AD.V
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
AREA | SITE
BASED APPROACH PROJECT
CASE STUDY
AREA | SITE
BASED APPROACH PROJECT
TKTS Booth
Times Square, New York, United States
Choi Ropiha, Perkins Eastman
2008
BOOK MOUNTAIN
Netherlands
MVRDV
2012
WHY ????
BOOK MOUNTAIN
Netherlands
MVRDV
2012
WHAT IS THE ATTITUDE TOWARD TO
ARCHITECTURE ???
Human | Thinking | Art | Painting | Architecture
Which keywords start first and last ???
A Transformation of thought
As we call
CONCEPTUAL IDEA
PROCESS OF THINKING
so
What is MVRDV might thinking of???
AREA | SITE trace back to the needs of its society.
RE THINK - CITY
MILLION STORY
MEGA CITY – MICRO NARRATIVE
WHAT IS
MUSEUM ????
AND
HOW TO RE-THINK?
The History and Theory of the Museum Building.
Treasure Chambers, Showcases and
Show-stopping Temples are a Thing of the Past
Museums will be the Workshops of the Future!
Hans Wolfgang Hoffmann
Christian Schittich. Museum Buildings : Construction and Design Manual. DETAIL, 2016.
Leonardo da Vinci:
Studies for an AutomobilePen and ink over metalpoint, Milan, c. 1480
Christian Schittich. Museum Buildings : Construction and Design Manual. DETAIL, 2016.
Leonardo da Vinci:
Studies for an AutomobilePen and ink over metalpoint, Milan, c. 1480
A sketch book of Leonardo da Vinci
- NuVinci
Christian Schittich. Museum Buildings : Construction and Design Manual. DETAIL, 2016.
Could a museum have accelerated the development process?
It is certainly the case that such a facility had been established precisely between the occurrences of these events.
The institution was to present the out-of-the-ordinary in such a manner
that it would sow the seeds for our future. The core objective therefore
consists in transformation. Museums may share this thinking with
schools –
it is just that the approaches are the exact oppo-site of each other. In the one case, what is being conveyed is of
existential importance, in the other it has no relevance whatso -ever. Ultimately, schools are focused on (young)
people, whereas museums evolve from the specialist subject.
Christian Schittich. Museum Buildings : Construction and Design Manual. DETAIL, 2016.
The Treasure Trove of Scholars
Early example of a thesaurus: the treasury at Delphic. 500 B.C.
Of course, statues, flags and militaria cannot be melted down.
Thus, the symbolic remainder is exhibited – this has less
to do with its own sake as it is about the slogan: “you
see, this now no longer belongs to others!”
The rigidity of use imposes its char-acter on the design. All treasure troves are the most
nondescript temples: overall, the façade displays relatively small and compact gables
and columns. All other walls are closed. The security dimension, which no museum can
escape to this day, is the most prominent voice.
Christian Schittich. Museum Buildings : Construction and Design Manual. DETAIL, 2016.
A Window on the World of the Bourgeousie
The Show-stopping Temple of the Masses
THE FOUR MAIN GROUPS OF MUSEUMS
Christian Schittich. Museum Buildings : Construction and Design Manual. DETAIL, 2016.
Art Museum
Territorial Museum
Science Museum
Event Museum
Museum vs Context
Museum vs Space Allocation Plans
Museum vs Space Allocation Plans
Museum vs Access
Museum vs Space Allocation Plans
Museum vs Public non exhibition area
Museum vs Space Allocation Plans
Museum vs Main entrance
Museum vs Space Allocation Plans
Museum vs Spatial sequences
Museum vs Space Allocation Plans
Museum vs Exhibition
Museum vs Space Allocation Plans
Museum vs Floor Plan Arrangement
Museum vs Space Allocation Plans
Museum vs Hanging
Building Services Engineering
Museum vs Lighting
Building Services Engineering
Museum vs Security
THE NEW MUSEUM OF
CONTEMPORARY ART
NEW YORK, UNITED STATES
SANAA
2007
THE NEW MUSEUM OF
CONTEMPORARY ART
EXTENTION
NEW YORK, UNITED STATES
OMA
2020
LOUVRE LENS
LENS, FRANCE
SANAA
2006
21st century museum of
contemporary art
KANAZAWA, JAPAN
SANAA
2004
AREA | SITE think + rethink with the city.
HOW TO READ THE CITY
THE IMAGE OF THE CITY
ภาพเมืองในใจ
ภาพเมืองในใจ
ติดตา + ตรึงใจ
สายตา ความทรงจ า ความสุข
to be seen | to be remembered | to delight in
ภูมิสถาน
กรุงเทพมหานคร
กรุงเทพฯ ดุจเทพสร้าง เมืองศูนย์กลางการปกครอง วัดวังงามเรืองรอง เมืองหลวงของประเทศไทย
สุโขทัย มรดกโลกล ้าเลิศ ก าเนิดลายสือไทย เล่นไฟลอยกระทง ด ารงพุทธศาสนา
งามตาผ้าตีนจก สังคโลกทองโบราณ สักการแม่ย่าพ่อขุน รุ่งอรุณแห่งความสุข
เชียงราย เหนือสุดในสยาม ชายแดนสามแผ่นดิน ถิ่นวัฒนธรรมล้านนา ล ้าค่าพระธาตุดอยตุง
สมุทรปราการ ป้อมยุทธนาวี พระเจดีย์กลางน ้า ฟาร์มจระเข้ใหญ่ งามวิไลเมืองโบราณ
สงกรานต์พระประแดง ปลาสลิดแห้งรสดี ประเพณีรับบัว ครบถ้วนทั่วอุตสาหกรรม
สุราษฎร์ธานี
เมืองร้อยเกาะ เงาะอร่อย หอยใหญ่ ไข่แดง แหล่งธรรมะ
ตรัง เมืองพระยารัษฎา ชาวประชาใจกว้าง หมูย่างรสเลิศ ถิ่นก าเนิดยางพารา
องค์ประกอบสภาพแวดล้อม
Components of an environmental image
1. เอกลักษณ์ (Identity)
ความแตกต่าง ความพิเศษกว่าสิ่งอื่น ความปรากฏ
เฉพาะตัว ความปรากฏเป็นหนึ่งเดียว หรืออยู่ใน
องค์รวมเดียวกัน อันก่อให้เกิด the spirit of place
หรือ “Genius Loci”
เช่น ในมหานครกรุงเทพฯ เรามีภาพในใจของย่านต่างๆ
... ย่านเยาวราช สยามสแควร์ สามแพร่ง ฯลฯ
2. โครงสร้าง (Structure)
ภาพในใจที่รวมถึงรูปแบบของ space
ความสัมพันธ์ของวัตถุและผู้ดูเมืองหรือ
ผู้สังเกตการณ์เมือง
3. ความหมาย (Meaning)
วัตถุนั้นต้องมีความหมายบางอย่างส าหรับ
ผู้ดูเมือง “สะดุดตา สะดุดใจ” ผู้ดูด้วยความหมาย
อย่างใดอย่างหนึ่ง
Cognitive map
/ Mental map
องค์ประกอบของเมือง
Components of the city
1. ทาง (Paths)
2. เส้นแนวขอบ/เขต (Edges)
3. ย่าน สถาน ถิ่น (Districts)
4. จุดเข้ม จุดตัด (Nodes)
5. ที่หมายตา (Landmarks)
PATHS
ทาง หนทาง เส้นทาง
PATHS
ช่องทางที่ผู้คนใช้ประจ า มนุษย์ใช้ชีวิตริมทาง
เดินทาง ใช้ชีวิตผ่าน+มีปฏิสัมพันธ์กับทาง
ทางเป็นองค์ประกอบเมืองที่มีอ านาจสูงสุด
ผู้คนจะสังเกตเมืองไปตามทาง และจากทางนี้
ที่หลายสิ่งหลายเรื่องราวเกิดขึ้น
หลายคนมีภาพประทับใจในหนทางต่างๆ
คนคุ้นเมืองจะรู้จักซอกเล็กซอกน้อย ทางลี้ลับ
ทางหนีทีไล่ต่างๆ ของบ้านเมือง
ทางอีกหลายทางมีบทบาทเป็นเส้นทางแนวขอบ
เช่น ทางริมทะเล ทางริมท่าเทียบเรือ
ทางดีจะมีคุณสมบัติและคุณลักษณะพิเศษ เช่น
PATHS
ทางดีจะมีคุณสมบัติและคุณลักษณะพิเศษ เช่น
- ความเข้มข้นของการใช้สอยหรือกิจกรรมที่พิเศษ
เช่น ถนนสายช็อปปิ้ง ถนนคนเมือง ถนนสายบันเทิง ถนนสายอาหาร ถนนสายวัฒนธรรม ฯลฯ
- การเปิดมุมมองหรือจุดหมายปลายทาง
เช่น สู่อาคารส าคัญ ป่าเขา แม่น ้า สะพาน ฯลฯ
- คุณภาพของรูปร่างของทาง
ถนนที่กว้างเป็นพิเศษ เช่น ถนนราชด าเนิน ถนนที่แคบมาก เช่น ตรอกไก่แจ้ ตรอกขี้หมา
- ความใกล้ชิดกัน
เช่น ย่านสยามสแควร์ ย่านเยาวราช
เส้นทาง: ความเข้มข้นของการใช้สอย --- ตลาดร่มหุบ จ.สมุทรสงคราม
เส้นทาง: ความเข้มข้นของการใช้สอย --- Shinjuku Tokyo
เส้นทาง: ขนาดแคบพิเศษ + กิจกรรมชีวิตเข้มข้น --- Liulichang Beijing
EDGES
แนวขอบ เส้นเเนวขอบ เขต แนวตะเข็บ
EDGES
องค์ประกอบแนวเส้นของเมืองที่ไม่เรียกว่าทาง
ส่วนใหญ่ คือ แนวเส้นแบ่งดินแดนระหว่างย่าน
ที่แตกต่างกัน
ท าหน้าที่เป็นตะเข็บให้เห็นความแตกต่างของเขต
2 เขตที่ติดต่อกัน แต่ยังมีความเชื่อมโยงทางสายตา
(visual connection) หรือแม้กระทั่งความเชื่อมโยง
ทางกายภาพ (physical connection) ต่อกันได้
เช่น คลองโอ่งอ่าง แบ่งเขตย่านส าเพ็งกับย่านพาหุรัด
องค์ประกอบเมืองอาจมองดูเป็นเส้นทาง
แต่ถูกเน้นว่าเป็นเส้นแนวเขตด้วยลักษณะขอบเขต
ของมัน บ่อยครั้งแนวเขตจึงมีบทบาทเป็นทาง
EDGES
PATHS
ขอบเขต: สภาพภูมิประเทศ Onomichi Hiroshima
ขอบเขต: สภาพภูมิประเทศ + มนุษย์สร้าง The Great Wall of China
ขอบเขต: มนุษย์สร้าง คลองโอ่งอ่าง กรุงเทพมหานคร
DISTRICTS
ย่าน สถาน ถิ่น
DISTRICTS
บริเวณที่อยู่ในเมืองที่คนดูเมืองสามารถนึกถึง
และเข้าไปสู่มันได้ในใจ
บริเวณที่มีลักษณะที่ผู้คนเห็นพ้องต้องกัน เป็น
ภาพในใจที่พ้องกัน สามารถรับรู้ได้ทั้งจากการ
เป็นจุดอ้างอิงภายในของคนในย่าน และจากการ
เป็นจุดอ้างอิงภายนอกของคนที่ผ่านหรือก าลัง
เข้ามาสู่ย่าน
คนเยี่ยมย่านมักจะรับรู้ว่าถิ่นนี้ ย่านนี้ “พิเศษ”
ต่างจากที่อื่นๆ และบอกได้ว่าเขาก าลังอยู่ใน
ย่านนั้น
DISTRICTS
ลักษณะทางกายภาพที่ก าหนดความเป็นย่าน
คือ ลักษณะความต่อเนื่องกันของ “theme” หรือ
“thematic continuities” ซึ่งอาจประกอบด้วย
องค์ประกอบที่หลากหลาย
เช่น สภาพภูมิประเทศ ชนิดอาคาร ผู้อยู่อาศัย ที่ว่าง
ผิวสัมผัส รายละเอียด สัญลักษณ์ ฯลฯ
ท าให้เกิด unity of diversity และความประทับใจ
ย่านสันทนาการและย่านธุรกิจ กรุงเทพ
ย่านสลัมคลองเตยและย่านธุรกิจ กรุงเทพฯ
ย่าน China town และย่านธุรกิจ สิงคโปร์
NODES
จุดตัด จุดเข้ม จุดรวมพล
NODES
จุดแห่งความส าคัญในเมือง เป็นจุด “ยุทธศาสตร์”
ของเมืองที่ซึ่งผู้คนดูเมืองสามารถเข้าถึงได้ในฐานะ
- จุดเข้ม (thematic concentrations)
- จุดตัดกันของระบบทาง (junctions of paths)
Nodes ที่รับรู้ได้ง่าย มักจะมีความเด่นเฉพาะตัว
และมีความหนาแน่นของลักษณะบางอย่างที่
แวดล้อมอยู่ ทั้งในยามปกติหรือยามเทศกาล
จุดตัด + จุดเข้ม Shibuya crossing Tokyo
จุดเข้ม Piazza San Marco Venice
จุดตัด + จุดเข้ม ตลาดน ้าอัมพวา จ.สมุทรสงคราม
LANDMARKS
ที่หมายตา จุดอ้างอิง
LANDMARKS
องค์ประกอบทางกายภาพพื้นฐาน ซึ่งถึงแม้จะมี
ขนาดแตกต่างกัน แต่มักมีกายภาพที่เป็นเอกภาพ
มีเอกลักษณ์ หรือความพิเศษ จดจ าได้ง่าย
ในบริบท
ที่หมายตาจะเป็นสิ่งที่ง่ายที่จะระบุหรือดูส าคัญ
เมื่อรูปทรงมีความชัดเจนหรือมีความแตกต่างกัน
เมื่อเปรียบเทียบกับฉากหลัง หรือเมื่อมีต าแหน่ง
ใน space ที่เด่น หรือเมื่อที่หมายตานั้นมีชื่อเสียง
มีเรื่องราว หรือมีประวัติศาสตร์อันส าคัญ
กิจกรรมที่เกี่ยวข้องกับที่หมายตาจะช่วยให้
ที่หมายตาจับใจมากขึ้น
ที่หมายตา: โตเกียวสกายทรี
ที่หมายตา: ภูเขาไฟฟูจิ
ที่หมายตา: พระปรางค์วัดอรุณ
Frame of orientation
กรอบอ้างอิง
Way finding process
กระบวนการหาทิศทาง
visualize
Negative Space
'Positive' and 'Negative' types of space can
be distinguished through figure-ground
reversal. Where outdoor spaces are
negative, the buildings are the figure and
outdoor space is the ground.
Site analysis
We should always remember that a
site is never inert but is an ongoing
set of very active networks that are
intertwined in complex relationships.
May include state map and
city map showing location of site in relation
to city as a whole. City map may also show
distances and travel times to related
functions in other parts of the city.
Presents the immediate surroundings of the
site for perhaps three to four blocks beyond
the site boundary. This may be extended
further to include an important factor or
because of the scale of the project. Map
may show existing and projected uses,
buildings, zoning and any other conditions
that may have an impact on our project.
Documents all the dimensional aspects of
the site including boundaries, location and
dimension of easements and present zoning
classification with all its dimensional
implications (setbacks, height restrictions,
parking formulas, allowed uses, etc.) and
buildable area
This category presents the legal description
of the property, covenants and restrictions,
present ownership, present governmental
jurisdiction (city or county) and any future
projections that may influence the project
Includes contours, drainage patterns, soil
type and bearing capacity, trees, rocks,
ridges, peaks, valleys, pools and ponds.
Documents on site conditions such as
buildings, walls, drives, curb cuts, hydrants,
power poles and paving patterns. Off site
features may include characteristics of
surrounding development such as scale, roof
forms, fenestration patterns, setbacks,
materials, colors, open spaces, visual axes,
paving patterns, landscaping materials and
patterns, porosity and assertiveness of wall
forms and accessories and details.
Presents all vehicular and pedestrian
movement patterns on and around the site.
Data includes duration and peak loads for
surrounding vehicular traffic and pedestrian
movement, bus stops, site access edges,
traffic generators, service truck access and
intermittent traffic
This category deals with the type, capacity
and location of all utilities on, adjacent to
and near the site. Typical utility types
include electricity, gas, sewer, water and
telephone.
Documents the visual, audible, tactile and
olfactory aspects of the site, Typical issues
are views to and front the site and noise
generated around the site. It is of value to
record the type, duration, intensity and
quality (positive or negative) of the sensory
issues. As discussed earlier, this often
involves making some judgments relation
about the relative desirability of the different
sensory conditions on and around the site.
Includes an analysis of the surrounding
neighborhood in terms of cultural,
psychological behavioral and sociological
aspects. This category is different from
"Neighborhood Context" listed earlier in that
the latter addresses the physical while this
category deals with the activities, human
relation ships and patterns of human
characteristics.
humidity and temperature variations over
the months of the year.
Presents all the pertinent climate conditions
such as rainfall, snowfall humidity and
temperature variations over the months of
the year.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
our building or buildings as wholes
before we can address the location of
their spaces.
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
\
\
1r
our building or buildings as wholes
before we can address the location of
their spaces.
l \
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
\
\
1r
our building or buildings as wholes
before we can address the location of
their spaces.
l \
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
\
\
1r
our building or buildings as wholes
before we can address the location of
their spaces.
l \
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
\
\
1r
our building or buildings as wholes
before we can address the location of
their spaces.
l \
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
\
\
1r
our building or buildings as wholes
before we can address the location of
their spaces.
l \
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
\
\
1r
our building or buildings as wholes
before we can address the location of
their spaces.
l \
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
\
\
1r
our building or buildings as wholes
before we can address the location of
their spaces.
l \
The third approach is appropriate
where the project is particularly large
with several site components. Here we
may need to deal with the placement of
\
\
1r
our building or buildings as wholes
before we can address the location of
their spaces.
l \