Re-powering Study for the Northport and Port Jefferson Power Stations Appendix VI Northport Water Balances March 30, 2009 240

Re-powering Study for the Northport and Port Jefferson Power Stations Appendix VII Northport Capital Cost Estimate Descriptions Appendix VII Northport Capital Cost Estimate Descriptions March 30, 2009 241

Re-powering Study for the Northport <strong>and</strong> Port Jefferson Power Stations<br />

<strong>Appendix</strong> VII Northport Capital Cost Estimate Descriptions<br />

<strong>Appendix</strong> VII Northport Capital Cost Estimate Descriptions<br />

March 30, 2009 241