RISK-BASED INSPECTION METHODOLOGY, PART 2—PROBABILITY OF FAILURE METHODOLOGY 2-27

Thin

p3

Co is the conditional probability of inspection history inspection effectiveness for damage state 3

COV P

COV S f

COV ∆t

D

is the pressure coefficient of variance

is the flow stress coefficient of variance

is the thinning coefficient of variance

is the component inside diameter, mm (mpy)

D S1 is the corrosion rate factor for damage state 1

D S2 is the corrosion rate factor for damage state 2

D S3 is the corrosion rate factor for damage state 3

Thin

D f

is the DF for thinning

Thin

D fB

is the base value of the DF for thinning

E

is the weld joint efficiency or quality code from the original construction code

F AM is the DF adjustment for AST maintenance per API 653

F DL

F IP

F OM

F SM

F WD

FS Thin

is the DF adjustment for dead-legs

is the DF adjustment for injection points

is the DF adjustment for online monitoring

is the DF adjustment for settlement

is the DF adjustment for welded construction

is the flow stress, MPa (psi)

I 1 Thin is the first order inspection effectiveness factor

I 2 Thin is the second order inspection effectiveness factor

I 3 Thin is the third order inspection effectiveness factor

Thin

N A is the number of A level inspections

Thin

N is the number of B level inspections

B

Thin

N is the number of C level inspections

C

Thin

N is the number of D level inspections

D