API RP 581 - 3rd Ed.2016 - Add.2-2020 - Risk-Based Inspection Methodology

luis.alberto.mayorga.plaza
from luis.alberto.mayorga.plaza More from this publisher
17.12.2020 Views

5-92 API RECOMMENDED PRACTICE 581.8000.7000.6000.5000POFOD.4000MildModerateSevere.3000.2000.1000.00000 2 4 6 8 10 12 14 16 18 20YearsFigure 5.3—Default Conventional PRV Fail to Open on Demand Weibull Curves.9000.8000MildModerateSevere.7000.6000POL.5000.4000.3000.2000.1000.00000 2 4 6 8 10 12 14 16 18 20YearsFigure 5.4—Default Leakage Failure Rate for Conventional PRVs

RISK-BASED INSPECTION METHODOLOGY, PART 5—SPECIAL EQUIPMENT 5-9354.543.5Actual Failure DataAdjusted CurveFailure Rate (%)32.52Failure rate is constant with overpressure1.510.501 1.5 2 2.5 3 3.5 4Overpressure Ratio (Pop Pressure/Set Pressure)Figure 5.5—PRD Failure Rate as a Function of Overpressure.6000.5000POFOD.4000.3000SevereModified SevereEffect of Environmental ModifierModified POFOD Curve.2000Default POFOD Curve.1000.00000 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15Years In ServiceFigure 5.6—Effect of Environmental Factors on PRD Weibull Curves

5-92 API RECOMMENDED PRACTICE 581

.8000

.7000

.6000

.5000

POFOD

.4000

Mild

Moderate

Severe

.3000

.2000

.1000

.0000

0 2 4 6 8 10 12 14 16 18 20

Years

Figure 5.3—Default Conventional PRV Fail to Open on Demand Weibull Curves

.9000

.8000

Mild

Moderate

Severe

.7000

.6000

POL

.5000

.4000

.3000

.2000

.1000

.0000

0 2 4 6 8 10 12 14 16 18 20

Years

Figure 5.4—Default Leakage Failure Rate for Conventional PRVs