DRAWN BY CHK’D BY CAD MODEL N LEVELS WORK PKG 1 2 3 4 5 6 7 8 9 10 PCT
- Page 1 and 2: Electric Resource Plan 2010 - 2020
- Page 3 and 4: March 30, 2009 Re-powering Study fo
- Page 5 and 6: Northport Repower Study Option 4 2x
- Page 7 and 8: Re-powering Study for the Northport
- Page 9 and 10: Re-powering Study for the Northport
- Page 11 and 12: Re-powering Study for the Northport
- Page 13 and 14: Re-powering Study for the Northport
- Page 15 and 16: Re-powering Study for the Northport
- Page 17 and 18: Re-powering Study for the Northport
- Page 19 and 20: Re-powering Study for the Northport
- Page 21 and 22: • Auxiliary Boiler System • All
- Page 23 and 24: Re-powering Study for the Northport
- Page 25 and 26: Re-powering Study for the Northport
- Page 27 and 28: Re-powering Study for the Northport
- Page 29 and 30: Re-powering Study for the Northport
- Page 31 and 32: 1 2 3 4 5 6 7 8 9 10 A SUPERHEATER
- Page 33: 1 2 3 4 5 6 7 8 9 10 A 0304 PID-03-
- Page 37: 1 2 3 4 5 6 7 8 9 10 A 0368 PID-03-
- Page 40 and 41: 1 2 3 4 5 6 7 8 9 10 A 0831 PID-08-
- Page 42 and 43: 1 2 3 4 5 6 7 8 9 10 A 0427 PID-04-
- Page 44 and 45: 1 2 3 4 5 6 7 8 9 10 A FGS FGS FGS
- Page 46 and 47: 1 2 3 4 5 6 7 8 9 10 A 0823 PID-08-
- Page 50 and 51: 1 2 3 4 5 6 7 8 9 10 0904 PID-09-09
- Page 52 and 53: 1 2 3 4 5 6 7 8 9 10 A FROM AIR COM
- Page 54 and 55: 1 2 3 4 5 6 7 8 9 10 A REVISION DES
- Page 56 and 57: 1 2 3 4 5 6 7 8 9 10 A 1330 PID-13-
- Page 58 and 59: 1 2 3 4 5 6 7 8 9 10 A FROM HRSG 1A
- Page 60 and 61: 1 2 3 4 5 6 7 8 9 10 A 0304 PID-03-
- Page 62 and 63: 1 2 3 4 5 6 7 8 9 10 A 0341 PID-03-
- Page 64 and 65: 1 2 3 4 5 6 7 8 9 10 A 0368 PID-03-
- Page 66 and 67: 1 2 3 4 5 6 7 8 9 10 A REVISION DES
- Page 68 and 69: 1 2 3 4 5 6 7 8 9 10 A 0831 PID-08-
- Page 70 and 71: 1 2 3 4 5 6 7 8 9 10 A 0427 PID-04-
- Page 72 and 73: 1 2 3 4 5 6 7 8 9 10 A FGS FGS FGS
- Page 74 and 75: 1 2 3 4 5 6 7 8 9 10 A 0823 PID-08-
- Page 76 and 77: 1 2 3 4 5 6 7 8 9 10 CCW VSH 0132A
- Page 78 and 79: 1 2 3 4 5 6 7 8 9 10 0904 PID-09-09
- Page 80 and 81: 1 2 3 4 5 6 7 8 9 10 A FROM AIR COM
- Page 82 and 83: 1 2 3 4 5 6 7 8 9 10 A REVISION DES
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
A<br />
0341 PID-03-03A<br />
HOT REHEAT STEAM<br />
SHEET 1<br />
REVISION DESCRIPTION<br />
B<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
D<br />
HRS<br />
HRS<br />
HRS<br />
HRS-V010<br />
TE<br />
0110<br />
TW<br />
0110<br />
PT<br />
0103<br />
REVISION DESCRIPTION<br />
C<br />
HRS<br />
PP<br />
0115<br />
HRS-V012 HRS-V013<br />
LO<br />
HRS-V011<br />
HRS<br />
HRS<br />
TW<br />
0107<br />
TV<br />
+<br />
0110<br />
APPR<br />
D<br />
CHECKED<br />
CORRECT<br />
HRS<br />
HRS<br />
FO<br />
DATE<br />
TE<br />
0104<br />
TW<br />
0104<br />
STEAM TURBINE<br />
HRS<br />
PACKAGE<br />
ZSC<br />
0110<br />
HRS<br />
ZSO<br />
0110<br />
REVISION DESCRIPTION<br />
E<br />
SDS<br />
TE<br />
0115<br />
APPR<br />
EMERGENCY STOP VALVE<br />
CHECKED<br />
CORRECT<br />
HRS<br />
EMERGENCY STOP VALVE<br />
DATE<br />
F<br />
TMI<br />
+<br />
CONTROL VALVE<br />
HRS<br />
+<br />
CONTROL VALVE<br />
TMI<br />
HRS<br />
HRS<br />
PP<br />
0106A<br />
PP<br />
0106B<br />
ESV<br />
0103A<br />
CV<br />
0104A<br />
CV<br />
+<br />
0104B<br />
ESV<br />
+<br />
0103B<br />
IP<br />
REVISION DESCRIPTION<br />
G<br />
LP<br />
CASING DRAIN<br />
BEFORE SEAT DRAIN<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
H<br />
REVISION DESCRIPTION<br />
I<br />
LO<br />
SDS-V010<br />
LO<br />
SDS<br />
FV<br />
+<br />
0146<br />
SDS-V011 FO<br />
SDS<br />
FV<br />
LO<br />
SDS-V002<br />
LO<br />
SDS<br />
SDS<br />
SDS-V005<br />
ZSC<br />
0146<br />
ZSC<br />
0144<br />
SDS<br />
SDS<br />
APPR<br />
SDS<br />
SDS<br />
ZSC<br />
0126<br />
ZSC<br />
0154<br />
CHECKED<br />
CORRECT<br />
DATE<br />
ZSO<br />
0146<br />
ZSO<br />
0144<br />
SDS<br />
SDS<br />
SDS<br />
SDS<br />
ZSO<br />
0126<br />
ZSO<br />
0154<br />
+<br />
0144<br />
FV<br />
+<br />
0126<br />
FV<br />
+<br />
0154<br />
J<br />
FO<br />
FO<br />
FO<br />
SDS<br />
SDS<br />
RO<br />
+<br />
0146<br />
RO<br />
+<br />
0144<br />
REVISION DESCRIPTION<br />
RO<br />
RO<br />
K L<br />
APPR<br />
CHECKED<br />
CORRECT<br />
DATE<br />
0344 PID-11-01A<br />
TO STEAM DRAIN<br />
COLLECTION SYSTEM<br />
0346 PID-11-01A<br />
TO STEAM DRAIN<br />
COLLECTION SYSTEM<br />
0347 PID-11-01A<br />
TO STEAM DRAIN<br />
COLLECTION SYSTEM<br />
0348 PID-11-01A<br />
TO STEAM DRAIN<br />
COLLECTION SYSTEM<br />
0345 PID-11-01A<br />
TO STEAM DRAIN<br />
NOTES:<br />
COLLECTION SYSTEM<br />
1. FOR GENERAL NOTES, SYMBOLS AND NUMBERING STANDARDS,<br />
SEE S&W DRAWINGS 131134-PID-00-01A THRU 00-04A.<br />
2. STRAINER INTEGRAL TO ESV.<br />
M<br />
HOT REHEAT STEAM SYSTEM<br />
SHEET 2 OF 2<br />
131134-PID-03-03B-C<br />
NORTHPORT OPTION 4<br />
DESIGNED BY<br />
DSGN CHK’D BY<br />
DRAWING NO.<br />
TM<br />
PIPING & INSTRUMENT<br />
FUNDAMENTAL DIAGRAM<br />
nationalgrid<br />
DRAWN BY<br />
CHK’D BY<br />
CAD MODEL<br />
N<br />
LEVELS<br />
WORK PKG<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
PCT