5-40 API RECOMMENDED PRACTICE 581

Tables

Bundle Remaining Life Methodology

Specified MTTF

Specified Weibull η

Specified Weibull β

Bundle Life

Consequences of Bundle Failure

Financial Risk Target

Table 5.1—Basic Data for Exchanger Bundle Risk Analysis

User specified MTTF for bundle, years to be used in

calculation

User specified Weibull characteristic life (years) to be used in

calculations ( β must also be provided)

User specified Weibull slope parameter to be used in

calculations (η must also be provided)

The life of the bundle under evaluation, years (required for

inactive bundles)

User risk target, $/year

Tube Wall Failure Fraction

Wall thickness fraction that constitutes bundle failure (0 and

1.0)

Production Cost

Unit production costs, $/day (should be equal to the

production rate, bbls/day x margin ($/bbl)

Production Impact

Production impact, e.g. none, bypass, bypass with rate

reduction, shutdown

Rate Reduction

Rate Reduction, % (required if Production Impact is Bypass

with Rate Reduction”)

Planned Shutdown Days

Number of days required to repair or replace failed

exchanger bundle when the shutdown is planned, days

Number of days required to repair or replace failed

exchanger bundle when the shutdown is unplanned, days

Unplanned Shutdown Days

(should be a longer duration than a planned shutdown to

allow for lead time to mobilize or to purchase a replacement

bundle)

Environmental Impact

Environmental costs associated with bundle failure that

includes damage to cooling water system and towers

Lost Opportunity Cost

Additional cost beyond production losses or environmental

costs as a result of bundle failure, $

Bundle Cost Cost of replacement bundle, $

Bundle Installation Cost

Cost of maintenance required to remove, clean, and re-install

exchanger bundle, $

Hurdle Cost

Additional cost above the economic breakeven point at which

a decision to inspect or replace a bundle is made, $

Turnaround Date 1

The date for the next scheduled turnaround from the RBI

date (used as Plan Date for calculating risk)

The date for the second scheduled turnaround from the RBI

Turnaround Date 2

date (used in the cost benefit analysis to make inspection or

replacement decisions)