• Combustion turbine foundation<br />

• Step <strong>up</strong> transformers 13.8 to 345 kV (one for each CT)<br />

• Auxiliary transformers (one for each CT)<br />

• Generator breakers (one for each CT)<br />

• High side gas insulated breakers<br />

• Generator hydrogen <strong>and</strong> CO system<br />

2<br />

• Associated electrical connections, metering <strong>and</strong> protection<br />

• Oily water collection system<br />

• Wash water drain tank <strong>and</strong> pumps<br />

• Lube oil collection system<br />

B1 Steam Turbine Vendor Package<br />

Re-powering Study for the Northport <strong>and</strong> Port Jefferson Power Stations<br />

<strong>Appendix</strong> VII Northport Capital Cost Estimate Descriptions<br />

A nominal 300 MW down exhaust reheat steam turbine with throttle steam conditions of 1900 psig,<br />

1050ºF <strong>and</strong> a single low pressure admission point. The turbine has a hydrogen cooled electric generator.<br />

The steam turbine includes:<br />

• Hydraulically operated main steam valves consisting of partial arc admission valves with a<br />

common emergency stop valve.<br />

• Hydraulically operated governing control <strong>and</strong> stop valves for reheat <strong>and</strong> LP admission steam<br />

• Strainers for valves, steam traps <strong>and</strong> drain valves<br />

• Exhaust casing relief diaphragm(s)<br />

• Vacuum breaker<br />

• Exhaust hood spray system<br />

• Turning gear<br />

• Noise enclosure<br />

• Complete, fault-tolerant, electrohydraulic control (EHC) system with<br />

o Vibration probes, axial position probes <strong>and</strong> monitoring system.<br />

o Dual redundant differential expansion measurement<br />

o Bentley Nevada TDXNET Module<br />

• Lube oil conditioning system<br />

• Static excitation system<br />

B1 Steam Turbine Balance of <strong>Plan</strong>t<br />

The following equipment is part of the steam turbine balance of plant:<br />

• Steam turbine foundation <strong>and</strong> pedestal<br />

• Lube oil system<br />