• Continuous emissions monitoring system, one per HRSG<br />
• Field instruments <strong>and</strong> controls<br />
• Local control boards <strong>and</strong> panels<br />
• Bulk installation materials<br />
F Cooling System Area<br />
Re-powering Study for the Northport <strong>and</strong> Port Jefferson Power Stations<br />
<strong>Appendix</strong> VII Northport Capital Cost Estimate Descriptions<br />
It is assumed that cooling system modifications required to comply with 316b requirements will have<br />
been accomplished before the repowering project is done. This will include converting the main<br />
circulating water pumps to variable speed operation. The modified system will be reused for the<br />
repowering project including trash racks, traveling screens, main circulating water pumps, concrete<br />
circulating water piping, condenser, waterboxes, condenser air removal system, etc. An allowance has<br />
been included in the repowering project cost estimate for miscellaneous refurbishment/replacement of<br />
circulating water system components.<br />
G1 <strong>Plan</strong>t Electrical<br />
The existing electrical equipment required for existing equipment that will remain in service will be<br />
reused including 4160V switchgear, 480 V load centers, motor control centers, cable, raceway, lighting,<br />
etc. An allowance has been included in the repowering project cost estimate for miscellaneous<br />
refurbishment/replacement. The existing emergency generator will be retained.<br />
This account includes the following required for the new combined cycle equipment:<br />
• 4160 V switchgear<br />
• 480 v load centers<br />
• Motor control centers<br />
• Non segregated bus duct<br />
• Power cable <strong>and</strong> terminations<br />
• Instrument cable <strong>and</strong> terminations<br />
• Conduit <strong>and</strong> raceway<br />
• Communications systems<br />
• Security <strong>and</strong> surveillance system<br />
• Fire detection system<br />
G2 Yard Electrical<br />
The existing yard electrical associated with the existing plant will be reused<br />
This account includes required for the new combined cycle equipment:<br />
• Yard lighting<br />
• Cable tray <strong>and</strong> conduit<br />
• Electrical duct bank<br />