Re-powering Study for the Northport <strong>and</strong> Port Jefferson Power Stations<br />
<strong>Appendix</strong> VII Northport Capital Cost Estimate Descriptions<br />
• A new septic system is included for sanitary waste from the new administration building.<br />
E3 Utilities<br />
The following items are included in this account:<br />
• Service <strong>and</strong> instrument air system<br />
• Potable water<br />
• Service water system including two pumps<br />
• Yard fire protection system including pump house with dual motor driven fire pumps, jockey<br />
pump, combination 500,000 gallon city water/firewater storage tank <strong>and</strong> hydrants, deluge<br />
systems; <strong>and</strong> hoses<br />
PA Pipe Rack Module<br />
Pipe rack from HRSG’s to steam turbine including high energy piping.<br />
PW Miscellaneous Bulks-<strong>Plan</strong>t Wide<br />
This account includes the following:<br />
• Miscellaneous equipment foundations<br />
• Painting <strong>and</strong> protective finishes<br />
• Pipe s<strong>up</strong>ports<br />
• Nuts, bolts <strong>and</strong> gasket allowance<br />
I/K Buildings <strong>and</strong> Structures<br />
This account includes:<br />
• Administration, control room, warehouse, water treatment, <strong>and</strong> service/instrument air systems<br />
building<br />
• Combustion turbine building<br />
• Combustion turbine room crane<br />
• Steam turbine building<br />
• Steam turbine room crane<br />
• HRSG building<br />
• New fire pump house<br />
• 4160 Power Distribution Control (PDC) buildings (one for each CT)<br />
March 30, 2009 256