5-94 API RECOMMENDED PRACTICE 581Probablitly of Loss of Containment (failures/year)10 210 1GFFT x DF10 010 -110 -210 -3DF = 1DF = 500DF = 200010 -4DF = 500010 -50.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5Pressure Ratio (Pressure/MAWP)For an example pressure vessel with:1. gff total = 3.06 × 10 −52. Design margin = 43. Estimated burst pressure of 4 × MAWPFigure 5.7—Probability of Loss of Containment as a Function of Overpressure30,000Risk Tolerance = $25,000/yearRisk Tolerance =$ 10,000/year25,000Calculated Risk, $/year20,00015,00010,0005,00000 2 4 6 8 10 12 14 16 18YearsFigure 5.8—Inspection Test Updating of PRDs
CONTENTS5.A.1 General ........................................................................................................................................... 15.A.2 References ..................................................................................................................................... 15.A.3 Determining Weibull Parameters ................................................................................................. 15.A.4 Required and Recommended Data to Perform a Weibull Analysis .......................................... 25.A.5 General Steps to Determine Weibull Parameters from an Exchanger Bundle ReliabilityLibrary ....................................................................................................................................................... 25.A.6 Example Determination of Weibull Parameters using Weibayes Analysis with a ReliabilityLibrary ....................................................................................................................................................... 35.A.7 Nomenclature ................................................................................................................................. 45.A.8 Tables ............................................................................................................................................. 55.A.9 Figures ............................................................................................................................................ 6
- Page 593 and 594: RISK-BASED INSPECTION METHODOLOGY,
- Page 595 and 596: RISK-BASED INSPECTION METHODOLOGY,
- Page 597 and 598: RISK-BASED INSPECTION METHODOLOGY,
- Page 599 and 600: RISK-BASED INSPECTION METHODOLOGY,
- Page 601 and 602: RISK-BASED INSPECTION METHODOLOGY,
- Page 603 and 604: RISK-BASED INSPECTION METHODOLOGY,
- Page 605 and 606: RISK-BASED INSPECTION METHODOLOGY,
- Page 607 and 608: RISK-BASED INSPECTION METHODOLOGY,
- Page 609 and 610: RISK-BASED INSPECTION METHODOLOGY,
- Page 611 and 612: RISK-BASED INSPECTION METHODOLOGY,
- Page 613 and 614: RISK-BASED INSPECTION METHODOLOGY,
- Page 615 and 616: RISK-BASED INSPECTION METHODOLOGY,
- Page 617 and 618: RISK-BASED INSPECTION METHODOLOGY,
- Page 619 and 620: RISK-BASED INSPECTION METHODOLOGY,
- Page 621 and 622: RISK-BASED INSPECTION METHODOLOGY,
- Page 623 and 624: RISK-BASED INSPECTION METHODOLOGY,
- Page 625 and 626: RISK-BASED INSPECTION METHODOLOGY,
- Page 627 and 628: RISK-BASED INSPECTION METHODOLOGY,
- Page 629 and 630: RISK-BASED INSPECTION METHODOLOGY,
- Page 631 and 632: RISK-BASED INSPECTION METHODOLOGY,
- Page 633 and 634: RISK-BASED INSPECTION METHODOLOGY,
- Page 635 and 636: RISK-BASED INSPECTION METHODOLOGY,
- Page 637 and 638: RISK-BASED INSPECTION METHODOLOGY,
- Page 639 and 640: RISK-BASED INSPECTION METHODOLOGY,
- Page 641 and 642: RISK-BASED INSPECTION METHODOLOGY,
- Page 643: RISK-BASED INSPECTION METHODOLOGY,
- Page 647 and 648: 5.A-2 API RECOMMENDED PRACTICE 5815
- Page 649 and 650: 5.A-4 API RECOMMENDED PRACTICE 581
- Page 651 and 652: 5.A-6 API RECOMMENDED PRACTICE 5815
5-94 API RECOMMENDED PRACTICE 581
Probablitly of Loss of Containment (failures/year)
10 2
10 1
GFFT x DF
10 0
10 -1
10 -2
10 -3
DF = 1
DF = 500
DF = 2000
10 -4
DF = 5000
10 -5
0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5
Pressure Ratio (Pressure/MAWP)
For an example pressure vessel with:
1. gff total = 3.06 × 10 −5
2. Design margin = 4
3. Estimated burst pressure of 4 × MAWP
Figure 5.7—Probability of Loss of Containment as a Function of Overpressure
30,000
Risk Tolerance = $25,000/year
Risk Tolerance =$ 10,000/year
25,000
Calculated Risk, $/year
20,000
15,000
10,000
5,000
0
0 2 4 6 8 10 12 14 16 18
Years
Figure 5.8—Inspection Test Updating of PRDs