D3 Fuel Oil facilities<br />

Re-powering Study for the Northport <strong>and</strong> Port Jefferson Power Stations<br />

<strong>Appendix</strong> VII Northport Capital Cost Estimate Descriptions<br />

The distillate oil s<strong>up</strong>ply includes demolition of the existing dock west of unit 1 <strong>and</strong> installation of a new<br />

dock for barge unloading including unloading pumps <strong>and</strong> piping. An existing No. 6 oil tank will be<br />

demolished <strong>and</strong> replaced with a new 5,000,000 gallon distillate oil storage tank sized for approximately<br />

five days operation. The new storage tank will be equipped with distillate oil forwarding pumps.<br />

D3 Onsite Natural Gas System<br />

The natural gas s<strong>up</strong>ply system is comprised of fuel gas piping <strong>and</strong> fuel gas conditioning equipment such<br />

as a scrubber, moisture separator, coalescing filters, filter /separator, metering equipment <strong>and</strong> fuel gas<br />

heaters. New, underground gas piping from a connection point at the existing gas yard to the new units is<br />

included.<br />

G5 <strong>Plan</strong>t Instruments <strong>and</strong> Controls<br />

This account includes:<br />

• Distributed control system, including HRSG controls, turbine generator controls, boiler feed<br />

pump controls, <strong>and</strong> computer for data acquisition <strong>and</strong> logging.<br />

• Continuous emissions monitoring system, one per HRSG<br />

• Field instruments <strong>and</strong> controls<br />

• Local control boards <strong>and</strong> panels<br />

• Bulk installation materials<br />

F Cooling Area<br />

This account includes:<br />

• Air-cooled condenser<br />

• Foundation<br />

• Air cooled condenser electrical building<br />

• Condensate tank<br />

G1 <strong>Plan</strong>t Electrical<br />

This account includes the following:<br />

• 4160V switchgear<br />

• 480 v load centers<br />

• Motor control centers<br />

• Non segregated bus duct<br />

• Power cable <strong>and</strong> terminations<br />

• Instrument cable <strong>and</strong> terminations<br />

• Conduit <strong>and</strong> raceway<br />