RISK-BASED INSPECTION METHODOLOGY, PART 5—SPECIAL EQUIPMENT 5-19

Tank ,Thin

D f

is the DF for thinning

d

n

tank

is the diameter of the

D is the storage tank diameter, m (ft)

th

n release hole, mm (inch)

Thin

D fB is the base value of the DF for thinning

E

is the weld joint efficiency or quality code from the original construction code

F is the DF adjustment for AST maintenance per API 653

AM

F LC

is the DF adjustment for lining condition

F is the DF adjustment for online monitoring

OM

F is the DF adjustment for settlement

SM

F is the DF adjustment for welded construction

WD

FC is the financial consequence of environmental clean-up, $

environ

FC is the financial consequence of component damage, $

cmd

FC is the financial consequence of lost production on the unit, $

prod

FC is the total financial consequence, $

total

leak

FC

environ

is the financial consequence of environmental cleanup for leakage, $

rupture

FC

environ

is the financial consequence of environmental cleanup for leakage, $

g is the acceleration due to gravity on earth at sea level = 9.81 m/s 2 (32.2 ft/s 2 )

gff

are the generic failure frequencies for each of the n release hole sizes selected for the type of

n

equipment being evaluated

gff is the sum of the individual release hole size generic frequencies

liq

total

h is the maximum fill height in the storage tank, m (ft)

k

h

h,

prod

is the soil hydraulic conductivity, m/day (ft/day)

k is the soil hydraulic conductivity based on the storage tank product, m/day (ft/day)

k

h,

water

is the soil hydraulic conductivity based on water, m/day (ft/day)

kh,

water− lb

is the lower bound soil hydraulic conductivity based on water, cm/s (in/s)

kh,

water− ub

is the upper bound soil hydraulic conductivity based on water, cm/s (in/s)

ld

n

is the actual leak duration of the release based on the available mass and the calculated

th

release rate, associated with the n release hole size, day

th

Lvol is the total liquid volume for the n release hole size, m 3 (ft 3 )

above,

n

Lvol is the available liquid volume for the

avail,

n

th

n release hole size, m 3 (ft 3 )

Lvol

above,

i

is the total liquid volume above the i th

storage tank course, m 3 (ft 3 )

Lvol

total

is the total liquid volume in the storage tank, m 3 (ft 3 )

LHT

above,

i

is the liquid height above the i th

storage tank course, m (ft)

matcost is the material cost factor

mass is the available mass for release. barrels

N

c

th

n

total

is the total number of storage tank courses

is the representative holes sizes