Comparison between Renewable Projects

- High degree of certainty

- On site data measurement not needed,

interpolated ground based and satellite

data can be used

- Long term data sets available

SOLAR vs WIND

1. Resource

2. Energy Output

- Less certainty on resource estimation

- On site data measurement needed for a

period of 1 year

- Correlation against regional measurement

have been challenging

- Low capacity factors (18-26% on P50

depending on tracking equipment)

- Higher capacity factors (32-38% on P50)

3. Construction/Equipment

- Minimal construction risk, rating

agencies refer to “deployment risk”

- Off the shelf components, can be

packed into standard sea containers

- Inverters need to replaced during the

life of the projects

- Towers needs substantial foundation

structures

- Equipment difficult to move and

install on site (large cranes needed)

HYDRO vs WIND

1

2

3

Water flow

Limits on Amount of Water

Requires Sizing of Turbine and

Tradeoff Between Capacity Amount

and the Capacity Factor

Linear Relationship for Hydro

Wind Speed

No Limits on Amount of Air

Cubic Power Curve for Wind Speed

versus Wind Power

6

More volatility in water flow

4 Less volatility in wind speed

Less Uncertainty From Other Factors

Like Shear, Correlations, Wake, Icing,

Measurement