RISK-BASED INSPECTION METHODOLOGY, PART 5—SPECIAL EQUIPMENT 5-41

Life Extension Method

Table 5.2—Effects of Bundle Life Extension Methods

Life Extension Factor (LEF) c

Plug Tubes 0.10

180° Bundle Rotation 0.50

Partial Re-tube 0.50

Total Re-tube 0.90

Install Spare Bundle b 0.50

Install Tube Ferrules a 0.75

a

This LEF is only valid when the tube ferrules are installed for protection against localized, tube-end damage due to

erosion, corrosion or impingement.

b

The spare bundle condition is known to be good through prior inspection. If the condition of the spare bundle is

known to be excellent, a higher LEF can be used.

c

LEFs provided in this table are suggestions. It is the responsibility of the owner-user to define life extensions for use

for the bundle life extension methods.

Table 5.3—Bundle Material Cost Factors

Bundle Generic Material

Tube Material Cost Factor,

M

f

Carbon Steel 1.0

C-1/2 Mo 2.0

1-1/4 Cr 2.0

2-1/4 Cr 2.8

5 Cr 3.2

9 Cr 3.3

12 Cr 3.4

70/30 CuNi 3.5

90/10 CuNi 3.5

Monel 400 7.0

Nickel 200 8.5

304/309/310 SS 2.6

304L/321/347 SS 2.8

316 SS 3.0

316L SS 3.0

317L SS 4.2

410/439 SS 2.8

444 SS 3.2

904L 7.0

2205 Duplex SS 3.0

2304 Duplex SS 2.8

2507 Duplex SS 4.0