• Grounding <strong>and</strong> lightning protection<br />

• Heat tracing<br />

• Cathodic protection<br />

E1 Site Development<br />

Re-powering Study for the Northport <strong>and</strong> Port Jefferson Power Stations<br />

<strong>Appendix</strong> VII Northport Capital Cost Estimate Descriptions<br />

This account includes the following required for new combined cycle equipment:<br />

• Subsurface investigation<br />

• Site preparation<br />

• General excavation <strong>and</strong> backfill<br />

• Piling<br />

• Erosion control<br />

• Roads <strong>and</strong> parking<br />

• Fencing<br />

• L<strong>and</strong>scaping<br />

• Drainage<br />

• Row of lighting poles to the north of existing road to be relocated (if required) to the new road.<br />

• Buried communication line (possibly fiber optic) that runs north from a utility pole on the north<br />

side of the existing road.<br />

• Miscellaneous buried conduits that run north (or northwest) from a utility pole on the southeast<br />

corner of the area.<br />

• Storm drain on the north edge of the area.<br />

• The existing recharge basin at the northwest corner of the area will be relocated<br />

F1/F2 Water/Wastewater Treatment Area<br />

The area includes:<br />

• Make<strong>up</strong> water s<strong>up</strong>ply <strong>and</strong> treatment systems consisting of two 100-percent make<strong>up</strong> water s<strong>up</strong>ply<br />

pumps, two-100% (130 gpm each) RO systems with electro deionization <strong>and</strong> including a<br />

1,000,000 gallon storage tank for demineralized water. The tank will provide approximately 20<br />

hours of storage when firing distillate oil <strong>and</strong> approximately 5 days of storage with natural gas<br />

firing.<br />

• Wastewater treatment for boiler blowdown, equipment washes, wastes <strong>and</strong> oily wastes from<br />

equipment area drains; will be directed to the existing wastewater treatment facility. Drains for<br />

plant equipment areas will be directed to oil/water separator(s) prior to discharge. Reject water<br />

from the RO system will be directed to the inlet lagoon.<br />

• It is assumed that the existing septic system(s) serving Unit 4 will be reused. A new septic<br />

system is included for sanitary waste from the new administration building.<br />