• Continuous emissions monitoring system, one per HRSG<br />

• Field instruments <strong>and</strong> controls<br />

• Local control boards <strong>and</strong> panels<br />

• Bulk installation materials<br />

F Cooling System Area<br />

Re-powering Study for the Northport <strong>and</strong> Port Jefferson Power Stations<br />

<strong>Appendix</strong> VII Northport Capital Cost Estimate Descriptions<br />

It is assumed that cooling system modifications required to comply with 316b requirements will have<br />

been accomplished before the repowering project is done. This will include converting the main<br />

circulating water pumps to variable speed operation. The modified system will be reused for the<br />

repowering project including trash racks, traveling screens, main circulating water pumps, concrete<br />

circulating water piping, condenser, waterboxes, condenser air removal system, etc. An allowance has<br />

been included in the repowering project cost estimate for miscellaneous refurbishment/replacement of<br />

circulating water system components.<br />

G1 <strong>Plan</strong>t Electrical<br />

The existing electrical equipment required for existing equipment that will remain in service will be<br />

reused including 4160V switchgear, 480 V load centers, motor control centers, cable, raceway, lighting,<br />

etc. An allowance has been included in the repowering project cost estimate for miscellaneous<br />

refurbishment/replacement. The existing emergency generator will be retained.<br />

This account includes the following required for the new combined cycle equipment:<br />

• 4160 V switchgear<br />

• 480 v load centers<br />

• Motor control centers<br />

• Non segregated bus duct<br />

• Power cable <strong>and</strong> terminations<br />

• Instrument cable <strong>and</strong> terminations<br />

• Conduit <strong>and</strong> raceway<br />

• Communications systems<br />

• Security <strong>and</strong> surveillance system<br />

• Fire detection system<br />

G2 Yard Electrical<br />

The existing yard electrical associated with the existing plant will be reused<br />

This account includes required for the new combined cycle equipment:<br />

• Yard lighting<br />

• Cable tray <strong>and</strong> conduit<br />

• Electrical duct bank<br />

March 30, 2009 247